• aluminium square diffuser System 1
  • aluminium square diffuser System 2
  • aluminium square diffuser System 3
aluminium square diffuser

aluminium square diffuser

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
50000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Square Ceiling Diffusers

Description:

Square Ceiling Diffusers are designed to provide excellent directional performance typically in a 4 way airfow pattern.

The Louvre Face Diffuser is generally flush mounted to the ceiling line. This frame style is extremely versatile and is ideal for a lay-in application where the diffuser is placed into a T-Bar ceiling grid. The Louvre Face Diffuser may be used in place of a modular ceiling tile without any need arising to alter the T-bar construction.

It is easy for installation with its removeble core.

Ceiling diffusers blend seamlessly into modern office and commercial building ceilings.


Features:

Materials: Aluminium

Construction; Frames have punched in corner, in addition to welded joints.

            Welded blade cores.

            Aluminium tube supports blade cores inside frame.

Core: Removable with safety cord/ chain under

Color: Standard- RAL 9010 RAL9016 or Anodized

Opposite Blade Damper Optional

Standard Size:

Neck Size 145*145 Face Size 295*295 Height 51.2

Neck Size 220*220 Face Size 370*370 Height 51.2

Neck Size 295*295 Face Size 445*445 Height 51.2

Neck Size 370*370 Face Size 520*520 Height 51.2

Neck Size 445*445 Face Size 595*595 Height 51.2



Q:I added the space 18 degrees opened for 5 hours or not cold, we all know how is it? More
Common points are all sandwich panels, with a hard protective layer, the difference is the middle of the different materials, such as polystyrene board, polyurethane board. Polystyrene board which is the most common, because the price is cheap, easy to use so the use of more, but if the temperature is more than the requirements of the chicken inertia glycosylation moxibustion slim faint words, polystyrene board is not satisfied , So there is a polyurethane sandwich panels, polyurethane thermal conductivity of less than 0.. in the existing insulation materials, large quantities of processing, be the best. But because of its process is more complex, and the cost is relatively high, so with less, the common combination of cold storage and the like, I believe that with the economic and technological development, polyurethane sandwich board market share will be more and more High
Q:The installation method of ordinary air conditioner. The more detailed the better. Please thank you all
2.1.23 step distance liftheight the distance between the upper and lower horizontal axis of the axis of each other. 2.1.24 pole vertical (cross) distance longitudinal spacingofuprighttube Scaffolding vertical distance between adjacent rods. 2.1.25 Vertical distance transversespacingofuprighttube Scaffolding Horizontal distance between adjacent vertical rods, single row scaffolding for the outside pole axis to the wall distance.
Q:HVAC Heating: What are the main components of the air distribution system?
(HS Code) Yes, the tax rebate is 13% (April . 2009 latest data). Floor of the board of the tax number is, the tax rebate is 9% (June . 2009 the latest data), floor board is the inspection of goods, exports need to be checked. There is nothing to understand where to add me MSN:
Q:Such as the problem, and now air-conditioning technology is mature, the market a lot of air conditioning are cold and warm, and I would like to be able to put my home that the end of the century loaded Mitsubishi air conditioning (split single cold) into a cold Before the conversion of ordinary TV to the remote control, that air conditioning can be modified? How much does it cost? Where is this technology? More
Air conditioning heating than the cooling power consumption, power consumption and ambient temperature and set the temperature has a great relationship, the general cooling 1 hour 1-2 degrees, heating if the auxiliary heating about 2-3 degrees. If you want to save the appropriate temperature can be set higher, the general and the ambient temperature difference of about 5 degrees people feel more comfortable, shut off undesirable, not reach the purpose of saving.
Q:In the design, the building structure and the hydropower are generally designed by the Architectural Design Institute. The air conditioning ventilation is based on the design of the room. Or first air conditioning ventilation? More
Decoration refers to the home improvement part, housing construction is the content of the building
Q:Air conditioning machine work when the sound is too much reason
This is based on the density of benzene board decision, not what you said, know it buddy.
Q:External wall insulation method of operation There are several combinations of materials
Seeking the existing building construction specifications Daquan! The The @
Q:If I feel the room cool off, one hour hot and open an hour this will be more expensive? More
But after all, is the master you want to Zhuo good jade is certainly a lot of difficulties, whether it is Longfeng Pei or other subject matter need a lot of effort in addition to the need for technical research also need to continue to learn theoretical knowledge, especially
Q:What is the whole heat exchange fresh air ventilator?
Depends on the main control panel is not cold and warm, single cold common motherboard. Only a generic motherboard can be changed. In the single cold air-conditioning on the outdoor machine to install the appropriate specifications of the four-way valve, adjust the amount of refrigerant to the appropriate level can be.
Q:Air to water heater host and air conditioning host is not the same
This test with a small sample length 127mm, width 12.7mm, the maximum thickness of 3.2mm. In the absence of ventilation test chamber. The top of the specimen (6.4 mm place) is clamped with a clamp on the bracket and the longitudinal axis of the specimen is kept vertical. The lower end of the specimen is 9.5mm from the lamp tip and 305mm from the dry absorbent cotton surface. Bring the Bunsen burner and adjust it to produce a blue flame with a height of 19mm. Place the Bunsen Lights flame at the bottom of the sample for 10s, then remove the flame (at least 152mm away from the specimen) and write down the sample. Burning time. If the flame of the sample within 30s after removal of the flame is extinguished, the original lamp must be moved under the specimen again, re-ignite the sample for 10s, and then remove the Bunsen burner again and note the flame burning And flames burning the burning time. If the sample droplets drip, let it fall into the sample under the 305mm cotton, to see whether it ignited cotton. If the absorbent cotton is on fire, the rating should be taken into account. Specific grading indicators are as follows. Test Item 94V-094V-194V-21 Ten-time ignition Total flame burning time Maximum value (S) Individual flame burning time Maximum value (s) Flameless burning time (s) Yes Flame drop No No Allow only short time Burning general UL yellow card on the thickness of the test strip is divided into: 1/8 inch, 1/16 inch, 1/32 inch thickness, that is, 3.2mm, 1.6mm, 0.8mm three grades test.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords