Vertical Support System Ringlock Scaffolding - Q345 & Q235

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Vertical Support System Ringlock Scaffolding - Q345 & Q235

Ring-lock Scaffolding consists of cup-lock connector, post, cross bar, diagonal brace, base and top brace. Safe and convenient to operation, fast to assemble and dismantle, widely used in scaffolding construction, such as formwork scaffold and fitment construction.

 

It can be widely used for industrial and civil construction and maintenance, such as workshop, large gymnasium, conference& exhibition center conversation, billboard, market, dock, tunnel, subways, etc. used for mobile working platform installation of electrical & mechanical engineering, ship repair and other decoration engineering, for building temporary stand ,with simple roof frame, frame-connected Scaffolding can from temporary dormitory, depot and work shed.

 

2. Main Features of Vertical Support System Ringlock Scaffolding - Q345 & Q235

.Each Ring-lock is welded on post every 0.6m. Choose step pitch based on mechanical requirements

.When installing the scaffolding, insert ledger connector into the pole of the cup-lock, then hammer ledger connector to finish fastening

.The more load, the more reliable fasten

.Ring-lock Scaffolding has no special retaining member and no active parts. It’s easy and convenient to operation with integral low costs

 

3. Vertical Support System Ringlock Scaffolding - Q345 & Q235 Images

 

Vertical Support System Ringlock Scaffolding - Q345 & Q235

 

Vertical Support System Ringlock Scaffolding - Q345 & Q235

 

4. Vertical Support System Ringlock Scaffolding - Q345 & Q235 Specification

Type: 

ringlock scaffolding diagonal Brace 

specification 

Ø48.3×3.20 

material: 

steel Q235 

Finished 

Hot DIP galvanized, painted 

Diagonal length(m) 

Weight(kg) 

0.9m * 1.25m 

6.28

1.25m * 2.7m 

11.45

 

5.   FAQ of Vertical Support System Ringlock Scaffolding - Q345 & Q235

     1) What can we do for you? 

      We can ensure the quality of the Vertical Support System Ringlock Scaffolding - Q345 & Q235 and avoid extra expenses for customers.    

    .We can provide you the professional design team.    

    .We can provide fashionable and newest styles for you.    

    .We can design the artwork for you.    

    . Please feel free to customize.  

 

   2) What promises can be done by us?

   . If interested in Vertical Support System Ringlock Scaffolding - Q345 & Q235, please feel free to write us for any QUOTE.

   . If printing required, please advise asap because the whole set need much more time to complete.

   . Please DO check goods when courier knocks your door and contact us asap if any issue.

 

  3) What about of our after-sale service?

   . Response will be carried out in 24hours  after receiving any complain or request.

   . Frame-Connected Scaffolding cost can be refund after order is confirmed. 

   . If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

  4) What about the package and shipping time?

   .Packing:  As Customer's Requirements

   .Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

  .Shipping time:

    Normally small orders, it just 10-15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

    Other mass qty of Vertical Support System Ringlock Scaffolding - Q345 & Q235 we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Hello, can you send me an electronic version of the current building code? Thank you, email lyslzsuiyandong@163.com
A project floor-style double row scaffolding more than 30 meters, does not meet the specifications,
Q:What kind of scaffolding is the building divided into? Where to use it
Interior decoration high construction area, you can use a fixed scaffolding, outside the rent, you can request to install; high construction period is short or small size, you can use the activities of scaffolding. Activities or fixed can be combined, Can be a few units together, depending on the specific area and requirements of the decoration. Construction of the lower height, but also their own use of bamboo or wood to produce temporary scaffolding or bench. Oh, thank you
Q:Construction of the project more than the number of layers must be used construction elevator
Bulk density of polystyrene foam board should be ≥ 18kg / m; Polyurethane double-sided steel plate metal surface sandwich panel
Q:What kind of jobs are the construction workers in the labor service network of the China Construction Service Network?
Generally small diameter of the socket more, large diameter welding or hot sets But no matter what way to connect, backfill quality is the most critical, especially for this flexible tube, backfill quality is not good, can easily lead to the control of muscle 碃 crown degree of protection Especially for large diameter pipes, backfill quality, in order to ensure the ring stiffness of the pipeline to reduce deformation and damage
Q:Will the door scaffolding norms who knows ah? Can you teach me?
; by erection of the pole row, but also a single row of shelves, double row frame and full house According to the erection of the use, but also can be divided into masonry frame households light Ju Chi angle Gui carrying wool, decoration rack; by erection of the location can be divided into external scaffolding and scaffolding The following small series on a brief introduction to several commonly used steel frame structures and scaffolding structures A scaffolding on the outside of a building or structure is called an outer scaffolding Outside the scaffolding should be put up from the ground, so, also known as floor scaffolding, in general, how high the building, the shelf will take how high Scaffolding can be divided into single row scaffolding and double scaffolding A scaffolding in a building or structure is called a scaffolding The main types of scaffolding are: horse stool-style scaffolding and pillar-style foot scaffolding Tool scaffolding has cantilevered scaffolding, basket scaffolding and hanging lift scaffolding, scaffolding and door steel scaffolding
Q:March 20 Beijing-Zhuhai high-speed explosion, occupying the emergency lane of the car all the firefighters with forklift shovel high-speed, insurance does not lose money.
Want to know the density, we must first know that you want the board of the flame retardant grade is a few levels, or can not tell you how much density, and each company's products do not rush to avoid the rules, but also the density of the same Not the same, very different!
Q:What are the special types of jobs that need to be certified?
1. Civilized construction program 2. Safe construction program 3. Template construction program 4. Scaffolding construction program 5. Sambo four construction program 6. Temporary electricity construction program 7. High operating construction program 8. Tower crane construction plan 9. Multi-tower operation anti-collision construction program 10. Emergency emergency plans 11. Winter rainy season construction program 12. Significant hazard assessment measures 13. Construction organization design 14. Building energy conservation program 15. Basket construction program 16. Tower crane hoisting program
Q:What are the five accidents in the construction industry?
I have seen more with the wooden sandwich panels, more beautiful, feel better
Q:The latest "current building construction specifications Daquan" electronic version can give me a copy of it
(Insulation, thermal insulation effect is better) of the insulation material and the building wall fixed one (the thermal insulation effect is better), and the thermal insulation material is fixed with the building wall (fixed, mechanical anchoring, paste + mechanical anchoring, spraying, casting, etc.) , Increase the average thermal resistance of the wall, so as to achieve the insulation or insulation effect of a engineering practice. Should include roof insulation!
Q:What are the basic processes of civil engineering need to prepare the construction program
The general needs of the minimum . namely: construction crane equipment (tower crane), construction crane machinery (material hoist), construction crane machinery (construction lifts), building shelves (ordinary scaffolding), construction Construction workers, construction electrical welding (cutting) workers, high operating basket installation demolition workers and other special operations personnel with or without provincial management issued by the "construction of special operations personnel operating qualification certificate", " And the card is consistent.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range