Tower Crane TC5613 new sole dealer find
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Quick Details of TC5613 Tower Crane
Feature: Tower Crane
Condition: New
Max.Lifting Load: 8T
Span: 56m
Place of Origin: China(Mainland)
Model Number: TC5613
Packaging & Delivery of TC5613 Tower Crane
Packaging Detail: Nude package
Delivery Detail: 25-30days
Specifications of TC5613 Tower Crane
● Max. working range 56m, tip lifting weight 1.3T and Max. lifting weight 8T.
● Provide stepless speed regulation. Outstanding in working efficiency, operating stability and reliability.
● Reduce future maintenance cost.
Free standing height (m) | 46 | ||||
Max height with attachment (m) | 150(200) | ||||
Working range can be adjusted(m) | 44、50、56 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 8 | ||||
Tip load @ 56m(t) | 1.3 | ||||
Hoist mechanism | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-2 | 0-4 | 0-4 | 0-8 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZRWFc250M-4/8 30/30KW | ||||
Trolleying mechanism | Speed(m/min) | 12/27/53 | |||
Motor | |||||
Slewing mechanism | Speed(r/min) | 0~0.6 | |||
Motor | YZR132M2-6-3.7KW×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 14.1 | ||||
Mast section size(L×W×H)m | 1.8×1.8×2.5 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 42 | ||||
Power supply requirement (KVA) | 190KVA for generator | ||||
Cable type ( within 40 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 179A | ||||
Rated working voltage & current | 380V 128A |
Images of TC5613 Tower Crane
FAQ of TC5613 Tower Crane
Q: What is the principal to quote the right tower crane to the client?
A: First, we need to know clients’ requirements. Normally the following information should be clarified by the client: max lifting capacity, height (height under hook), tip load and jib length.
Second, we need to know what the foundation requirement from the client is. (Fixed/undercarriage/ undercarriage with traveling system), mast section type (panel/integrated), power supply source (voltage, ampere and frequency), the distance between the machine and power supply……
Third if there are special needs, we could suggest proposal according to clear data provided by the clients. End-user, as construction machinery buyer, knows the site situation well and should make decision, such as the machinery specification, type…….
Q: What about our tower crane's warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients’ requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
To Lead The Revoluation of International Trade
- Q:what type of hydraulic oil does a 2007 liebherr LTM 1160 5.1 crane take?
- You're telling me you've been entrusted the control of a crane capable of reaching 565 feet up an you don't know what hydraulic oil it takes?? Jesus Christ mighty... First off, it's in the owners manual, second off it's probably on the resivoir cap.... If you couldn't figure that out you shouldn't be allowed near the damn thing...
- Q:any one can give me address for forged hook for crane?
- here okorder /
- Q:can anyone tell me the principle under which a GANTRY CRANE works..........Suggest me some websites which gives details about the working of gantry crane ....please help me......
- This okorder /
- Q:What is a typical hourly wage, and what kind/how much training is required? Is there a special certificate that you have to get, sort of like a driver's or pilot's license? Does it vary much depending on what type of crane (track crane vs. tower crane)?
- In Sydney Australia a tower crane operator makes a little over $2000 a week after tax on average. Pay is about $40 to $50ph, alot of allowances + penalty rates. Expect to work big hours for the money though. To become an operator go to your local union office, they might point you in the right direction for your region.
- Q:Is there a certain direction and reason a construction worker will leave a crane facing a certain direction.
- not really they pretty much wanna just get home 2 their families
- Q:its dead im so scared if thes so called flys i tired to kill it but wen ever i get some thing to kill it its hideing
- this could be a delusion. there's certainly 0 information to help the thought a daddy long legs has the maximum advantageous poison commonly used to guy. yet for some reason the myth started floating around years in the past, and nevertheless hasn't died. Technically, there has been no analyze accomplished on skill venom held by skill of a daddy long legs. provided that they could't bite you, the only thank you to do this thought may well be to empty the poison from a spider and inject it right into a human, this is against ethical technology. And there are no analyze of their poison on mice. So actually, guy would not additionally recognize in the event that they have poison, much less how risky it is to human beings. and there is not any reason to assume they are risky with out any information of it. there is an get entry to at Snopes, the final city legend and delusion fact-checking internet site on the internet, which confirms this. next time you hear something which you're uncertain you think, examine it out on Snopes... they probable have a internet site devoted to it.
- Q:how can we minimize energy losses of a crane to reduce the impact on the environment?
- No hint as to what type or size of crane, so I assume it is a large overhead traveling bridge crane inside an industrial building: Consult the manufacturer for recommendations. Change its power source to something cleaner (from diesel to propane or electric). Properly lubricate and adjust all moving parts. Turn power off when idle. Schedule heavy usage during hours of low demand of electric utility power. Replace motor with a more efficient new one. Replace entire crane with a new efficient one. Replace the large capacity one with one or more smaller units.
- Q:is this a grey crowned crane?
- yes it has to be
- Q:This has nothing to do with travel, I'm just curious. I hate it when the news doesn't follow up on stories they focused on earlier. Does anyone have a status update on that crane that was swaying in the wind during Sandy?
- My friend, that is a good question. According to the latest news conference from the Mayor, the crane's boom arm is secured to the structure. However, West 57th Street between Broadway and 7th Avenue is closed until farther noticed. In addition, the 57th Street-7th Avenue subway station on the N, R and Q Line is closed and trains are bypassing the station in both directions, according to the MTA. Good luck Native New Yorker
- Q:How are those really tall construction cranes assembled ???
- I assume you are talking about a tower crane. From a distance, it looks like a T with one side shorter than the other. First, you need a good foundation for the crane to sit on. Next, you have a large mobile crane. With the mobile crane, you construct the tower (metal framing going up), the cab (where the operator sits and the motors), the boom (the mast out front) and the counter-weights (on the side opposite the boom). For the most part, this will get you a tower crane that will be about 200 feet above the ground. Most tower cranes today are self-jumping. Once you are ready to jump the tower crame (i.e. insert another section of the metal frame) there are hyraulics that lift the boom, cap and counterwieghts. This will create a gap in the metal frame. The tower crane will then pick up a section of frame and hoist it up and the ironworkers will slide it into place. The top section will be lowered down onto the new frame piece. The hydraulic jacks then get re-attached higher up to continue the jumping process. That is how you get a crane to build a 50+ soty building. By the way, once the crane is about 700 feet in the air, (if you have the stomach for it), it is a blast to ride out to the end of the boom.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5613 new sole dealer find
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Hot Searches
Related keywords