Detail of Tower Crane
Feature:Tower Crane
Condition:New
Model Number:TC7021(QTZ250)
Place of Origin: China (Mainland)
Brand Name: CMAX
Certification: ISO,CE
Warranty: 1 Year
Application:Building,Construction,Industrial
Main Features of Tower Crane
1) This kind of crane adopts standard section hydraulic lifting and connecting.The max. height can reach 180m with wall tie ins.
2) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.
3)The range-change structure drives the trolley moving on the horizontal crang jib, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.
4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc..
5)The cranehas scientific layout and handsome appearance. The drivers cab is set independently on one side, with good vision field. It creates a good working environment for the operator.
Specification of Tower Crane
Technical Sheet for TC7021
Free standing height (m) | 50 | ||||
Max height with attachment (m) | 200 | ||||
Working range can be adjusted(m) | 40、45、50、55、60、65、70 | ||||
Min working range(m) | 2.5 | ||||
Max lifting capacity(t) | 12 | ||||
Tip load @ 70m(t) | 2.1 | ||||
Hoist mechanism (VFD+PLC) | Falls | 2 | 4 | ||
Lifting capacity(t) | 0-3 | 0-6 | 0-6 | 0-12 | |
Speed(m/min) | 0-80 | 0-40 | 0-40 | 0-20 | |
Motor | YZPBF250-4-55KW | ||||
Trolleying mechanism (VFD+PLC) | Speed(m/min) | 0-56 | |||
Motor | YPBE132M-4-7.5KW | ||||
Slewing mechanism (VFD+PLC) | Speed(r/min) | 0-0.6 | |||
Motor | YLEW112M-6-120N.M×2 | ||||
Climbing speed(m/min) | 0.5 | ||||
Counterweight(t) | 23.6 | ||||
Mast section size(L×W×H)m | 2×2×3 | ||||
Working temperature | -40-+60℃ | ||||
Total power (KW) | 95 | ||||
Power supply requirement (KVA) | 255KVA for generator | ||||
Cable type ( within 30 meters from site power source to lower electric box of tower crane ) | |||||
Startup voltage & current | 380V×95%=361V 260A | ||||
Rated working voltage & current | 380V 146A |
Loading diagram:
70m jib length:
R | 18 | 22 | 24.5 | 27.7 | 28.3 | 30 | 32 | 35 | 37 | 40 | ||
a=2 (t) | 6t—31.8m | 5.96 | 5.35 | 5.00 | 4.54 | |||||||
a=4 (t) | 12t—17.8m | 11.29 | 8.99 | 7.94 | 6.86 | 6.69 | 6.23 | 5.76 | 5.15 | 4.80 | 4.34 | |
R | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | 62 | 65 | 67 | 70 |
a=2 (t) | 4.27 | 3.91 | 3.69 | 3.40 | 3.23 | 2.99 | 2.84 | 2.64 | 2.52 | 2.35 | 2.25 | 2.10 |
a=4 (t) | 4.07 | 3.71 | 3.49 | 3.20 | 3.03 | 2.79 | 2.64 | 2.44 | 2.32 | 2.15 | 2.05 | 1.90 |
65m jib length:
R | 20 | 22 | 25 | 27.7 | 30 | 31.8 | 32.4 | 35 | 35.9 | 37 | ||
a=2 (t) | 6t—35.9m | 5.79 | ||||||||||
a=4 (t) | 12t—19.23m | 11.49 | 10.32 | 8.92 | 7.92 | 7.21 | 6.72 | 6.57 | 5.99 | 5.80 | 5.59 | |
R | 40 | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | 62 | 65 | |
a=2 (t) | 5.27 | 4.96 | 4.56 | 4.31 | 3.99 | 3.79 | 3.52 | 3.35 | 3.13 | 2.99 | 2.80 | |
a=4 (t) | 5.07 | 4.76 | 4.36 | 4.11 | 3.79 | 3.59 | 3.32 | 3.15 | 2.93 | 2.79 | 2.60 |
60m jib length:
R | 22 | 25 | 27 | 30.6 | 31.8 | 32.4 | 35 | 37 | 40 | |||
a=2 (t) | 6t—39.85m | 5.98 | ||||||||||
a=4 (t) | 12t—21.35m | 11.60 | 10.05 | 9.21 | 7.96 | 7.61 | 7.45 | 6.79 | 6.35 | 5.78 | ||
R | 42 | 45 | 47 | 50 | 52 | 55 | 57 | 60 | ||||
a=2 (t) | 5.64 | 5.18 | 4.91 | 4.55 | 4.33 | 4.03 | 3.85 | 3.60 | ||||
a=4 (t) | 5.44 | 4.98 | 4.71 | 4.35 | 4.13 | 3.83 | 3.65 | 3.40 | ||||
55m jib length:
R | 23 | 25 | 27 | 29 | 32.8 | 33.7 | 34.3 | 35 | 37 | 39 | |
a=2 (t) | 6t—42.70m | ||||||||||
a=4 (t) | 12t—22.87m | 11.92 | 10.86 | 9.96 | 9.18 | 7.96 | 7.71 | 7.55 | 7.37 | 6.90 | 6.48 |
R | 41 | 43 | 45 | 47 | 49 | 51 | 53 | 55 | |||
a=2 (t) | 6t—42.70m | 5.95 | 5.63 | 5.34 | 5.08 | 4.84 | 4.61 | 4.40 | |||
a=4 (t) | 6.10 | 5.75 | 5.43 | 5.14 | 4.88 | 4.64 | 4.41 | 4.20 |
50m jib length:
R | 24 | 26 | 28 | 30 | 33.1 | 34.7 | 35.4 | 38 | ||||
a=2 (t) | 6t—43m | |||||||||||
a=4 (t) | 12t—23.04m | 11.46 | 10.48 | 9.63 | 8.90 | 7.94 | 7.51 | 7.34 | 6.74 | |||
R | 40 | 42 | 44 | 46 | 48 | 50 | ||||||
a=2 (t) | 6t—43m | 5.84 | 5.53 | 5.26 | 5.00 | |||||||
a=4 (t) | 6.34 | 5.97 | 5.64 | 5.33 | 5.06 | 4.80 | ||||||
45m jib length:
R | 25 | 27 | 29 | 31 | 33.6 | 34.9 | 35.6 | 37 | |||
a=2 (t) | 6t—43.75m | ||||||||||
a=4 (t) | 12t—23.42m | 11.16 | 10.23 | 9.43 | 8.74 | 7.96 | 7.61 | 7.44 | 7.10 | ||
R | 39 | 41 | 43 | 45 | |||||||
a=2 (t) | 6t—43.75m | 5.80 | |||||||||
a=4 (t) | 6.67 | 6.28 | 5.92 | 5.60 |
40m jib length:
R | 24 | 26 | 28 | 30 | 32 | 34.1 | 35.1 | 35.8 | 38 | 40 | |
a=2 (t) | 6t—40m | ||||||||||
a=4 (t) | 12t—23.8m | 11.90 | 10.88 | 10.01 | 9.25 | 8.59 | 7.98 | 7.71 | 7.53 | 7.02 | 6.60 |
Images of Tower Crane
FAQ about Tower Crane
Q: What serice you could provide?
A: Providing timely delivery, standby engineers are ready to slove any of your problem
Providing all-embraced warranty of products quality, worksite installation guidance
Providing ample spare parts and training of operation and maintenance
Engineers have more than 20 years' experience in tower crane, ready to solve any of your problems.
Q: What kind of steel used for tower crane ?
A: Normally, as for the main force bearing steel structure, Q345B is adopted; as for the assistance force bearing steel structure Q235B is adopted. All of the raw material is outsourced from qualified steel factory in China.
Q: What about our tower crane warranty?
A: Usually there is one-year quality warranty including main electronic parts (not including consumable parts). There are consumable spare parts together with whole machine and normally they are enough for one year.
Q: What is 3 main mechanism of the tower crane ?
A: there are trolleying mechanism/ slewing mechanism/ hoisting mechanism.
Q: Can you equip with light on tower crane jib, monitor, remote control and anemometer?
A: Sure. All of these could be provided with extra cost upon the clients' requirements. But according to general practice, remote control is not suggested because most of the operator feedback operation in the cabin will provide a wide working view.
- Q:A site would be nice...
- I just used that poem for a project!
- Q:What does "automatic tower crane" mean less than 100 tons per metre?
- The crane must not exceed the maximum lifting capacity when working! Otherwise, there will be danger.
- Q:How often should the crane be inspected regularly?
- Lifting machines are inspected regularly every two years, and explosion-proof lifting machines shall be inspected regularly every year. Must have the corresponding inspection qualification inspection.
- Q:ok, so if chad is a crane then why doesnt he stay in the mansion? he is a crane right?
- Chad is a Crane, for those who are saying that he isn't. He is Alister's son with Eve's adopted sister Liz (Eve and Liz aren't blood related). He was living at the studio for the longest and I guess he got adjusted to it. I would think Chad doesn't want to be involved in what goes on in the mansion. Fox is a Crane too, and he doesn't live in the mansion. He lives with Kay at Tabitha's house. Sheridan doesn't live in the mansion, but yes, she lives on the premises in the cottage.
- Q:Ok I got these huge mosquito things in my house and found out they are crane flies. I got up this morning and there are several hanging from my ceiling on a long single strand of silk or web. Is this unusual? Its really weird.
- Probably just harvest man or a cellar spider making a web. You might have just mistaken them.
- Q:Formulas for calculating outrigger pad sizes, centre of gravity of loads, outrigger loadings
- If you are going to be operating a crane, you need to do this on your own. People's lives will depend on you having a good knowledge in this area. .
- Q:Would you say that Ichabod Crane is socially awkward??
- absolutely.
- Q:I think I'm going to try white crane kung fu. This is the club I'm going to which does three lessons in kung fu per week and 2 in sparring.The annual cost is ?40. It says it will take a minimum of 10 years to get a black sash.What are your views on this style? Is it effective and worth my time and does this club look good? Thanks
- White Crane Kung Fu combines protection and assault and makes use of the two gentle and not basic power. It additionally emphasizes organization yet evasive footwork. that's an on the spot, linear and deceptive martial paintings. this actual device is named Fei He or Flying Crane. Flying Crane makes use of the two extreme and occasional kicks yet has a marked decision for speedy hand innovations. It stresses empty-hand as properly as weapons preparation, 2-person instruments, self-protection drills and loose-sparring.
- Q:Hey i need to know what icabod crane did in sleepy hollow the tim burton version with johnny depp.. so far all i have is In the movie he is a detective or a constable, someone who tries to solve crimes. He stands up for what he believes in even though no one might stand up with him. He used instruments of his own kind. Any information will help..Thank you very much Thx again
- He fell in love while there. There were many murders while he was there. He used scientific instruments in a day and age when nobody else did. The town didn't like that about him; they blamed spells and curses. He looked into the crimes when nobody else would. They were too scared. It turns out that it was a headless horseman responsible for the crimes. There were a few witches in the movie.
- Q:i will like to crane operator?
- You made a statement, you will like to crane (an) operator. Which operator is it you are going to like to crane? If you mean would you like to operate a crane, that is up to you. If you mean can you be a crane operator, that is up to an employer. You need to be employed as one, and that probably means training and experience before being allowed to operate cranes for him/ her.
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
Tower Crane 12 Ton Mechanism Vertical Frenqucy
- Loading Port:
- China main port
- Payment Terms:
- TT OR LC
- Min Order Qty:
- 1 unit
- Supply Capability:
- 30 unit/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords