Two-component Polyurethane Waterproof Coating

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
50000 kg/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1.Structure of Two-component Polyurethane Waterproof Coating Description:

Two-component polyurethane waterproof coating is a kind of two-component reaction gel-type polymer waterproof coating.A division points is made from polyether and isocyanate by polycondensation reaction of polyamine polymers. B division consists of plasticizer, curing agent, thickening agent, coagulant, such as filling agent of color liquid. When using,after a, b, two kinds of components according to certain proportion are mixed, stirring evenly, besmear in the need of the surface of the base construction, formed by the reaction of curing elastic waterproof coating, tenacity and durability.

2.Main Features of Two-component Polyurethane Waterproof Coating:

Waterproof coating elongation, strength, good elasticity

Coating is close-grained, no bubble, no pinhole

Not contain ingredients like benzene, no pollution to the environment

Cold construction, convenient construction

Strong cohesive force, not strong permeability

3.Two-component Polyurethane Waterproof Coating Specification:

NumberTest  ItemIndex
1Solid content≥80%
2Tensile Strength Mpa 1.9
3Elongation at break≥550%
4impervious 0.3Mpa,30minNo crack

4.Two-component Polyurethane Waterproof Coating Images:

Two-component Polyurethane Waterproof Coating 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:A complete set of basement waterproof construction program
2.2 site preparation 2.2.1 external wall of the pull bolts should be cut off in advance, wooden blocks removed after the use of cement mortar smooth. 2.2.2 grass-roots should be clean, concrete joints processing flat, made at the corner of the yin and yang ...
Q:How does the finished ventilator manufacturer waterproof?
In the latest country set JJCJ33 clearly stipulates that the structure to be waterproof, refers to the internal ventilation of all nodes and ventilators and roof all the nodes,
Q:Slope roof drains do not need to be waterproof
The overall rigid waterproof layer is often due to these small structural nodes handled properly, resulting in the failure of the entire roof waterproof.
Q:What is the price of a waterproof window cover?
3, decorative panels Decorative panels are divided into paint-free panels and paint panels. Currently on the market, there are many window-free products, paint-free board is 5 mm density, the board pressure a layer of thin layer of color paper, due to the type of color paper, so there can be a lot of paint-free Color. Paint decorative panel is the surface of a layer of veneer plywood, there are many types, different wood has different colors. The benefits of window sets
Q:What is the difference between finished mortar and cement mortar?
Finished mortar and cement mortar difference: Cement mortar is the synthesis of three main materials, cement, sand and water, and mixed mortar is the synthesis of four major materials, cement, sand, lime and water.
Q:What should you pay attention to before the construction of the basement waterproofing membrane?
Plastic runway construction should pay attention to: 1, before the construction, must be on the asphalt concrete foundation for quality acceptance, acceptance criteria according to design standards and technical specifications, the plastic runway in the corresponding drainage facilities, can be used around the clock. The ambient temperature should be controlled at 5 ℃ ~ 38 ℃, to avoid below 5 ℃, 38 ℃ above the ambient temperature operation, the relative humidity control below 70%, the foundation requires a clean, according to the temperature and relative humidity to adjust the amount of catalyst The curing speed control appropriate. Color paste and prepolymer storage, the lid to be tightened, before use to detect moisture, qualified after use, the water in the foundation should also be controlled to avoid the bubble after the glue. Plastic pavement materials must be carefully checked when the quality inspection certificate and validity period.
Q:What material waterproofing can be mixed with cement sand
Construction can also be used to produce waterproof pulp, waterproofing agent for the amount of cement 3 ‰ -4 ‰, the use of cement label not less than 32.5MPa.
Q:Cabinet is to buy finished products, or directly to the decoration company to do?
My home decoration cabinets are Haotian decorative package to do, although expensive, but still very worthwhile, all of their wood will be waterproof and moisture, in contact with the wall will do the underground waterproof and moisture, and are on-site cash Now do, timber materials can be seen directly, the amount of glue is not much, less formaldehyde, the latter part of the living is also more comfortable!
Q:How to ensure the waterproof quality of the underground shear wall (retaining wall)?
1, when the basement buried depth is not large, you can use the digging method, once in place, and then press the first on the next, the order of construction.
Q:How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range