Tower Crane TC5013A(QTZ63) Qualified Supplier
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Detail of Tower Crane
Feature: Tower Crane Condition: New Application:Building,Construction,Industrial
Rated Loading Capacity: 1.3-6T Rated Lifting Moment:63KN.M Max. Lifting Load: 6T
Max. Lifting Height: 121M Span: 2.5-50M Place of Origin: China (Mainland)
Brand Name: CMAX Model Number: TC5013A(QTZ63) Certification: ISO,CE
Warranty: 1 Year Free standing height (M):4O Max. Working Range(M): 50
Tip Lifting Weight(T): 1.3 Working Range(M): 44,50 Climbing speed(M/MIN): 0.5
Counterweight(T): 11 Working Temperature(°C): -40-+60 Type: Topkit Tower Crane
Delivery Date:25-30 days Mast Section Size(L*W*H)MM:1600*1600*2500(Panel type)
Main Features of Tower Crane
1. TC5013A(QTZ63) have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 50m, TC5013A(QTZ63) tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2. This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3. It is original in design, reliable in operation and satisfactory in shape.
4. Equipped with all necessary safety devices, these cranes show a good speed-control capacity, satisfactory operating stability and high work efficiency.
6. Hoisting mechanism fitted with three speed motor, stable braking and less shock when shifting.
7. Trolleying mechanism can provide two operation speeds.
8. With scientific layout and beautiful appearance.
9.They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys.
10.After sales service will be offered which will get rid of all your worries in the purchase of our products
Specification of Tower Crane
Images of Tower Crane
FAQ about Tower Crane
Q: What kinds of tower crane are available now?
A: Four main categories: normal tower crane with cat head, internal climbing tower crane , top less tower crane and luffing tower crane.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:my HSAP prep teacher wants us to find instructions on how to make an oragami crane.She said that it has to be less than 24 steps.I have looked on the internet and I cannot find anything.I need this by tomorrow.Please help!
- Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
- Q:The really really tall ones you see next to skyscrapers. How do they assemble them? I thought that maybe they use another crane, but then how did they assemble that crane? Some of them are really, really tall. Try to remember what one looks like. They have long hollow necks with a top section where the driver sits that stretches long horizontally.
- You okorder /
- Q:What are the safety devices for the horizontal arm self lifting tower cranes?
- (6) the crane of lightning protection and anti electromagnetic wave sensing device shall be equipped with lightning protection device and anti electromagnetic drape induction measures according to the actual situation and shall be equipped with crane with a hinge height of more than 50m at the root of the boom. (7) the tower crane should be installed to prevent the rotary overload limit torque coupling (8) anti off rope device to prevent the wire rope from the working position (9) rope breaking resistant device to prevent car luffing rope break free sliding trolley (10) anti broken shaft device to prevent car car wheel shaft broken after the fall (11) brake parts that is the work device is a safety device
- Q:I would like to get some advice from Martial artists of the training that Crane style Kung Fu go trough especially the balance. I would like to learn how they learn to balance without difficulty and the training they go trough.
- I don't train in Crane style Kung Fu but I can give you some balance training tips. 1. Stand on one leg whenever possible (doing the dishes, waiting in line, etc.) 2. Walk on a Balance Beam (a wall, a line on the floor, a large long block, etc. can all be used as a balance beam), just walk heel to toe and work on staying balanced. When walking becomes too easy try practicing kicks on the beam, then spinning kicks, then jumping kicks (NOTE: if your balance beam is off the floor make sure you have a spotter when you do any jumping or spinning) 3. Practice, practice, practice Ask your instructor for more exersizes internet videos can be good but are unreliable and dangerous in the hands of people who don't know what they are doing.
- Q:We see lots of cranes doing some heavy lifting during construction. But how do they get so high up these buildings? And when construction is nearly done, how do they go back down?
- Those type of cranes have a support system that is continuously built as the building gets taller. The crane climbs up on the support system to reach the next level and climbs down to get down
- Q:What qualifications do you need to be a Crane Operator in QLD, Australia?
- You need to do a specific amount of hours in training to be a crane operator in Australia, I know that in Sydney, you are certified by the WorkCover Authority, or that's how it was many yeas back. Special emphasis is on loads, and point of load. We do not need a mobile crane tipping over do we. Safety, working near electrical, and on soft ground. Weight you can extend to on a jib. etc.
- Q:ok I found an injured crane what do I feed it?
- Cranes are omnivores. But I would feed crane with vegetarian stuff like grain, berries, plants, roots, seeds, stems, bulbs, fruits, nuts. But if you want make it non vegetarian then rodents, fish, amphibians, snakes, rodents, lizards, small fish, frogs, shellfish, mollusks and crustaceans.
- Q:I need to know exactly how much weight they can lift also how much do they weight?how long is thier life-time?in what temprature they can work?does mosture do any harm to them?for installation , do they need foundation?the exact height and width?
- You need to be more specific. The lifting capacities for container cranes varies significantly, as does any other crane. Some of the variation is based purely on load (horsepower) availability; some is based on speed (rpm) for lift/drop portions of the cycle. Cranes like these operate year-round, at ports all over the world. Some ports have average ambient temperatures in the range of 45 C, with highs up to 60 C. Others can be as low an average as 10 C, with a low peak as much as -50 C. Moisture will, over the long haul, harm them - they're metal constructs, and thus are prone to oxidation. Using corrosion-resistant materials and/or coatings will certainly prolong their usable lifespan. The crane drives (electric motors and power electronics) are also susceptible to moisture and other contaminants. All true dockside cranes require some sort of permanent foundation; it's usually part of the pier construction itself. However, there are portable cranes that operate without one. There is also more than one crane manufacturer out there - all will have their trade secrets that will make each look a little different than the rest. It will generally also reflect in their operation parameters, and in their expected life cycle.
- Q:im doing a project and i need to know what eats sandhill cranes asap.
- Bald Eagles. They will eat anything
- Q:Probably my favorite of the jumping kicks I practice, and I'm curious what experiences you guys have had with it. I've caught people of guard with it after using a crescent or roundhouse kick in kickboxing, and I've done it with a knee to the chest then the kick to the head in Muay Thai. I've also practiced the ten foot kick (using the initial foot up to propel yourself forward instead of up) and crossed the ring to the opponent before they could move. What are your thoughts? What kind of variations do you practice? Ever had any good/bad results from it?
- The bicycle/crane is my favorite I've winded people very easily with a quick one to the chest
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane TC5013A(QTZ63) Qualified Supplier
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords