BFC6/BFC6-II SCALE PALLET TRUCK

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:








Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the relevant content of the flow of materials, storage and usage
Unitized packaging and standardization is the foundation of the enterprise logistics work, for the protection of the components, the follow-up of logistics planning and the determination of through put play a key role. Adopt the reasonable unitized equipment, can reduce the invalid labor (such as inversion, not fall to the ground) in the process of machining, improve labor efficiency, simplify the site management, reduce the security hidden danger. The idea of packaging unitization and standardization is controlled mainly from macro and micro level. On the macro level, we need to set the size chain for all materials from the perspective of the supply chain. From the tray to the turntable, the special frame should be coupled with this dimension chain. On the micro level. In order to meet the basic requirements of packaging design, such as the principle of protecting spare parts and saving space, choose the proper packaging materials, internal separation materials and so on. At the same time, the loading number of the packaging unit should be fixed so as to reduce the statistical workload of the on-site staff. Some factories have higher management requirements for packaging and line workstations, which require the packaging to be incorporated into the day-to-day management of the process. For packaging, cleaning, cleaning (cleaning oil, labeling, etc.), repair, storage, etc.
Q:There are three things to do when the material is stacked up and down
Fire proof, waterproof and center of gravity
Q:Talk about how to cut the cost of moving materials.
Cost direct costs and indirect costs. Direct costs are inputs and manpower.I hope my answer will help you
Q:The material needs to be transported, it is easy to produce dust.
We're doing the granule engineering, and we can talk about this: First: the properties of material itself, temperature, contact material, ability, distance and so on The second: the material that produces dust easily, the simplest principle is relatively close, ideal method is low speed of course. Third: as far as you are going to be able to transport it, you will have to sit down and discuss it
Q:Material handling system in the factory
Improve logistics quality (material loss, high transport efficiency, safety operation), lower logistics cost (including handling, storage etc.).
Q:What is the material handling and handling equipment?
 The shelf storage system Pallet racking | cantilevered shelves shelves | | gravity type rotary rack | pick racking system 4. Automated multi-layered storehouse stacker | | stacking robot horizontal rotary automatic vertical type rotary library | automatic library | tray type automatic library 5. Cold chain equipment Refrigerator car | | cooler cold box | | 6. Other refrigerator storage site finishing equipment workshop equipment | turnover box | flexible bar | | plastic cage car truck 7. Bar code identification system data acquisition equipment | radio frequency identification (RFID) system | data terminals
Q:What is the proof of working in mechanical design?
Don't waste your time in school textual research, the engineering drawing, mechanical principle, mechanical design, such as professional course learning, course design, graduation design with a good, better than nothing; Of course, there are some foreign investment that is required for the level 4, and there are exceptions. You design it well, and English doesn't matter.
Q:The function of material handling
Material handling USES all kinds of power and transport machinery to keep the material, such as count, punctually, safely, economically, and to the designated place. It is closely related to the choice of site selection and professional cooperation in the outside material handling machinery factory.
Q:What are the requirements for the science of loading and unloading
Use material handling activities to improve control of production, inventory and order processing. Use the transport equipment to improve the production capacity. The cost of moving the unit to determine the performance of the transport. Provide appropriate means and equipment to enhance the handling safety.
Q:What are the potential defects of the automated material handling system?
In manufacturing and material handling, the automatic pilot (AGV) has become increasingly familiar. But the shuttle, which is introduced here, is based on the equipment that automatically carries the material in the path of the orbit. Machine commonly used in existent shelves, existent shelves for its high space utilization, accepted by a lot of storage and transportation unit, but forklift truck into the tunnel, because the space is narrow, there are shelves safe hidden trouble. In addition, using forklift and human handling inefficient, high cost, on the basis of the original shelves introducing automation machine, in order to improve the automatization level of the whole line production storage and transportation.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range