Twin Layer Pump Reducing Pipe with High Quality

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10 pc
Supply Capability:
1000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

                                                                         

Product Description:

Product Name: Twin Layer Pump Reducing Pipe 

1.        Specification

 

 

Type

DN

Thickness (mm)

Length (mm)

Weld-on Ends

Weight (kgs)

ST52 Steel Pipe

125

4.0

3000/ 2000/ 1000

148mm

41

4.5

148mm

46

7.0

148mm

72

Hardened Pipe

125

4.5

148mm Chrome Carbide Insert

48

7.0

148mm Chrome Carbide Insert

76

Twin-Wall Pipe

125

2+2

148mm Chrome Carbide Insert

45

2.5+2

148mm Chrome Carbide Insert

48

4.5+3

148mm Chrome Carbide Insert

76

ZX-Pipe(ST52)

125

7.0

ZX-5" F/M flanges

Hardened ZX-Pipe

125

7.0

ZX-5" F/M flanges

Schwing F/M Pipe (ST52 )

125

4.0

Schwing 5" F/M flanges

4.5

Schwing 5" F/M flanges

7.0

Schwing 5" F/M flanges

8.0

Schwing special F/M flanges

Steel Pipe

100

4.5

3000

122mm/127mm/4"HD

4.5

2000

122mm/127mm/4"HD

4.5

1000

122mm/127mm/4"HD

150

8.0

6000

6"HD/ ZX-6" F/M

8.0

3000

6"HD/ ZX-6" F/M

8.0

1500

6"HD/ ZX-6" F/M

8.0

1000

6"HD/ ZX-6" F/M

2.  Application

Concrete delivery.

3.  Package

Put into containers.

FAQ:

Q1: Why buy Materials & Equipment from OKorder.com?

A1: All products have its ISO certifications, adheres to the highest standards and a commitment to supply chain safety and customer satisfaction.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will begin production. The specific shipping date is dependent upon international and government factors, but is typically 10 to 30 workdays.

Q4: If we can produce Twin Layer Pump Reducing Pipe according to customers request?

A4: Yes, we can produce Twin Layer Pump Reducing Pipe according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: We have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities &skilled personnel at site for training.

 

Images: 

 

  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the skills of concrete pump?
The floor of the concrete pump should be flat and solid; the whole machine should be placed horizontally and should not be tilted during the work
Q:How much is the pump for a month?
Remove the pump car monthly fuel maintenance consumption (about 10 thousand to 5000), calculate the monthly one of the clay, probably earn about 14 to 150 thousand net!
Q:What is the farthest pumping distance of concrete pump truck?
Now the domestic pump to achieve the highest pump height, the largest is ZOOMLION made 80 m carbon fiber boom pump, but also to achieve the pump Guinness world record
Q:How can the concrete pump be installed and used?
Operation should be carried out before the examination, to confirm the normal electrical equipment and instrumentation, each part of the switch button, the handle in the correct position, the mechanical part of the fastening point is firm and reliable, and the chain belt tightness to meet the requirements, the normal operation of the transmission parts
Q:How to calculate the power of concrete pump motor
The amount of concrete pump used in the construction business can be calculated according to the concrete pouring amount, the actual transport capacity of the single machine and the construction operation time. For those concrete pumping projects with a large amount of disposable concrete, besides the calculation and determination, there should be a certain reserve. In addition, an annual output of 10~15 million M3 concrete mixing plant, 2~3 equipment needs to be equipped with concrete pump vehicles
Q:What is the name of the pump for concrete transportation?
The concrete name of concrete pump is concrete pump truck. Concrete pump truck is a kind of machine which can transport concrete along pipeline continuously by pressure. It is composed of pump body and conveying pipe.
Q:How to deal with the blockage in the outlet of the distributing valve of the concrete pump?
If this method does not dare, it can only be manually removed, remove the connecting pipe, remove the debris in the valve.
Q:How to judge the concrete pipeline blockage?
Listen to the ear, there is rustling sound as normal, there is a piercing sound for the blockage
Q:What are the types of concrete pumps?
According to the power type is divided into electric concrete pump and diesel power concrete pump
Q:Why would the plugging concrete pump pipe
Pump operator in pumping construction should concentrate, always pay attention to pumping pressure meter readings, once found that the pressure gauge reading suddenly increased, should immediately anti pump 2-3 stroke, and then pump, pipe can be excluded

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range