Topkit Tower Crane TC6018 with Jib legth of 60M

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
30 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

TC6018  Description

Condition: New

Rated Loading Capacity: 10t

Rated Lifting Moment: 1250KN.m

Max. Lifting Load: 10t

Max. Lifting Height: 163m

Span: 60m

Place of Origin: Shandong, China (Mainland)

Model Number: QTZ125 tower crane for sale

Certification: CE,ISO and GOST

Warranty: One year

After-sales Service Provided: Engineers available to service machinery overseas

Color: Yellow or optional

Electric components: Schneider

Tower section: Sheet-mounted type for tower crane for sale

Section dimension: 2*2*3m

Working environment temperature: -20℃~40℃

Raw materials: high quality manganese steel for 10t tower crane

Configurations: air conditioner, black box and remote control

Company type: factory for construction tower crane

 

TC6018 Features

1) Lifting multiplying factor switchover automatically, without operator's intervention.

2) Our tower sections are exchangeable, which provide our customers more conveniences.

3) Adopts VVVF stepless speed variation device for lifting, radius changing and slewing mechanisms, to make sure it works steadily and effectively, it also lowers the maintenance cost.

4) The equipment adopts to use non-contact computer control system, which provides the high reliability and full functions to avoid drivers' miss-operation.

 

TC6018  Specifications

 Topkit Tower Crane TC6018  with Jib legth of 60M

 

TC6018   Pictures

 

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

Topkit Tower Crane TC6018  with Jib legth of 60M

 

TC6018 FAQ

Q: What certificate the tower crane get?

A: CNBM certificate for lifting machinery mainly includes:  ISO9001 Certification, / Manufacture License of special equipment by AQSIQ, / The Installation, Alteration, and Repair & Maintenance License of special equipment from AQSIQ, UAE certificate issued by UAE Authority, / CE certificate for the motors adopted on our construction equipments, and so on.

 

Q: What is tower crane?

A: Tower crane is a modern form of balance crane that consist of the same basic parts. Fixed to the ground on a concrete foundation (and sometimes attached to the sides of structures as well), tower cranes often give the best combination of height and lifting capacity and are used in the construction site.

 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:HELP me CRANE FLYS ARE IN MY HOUSE 5 AT LEAST!?
Yuk! I feel your pain - I hate crane flies, too. They are the only animals I don't like. I know they are harmless but they're just so damn creepy, with all those horrible long legs just waiting to dangle on your face! *shudder* My normal way of dealing with them is to smack them with a magazine or newspaper, but if they're on the ceiling I'd go with the person who said suck them up with the Hoover. If you can stand to have them in the house much longer, you could just wait for them to die - they only live 24 hours (in their adult form, that is - they will already have spent some time as larvae). In response to mj1112's answer, crane flies do not eat mosquitoes! As adults they usually do not feed at all, since they live only 24 hours - if they do, it will just be a sip of nectar.
Q:How to win the skill crane?
Be the crane, be the crane. Seriously, just aim at the biggest item with three openings and try to move the crane to get it. They should let people rotate the crane, but then it would be easy for them to lose money.
Q:is the crane style of kung-fu acrobatic?
There okorder.com/
Q:Burj Khalifa: How was the Crane Removed?
They used a climbing crane , and who said that the building has no roof? the crane parts can be dismantled on site and removed either by helicopters or using the construction lifts
Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:why the new york cranes collapsed?
supply them time Dizz, ultimately some Lib will say that is Bush's fault because...he enable the metal marketplace crumple so the crane became created from chinese language iron...or he did not signal the bill to provide the city of lengthy island adequate money for inspectors...or he ordered it to make Bloomberg seem undesirable because Obama became thinking Bloomberg as vice president.
Q:What does a track type tower crane look like? In that case, use?
The rail type multi characteristic tower crane consists of track, door frame, main arm, auxiliary arm, hook and so on. Its features are: A, crane through the door frame (2), supported on a track (1); B, the door frame (2) is provided with a rotary bearing (3); C (3) is arranged on the rotary supporting all kinds of machinery and equipment (4), and balance weight (8); D, the main arm (5) the jib (6) through the bearing cable (7) is installed on the rotary support (3); E, the main arm (5) side arm (6) and Russo (7) can have a variety of length combination; F, a main arm, jib all tube truss structure; G, hook pulley h, equipped with a variety of rate; the torque limiter (10) and amplitude detection device (11); I, operating room in slewing bearing (3); J, self moving use winch is luffing winch main arm, mounted on a rotary support (3).Track type multi characteristic tower crane. The utility model is especially suitable for power construction and hoisting operation. The slewing support on the track type door frame is provided with a main and an auxiliary arm frame, and various variants can be formed through different combinations. Its maximum torque of 3360 tons meters, the maximum lifting capacity of 140 tons, the maximum working range of 60 meters, the maximum rise of 120 meters. The utility model can be carried in the lifting, and the work is smooth and safe. The main and auxiliary arms are all truss structures, light in weight. The electronic torque limiter and other safety devices are adopted, and the 130 meter high machine can be installed by itself. This machine can also be used in petroleum, chemical, metallurgical and other large projects.
Q:Lifting mechanism in tower crane: M5. Luffing mechanism: what does "M4" mean? Seek expert answers
It is the work level of the organization, representing the working hours and load sizes of the institution. See GBT/13752 or GBT/3811 for specific explanations.
Q:how do construction crews put up a crane?
They assemble it on a concrete foundation using a mobile crane. To grow taller, the top unit of the tower crane has a jacking mechanism that lets it raise itself up and insert another tower section.
Q:I looking for information on the surname Crane.?
According okorder.com/

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range