Wordwide Sailing Cuplock Scaffolding System for Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 400000 pc/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
1. Structure of Cup-lock Scaffoldin
Cup-lock Scaffolding consists of adapter plug of cup-lock, post, cross bar ,diagonal brace ,top bar, base and other fittings
Place of Origin: China (Mainland)
Scaffolding: Cup-lock scaffolding
Quick lock scaffolding: Cup Lock Scaffolding for Sale
2. Main Features of Cup-lock Scaffolding
.Multifunction: equipments of construction with different size and load of construction could be assembled, such as one-size double-sides scaffolding, props, etc. Applied to high-rise building, bridge, water tower, and so on.
.Avoid using bolt in assembly and low down labor intensity
.Reliable bending, shearing, torsional strength of dentation &cup-lock connection, the overall of it is more stable than normal
3. Cup-lock Scaffolding Images
4. Cup-lock Scaffolding Specification
Simple structure.
Safety and Steady.
Multi using
High loading
Re-used
Components:
Name | Size | Material | Tube size | Surface | Theoretic weight |
Vertical Standard | 1000mm | Q345 Steel or Q235 Steel | Φ48.3*3.2mm | Painted | 4.97kg |
1500mm | 7.46kg | ||||
2000mm | 9.94kg | ||||
2500mm | 12.43kg | ||||
3000mm | 14.91kg | ||||
Ledger | 600mm | Q345 Steel or Q235 Steel | Φ48.3*3.0mm | Painted | 2.34kg |
900mm | 3.35kg | ||||
1000mm | 3.67kg | ||||
1200mm | 4.40kg | ||||
1500mm | 5.33kg | ||||
1800mm | 6.32kg | ||||
2000mm | 6.90kg |
- Q:Single double scaffolding distinctionPlease list the sketch map
- Rely on the contact surface friction force transmission, that is, by the contact surface of the node after the compression of the friction force to support the transverse load and transfer it to the vertical pole, such as the role of the fastener, by tightening the positive pressure of the bolt to produce friction;2 by the welding force transmission. Most of the cross bar and vertical rod socket connection is used in this way, the door frame is also this way;3) direct pressure transmission force. This method is more common in the horizontal bar on the top of the scaffolding;4. The shear force of the dowel bar is connected with the vertical connection plate of the cross bar and the hole of the vertical rod to realize the connection and the shear force between the two sides of the pin rod
- Q:I am considering getting an ear scaffolding, and was wondering, is it girly???
- is there a pic somewhere? ok i googled it, and it is just that long bar that goes through the top of the ear twice, and i actually know more guys with it than girls, but i am not going to lie... cartilidge piercings hurt, not when you get them done, but later on, and that has gotta be hella uncomfortable.
- Q:What does it mean in the phrase that one can have toxic people in their life and still maintain stability as long as we build a scaffolding?
- One of the definitions for scaffolding is a platform or structure on which criminals are killed by being hanged or beheaded. ...It's tempting, but that's probably not what they meant. The other way to look at it is as a stable structure you stand upon while you're working on something unstable. When you are involved with toxic people, you should not rely on them too much, because their effects on you can range anywhere from disappointment to harm. A well structured life that doesn't really need that person for survival or happiness can help you be more resilient.
- Q:Now there are many kinds of scaffolding market, like what wheel buckle scaffolding, scaffolding, scaffolding, what.
- Now most of the crowd is the bowl buckle scaffolding, but now slowly being eliminated by the market. That is the fastest, most new type of scaffolding, especially if you want to have to lease it, scaffolding is more appropriate.
- Q:Bowl buckle scaffold construction needs to pay attention to what problems
- Bowl buckle scaffold construction need to pay attention to the problem is:Safety technical clarification before construction. ?Strictly in accordance with the requirements of the construction plan and set up in accordance with the JGJ59-99 scaffold inspection requirements for acceptance
- Q:Bowl buckle type steel pipe scaffold and full fastener type scaffolding are long what kind of? What is the difference
- But do not rule out this situation, as the difference between these two scaffolding
- Q:Why the scaffolds need to be inspected within the preceding 7 days and after adverse weather condition?
- So you don't fall. The reason you want the inspection to be recent is that people change things when you're not looking. Or, the wind could move something that you're not expecting.
- Q:I really want to get an industrial piercing but I'm going to a music festival in about a month... If I get it done this weekend, will a month be time enough for it to heal, because I plan on being drunk for that whole festival so I doubt I'll find time to clean it haha..Should I get it done, or wait until after the festival?..Thanks :) x
- If you want it now, get it done! One weekend of not cleaning it is no big dee, especially after it's a month old. Just make sure to clean it right before and after the festival. It'll be fine :) have fun!
- Q:Wankou scaffolding steel scaffolding and look like? What's the difference?
- The bowl buckle scaffold is used as a bridge support or is more than a full frame, and steel pipe fastener scaffolding used to build more than two rows of shelves, rarely used as support
- Q:Why does this discovery both confuse and frighten her?quot;The Scarlet Letterquot;
- her husband, he has been in England while she was in America for a year or 2 can't remember; I think she thought he was dead or not coming cannot remember. It frightens her because she has a kid that cannot be his.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Wordwide Sailing Cuplock Scaffolding System for Building
- Loading Port:
- Tianjin
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 20000 pc
- Supply Capability:
- 400000 pc/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords