White Color Unique 2013 Led Battery Operated Lights

Ref Price:
$2.06 - 3.09 / pc
Loading Port:
Shenzhen
Payment Terms:
L/C,T/T
Min Order Qty:
5000 Pieces pc
Supply Capability:
1000000 Pieces pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

General Introduction 

led christmas lights

 

Feature 

Low temperture,Long life time,Low voltage-Save to use,Protect enviorment,there are 8kinds models to twinkle.

 

Specification

1,Model:raindrop

2,Wire color: Copper wire

3,Led color:white

4,Work Voltage:4.5V

5,Led distance:10cm

6,Length:3Meters ,contained the battery box' wire length

7,Can be added PVC tube and ribbon.

 

Before Orders
If possible, please tell us what's the purpose for using it, so that we can recommend you the best package. Of course with best price to you!
Any other request, please feel free to let us know.
SAMPLES are avaiable before order. 
OEM & ODM service is also avaiable

 
Our R&D department have more than 20 professional and technical personnel.We had help customers produce many OEM products for American Market,Germany Market and UK Market.
 

QC(Quality Control)
QC Team:More than 20 professional and technical personnel.

Material: Strictly control of material using, meet international requested standards.
Semi-finished Products Inspection: Product inspection before 100% finished. Such as Visual Inspection, Leak Testing, Comprehensive Safty Test and so on. 
Production Line Test: With work team or data engineer who will inspect machines and lines at fixed period.
Finished Product Inspection: Quality and property test before products are packed and loaded
  

Customized options

Customized label/ Logo can be made onto packing box.

 

Packaging & Delivery

 

Package:

1pc/pvc box , 300pcs/ctn , 46*30*35cm , NW:0.06 , GW:0.07kg

 

Delivery:

Shipping Service

Estimated Delivery Time

DHL

2-8 business days

FedEx

3-8 business days

TNT

2-10 business days

UPS

1-7 business days

EMS

6-14 business days

ePacket

7-12 business days

China Post Air Mail

7-15 business days

China Post SAL

14-30 business days

By sea

30-40 business days

1. 3-10 business days for Sample Orders; 7-40 business days for Bulk Orders.

2. "Business days" means Monday-Friday, excluding holidays.

3. DHL and UPS cannot ship to military or P.O. boxes address.

4. The Shipping Service above is for reference only, for any other questions, please feel free to contact us. 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The problem of intelligent lighting control
Intelligent lighting control system, or intelligent lighting monitoring system, will generally be divided into two categories: indoor and outdoor, indoor power lamps are generally small, the application environment is relatively poor.
Q:Colorful lighting, okay?
Lighting is a brand new resplendent with variegated coloration, in 2013 I bought the resplendent with variegated coloration can also feel, light, I go there to buy a house in the decoration lamp this year,
Q:The sign and meaning of energy saving lamp
A color mark marked with blue and white background, 50 mm long and 30 mm wide.
Q:CREE semiconductor lighting pay no
The Interim Provisions on payment of wages shall be stipulated in the seventh article: wages must be paid on the date stipulated by the employer and the employee.
Q:The festival lights are strung together by a number of small light bulbs connected to the lighting circuit
he voltage of each bulb was 22V, exceeding the rated voltage of the bulb, the bulb will be burned out. The A error.
Q:What are the energy saving measures for lighting and distribution?
the office, the computer room, the control room, the shop, the dining room, the guest room and the bathroom mirror lamp and so on should use the straight tube lamp, the decoration request high place may use the compact fluorescent lamp (hereinafter called CFL)
Q:What are the main technical measures for the implementation of energy-saving lighting?
The most basic principle is that different light sources should be chosen according to different places.
Q:Every home needs lighting bulbs, which are popular on the market now
two kinds of lamps all work normally, 5000h, the incandescent lamp needs to pay 180 yuan electricity charge, the electronic energy conservation lamp needs to pay 33 yuan electricity charge;
Q:What are some good suggestions for plant energy saving lighting modification?
the LED lamp replacement energy-saving fluorescent lamp, energy-saving lamp can reach more than 75% led
Q:What is the color temperature of a star hotel?
entrance channel lighting leads the vehicle safely to the entrance.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range