Tower Crane TC6024 Construction Equipment Building Machinery

Ref Price:
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
5 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Tower Crane TC6024 Details:

Minimum Order Quantity:     1unit                                            Unit:     unit                            Loading Port:     China main Port

Supply  Capability:         5unit/month                                                                Payment    Terms:      T/T   or  L/C


Tower Crane TC6024 Description:

1.CMAX Tower Crane TC6024  is one of the main product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2. Tower Crane TC6024  can adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected.

3. Tower Crane TC6024has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

4.Tower Crane TC6024  has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter,weightlimiter,circumgyrating limiter,and so on. 

5.Tower Crane TC6024  has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operato.


Tower Crane TC6024  Parameter:

 Max. working range 60m, tip lifting weight 2.4T and Max. lifting weight 10T.

Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.

Trolleying mechanism can provide two operation speeds.

Free standing height (m) 50.5

Max height with attachment (m) 200

Working range can be adjusted (m) 48、54、60

Min working range (m) 2.5

Max lifting capacity (t) 10

Tip load @ 50m (t) 2.4


Tower Crane TC6024  Packaging & Delivery:

40HQ container

20~25days after deposit


Tower Crane TC024 Diagram:

Tower Crane TC6024 Construction Equipment Building Machinery


\Tower Crane TC6024 Construction Equipment Building Machinery\

Tower Crane TC6024 Technical Sheet:

Tower Crane TC6024 Construction Equipment Building Machinery

Tower Crane TC6024 FAQ:

1.What is tower crane?

Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

2. What is the meaning of the tower crane’s code?

Take Tower Crane TC6024 for example, the first two letters “TC” means Tower Crane, “60”means jib length is 60 meter, and the last two letter “24” means the tip load is :2.4 ton.

3. What is the principal to quote the right tower crane to the client?

First, we need to know clients’ requirements,for example, max lifting capacity, height, tip load and jib length.. Second, we need to know what the foundation requirement from the client is and Third if there are special needs. CNBM could suggest proposal according to clear data provided by the clients.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Operation points of tower crane (tower crane)?
Slewing bearing: tower crane is one of the most critical components, mainly to bear overturning moment and vertical load. After the failure, the demolition and replacement is extremely difficult, loss of large, so you have to check carefully to do maintenance, each 200H must be a senior grease lubrication from the rotary bearing surface, until now exudation. Slewing bearing adopts high strength bolt connection, if the pretension is not enough, or long-term operation, do not check, not fastening, will cause loose. If the individual bolts loose, will cause the remaining bolts overload, the consequences will be disastrous. The luffing mechanism only moves horizontally, the load is light and the line speed is not high, so it should be easy to master and operate. However, the amplitude involves the change of the lifting torque, and if there is no stopping in time, there will be the possibility of over torque. Therefore, the main requirement of variable amplitude operation is stationary parking and accurate positioning. The tower crane is of great height and the hanger is hung longer, so it is easy to swing the hanger when it is running. This is an objective phenomenon. What is called stabilization hook operation is how to make the swinging hook stop quickly, or how to make the hook move with the movement of the crane as soon as possible, and minimize the operation of the swing. The operation of stabilization hook is the skill that the driver should master.
Q:How did they get that crane on the top of the Deutsche Bank bldg here by the WTC in NY?
First opf all structure engineer design the crane(wind Load+load carrying capacity+self weight+torsion+moment...etc) then designed in parts then fabricated with iron pipe, angles, girdrers. then transported to site on trucks then assembled in small pieces on ground then step by step joined with the help of crane, or even helicpoter(it was even used in CN tower)
Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
...keep it to the dinosour
Q:How long did it take Stephen Crane to write his book A Red Badge of Courage?
The okorder.com/
Q:What is a better name than Frank Crane for a story hero?
I agree with the first poster that you are doing something very wrong. Rather than worrying about the name you may want to reconsider the gender.
Q:Which war is Stephen Crane referring to in his poem War is Kind?
Sounds like War to me According to the black and bare lands, with women and babies weeping , etc. A person in the midst of this upheaval..the only one it seems Evidentely was ask milions of questions of why Because he was the only one who asked Why? He did not know the answer but he was the only one who cared..to me this is the meaning of the poem Stephen Crane wrote some brain teasing material..Read In the Desert
Q:how do you say paper crane in japanese?
This Site Might Help You. RE: how do you say paper crane in japanese?
Q:how does a skyscraper crane use moments ?
OK... So what has your homework actually asked you to explain? Can you post the question...? There are moment forces going through a crane, is the aim of the homework simply for you to explain what a moment force is using a specific example ? A crane can be thought of in simple terms as a cantilever, ie one supported end and one free end, the lever arm force as it is sometimes referred to in schools is actually the moment force i.e. the moment for a crane with a boom L=40m long lifting a load of P=10kN would beP*L = 10*40 = 400 kNm, this is ignoring the self weight of the boom, if the boom weighed W=1.5kN/m (thats per meter, not to be confused with kNm which is kilo newton meters) then the moment generated by the self weight would be (WL^2)/2 = (1.5*40^2)/2 = 1200kNm so the total moment would be 1600kNm, so just remember for a point load the moment is force * distance from support ( in cantilevers) hope this helps... :)
Q:Is a mobile crane allowed to operate in an inclined plane?
NO, absolutely not. If the machine is not level, it could fall over. The only way, if it has to be operated on an incline, is if the machine has leveling jacks such as many modern, mobile cranes have.
Q:How do you jump a crane? I know you jack it up but how is that done?
I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range