BFC6/BFC6-II SCALE PALLET TRUCK
- Ref Price:
- Loading Port:
- China Main Port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- -
- Supply Capability:
- -
- OKorder Service Pledge
- Quality Product
- Order Online Tracking
- Timely Delivery
- OKorder Financial Service
- Credit Rating
- Credit Services
- Credit Purchasing
- Q:What is the relevant content of the flow of materials, storage and usage
- The transport system, the choice of carrying technology and equipment. To some extent determine the distribution and operation of the production logistics system. And the efficiency, complexity, size and economic effect of the production system are very strong. The important problem in production logistics is choosing the right transport equipment. These devices should be able to adapt to the nature, weight, shape, size and material flow of the moving material. We need to keep the fixed investment of the equipment low, and we need to meet the demand for moving. There are several kinds of moving, intermittent, and round-trip, which are divided into horizontal, oblique, vertical or two-dimensional direction. Other transport requirements include: channel flow shunt, location stop, high-speed moving, product placement, etc. Also consider moving objects and environments such as forming, powder, drying environment and cleaning environment. Finally, the mode of carrying, the combination of the equipment and the quantity of the specification are determined. The speed requirements of the transport are based on the production beat.
- Q:The function of material handling
- Material handling machinery factory factory factory logistics system in logistics system involving the coordination of production plan, process flow, handling operation, warehouse management, information system and so on various aspects. High quality and safe operation, lower logistics cost (including transportation, storage etc.). The main logistics system of the manufacturing process of the complex machine factory
- Q:The development of material handling
- Domestic market competition is the basic material handling machinery, high-end market is mainly composed of multinational companies, domestic key large enterprise also had some markets in some specific fields; The participants in the mid-market market include large enterprises in China and small and medium-sized enterprises with excellent manufacturing technology and high management level. Many of the small scale, poor technology, poor management, lack of product innovation of enterprise, product quality is not high, low added value, poor economic benefit, in the industry of low-end market, competition is intense. "Twelfth five-year" period to 2020, is China's national economy sustainable development strategy implement and promote the development of circular economy, take a new road to industrialization, the basis for building a resource-conserving and environment-friendly society an important period. Attaches great importance to the society and the enterprise logistics role, vigorously develop modern logistics industry, to promote the development of and promote industry, improve the quality and efficiency of economic operation, enhance the comprehensive national strength and the enterprise competitiveness, has the very vital significance. It is an effective means of carrier for all walks of life of the national economy, including the manufacturing of material handling equipment which supplies the large amount of equipment needed for the second and third industries. The rapid and steady development of the national economy, the informationization and industrialization of the basic industries, provide the best opportunities for the manufacturing industry of materials handling equipment.
- Q:Why should we emphasize unitization and standardization in material handling
- Reducing the degree of climate impact, ensuring normal work, accelerating the flow of goods and improving efficiency. 1) logistics base module The logistics base modulus is the minimum size of the standard size of the logistics system. In basic module size was determined, the size of the various specific standards, should be based on basic module size, select the integer times to the prescribed standards for size, foundation modulus size is determined, just a standard size in multiple choice, it can be used as a standard of other size.
- Q:Talk about how to cut the cost of moving materials.
- There is limited room for human efficiency.I hope my answer will help you
- Q:What is the material handling and handling equipment?
- Lifting equipment Small lifting equipment | gantry crane | | bridge cantilever crane | 2 vertical mechanical unit transportation equipment | gravity conveyor power conveyor parts | | | other comprehensive transportation system
- Q:What are the requirements for the science of loading and unloading
- Mechanized the moving operation. Provide functions such as production, handling and storage. The various elements of the moving material should be considered when choosing the moving equipment, including the moving and method used. Standardize the type and size of the handling and handling equipment. Adopt methods and equipment that can be adapted to all kinds of work and applications, unless you have to use a special visual device.
- Q:What is the carrying equipment of the container cargo
- Shockproof and vacuum packaging, equipment hoisting, lower layer, translation, adjustment level, container (container), import crane, forklift professional service.
- Q:What are the potential defects of the automated material handling system?
- In manufacturing and material handling, the automatic pilot (AGV) has become increasingly familiar. But the shuttle, which is introduced here, is based on the equipment that automatically carries the material in the path of the orbit. Machine commonly used in existent shelves, existent shelves for its high space utilization, accepted by a lot of storage and transportation unit, but forklift truck into the tunnel, because the space is narrow, there are shelves safe hidden trouble. In addition, using forklift and human handling inefficient, high cost, on the basis of the original shelves introducing automation machine, in order to improve the automatization level of the whole line production storage and transportation.
- Q:What is the proof of working in mechanical design?
- Don't waste your time in school textual research, the engineering drawing, mechanical principle, mechanical design, such as professional course learning, course design, graduation design with a good, better than nothing; Of course, there are some foreign investment that is required for the level 4, and there are exceptions. You design it well, and English doesn't matter.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Similar products
New products
Hot products
You Might Also Like