The most favorable alien template apply for construction project

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
5000 watt/month
Inquire Now Customer Service

Contact us by

(1) WeChat
(2) Whatsapp: +8617190086776

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CNBM alien template

Product Introduction:

With the rapid development of urban rail transit project, the formwork mold is widely used in construction project.  It have the advantages of noise-reduction good effect, low building height, high space utilization and good appearance.

 

With the progress of technology, construction method changes from cast-in-place to precast hoisting.

The most favorable alien template apply for construction project

Specification:

Precast U-Beam formwork structure: outer side formwork, inner formwork, bottom formwork, support lead screw, JACK, work platform, Vibrator, crawling ladder, blanking plate etc.

 

Main products covers:

U-shaped beam

Segmental beam

Climb mold

Integrated pipe gallery

Automatic Prefabrication culvert

Shaped pier

T-beam

Alien template

 

Applied formwork Project:

The most favorable alien template apply for construction project

Our products capacity:

More than 3 state grade certificates
More than 40 patents
More than 10 series main products
More than 10 government and project awards

 

WORKSHOP & EQUIPMENT:

 

 Technology

We offer on site consultation and safety advice to help our customers work safely and improve productivity in each project.

CNBM combines its staff experience with advanced CAD systems and self-developed software to do this job to better meet the market requirements.

FAQ:

1. What we need for formwork design and make proposal?

  Please offer the project drawing, CAD drawing for making design accurately.

2. How fast can the order be delivered?

Please kindly state your desired Delivery date for the order. The order and the desired delivery date will be checked after your order got sent. Of course, we will try our best to meet the specified delivery date.

3. What's the material of the products?

Steel Q235B or Q345B. 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the area of the overlap between columns and beams, beams and beams!
The connection between the column and the beam and the place where the beam is connected with the beam does not need to be deducted from the area.
Q:What is the foundation beam template
The foundation beam without the beam side template of this code, the foundation beam is not calculated at the bottom of the template, select the basis of the beam on the beam directly to the template area.
Q:How to calculate the beam model
According to the calculation of the expansion area, the height of support according to the bottom elevation
Q:In the end is how to calculate the area? Do you want to deduct the board
The bottom of the beam is provided with two side edges, and the side edges are counted to the bottom of the plate
Q:How to determine the height of cast in place concrete beam formwork
Span multiplied by 1/1000~3/1000, can not be so precise, the general is probably about two or three cm
Q:Calculation of beam and column formwork
Tell you a definition, you will understand
Q:Why does the formwork support only three faces?
Only the bottom surface of the beam and the two sides of the board, the above is not to shop template, or how the concrete pouring.The general site is the beam and plate template shop together, the top of the beam and the top elevation of the same plate,
Q:How to do the foundation beam template
Construction sequence: the structure of the column to tie the tendons to the skin of the number of poles to wall masonry before the first floor on the ground has been played by the large axis of the wall body axis and the line. The surface of the base should be clean and wet. When you start the masonry, the brick should be placed and the seam width should be discharged. In the walls before the first vertical skin pole pole, skin should be marked with each skin brick and mortar joint thickness, lintel ring, position, number of rod should be set up in the skin of the building end corner, wall aspect junction and interior wall. Masonry should be up and down the wrong seam, inside and outside the lap, gray seam straight full, the level of gray seam thickness and vertical ash seam width should be controlled at around 1-1.1cm
Q:How to calculate the beam section size is 200 x 400
Building template:Building template is a temporary support structure is made according to the design requirements, the concrete structure components, according to the position and size of the provisions of forming, maintaining its correct position, external loads and under construction template gravity and acting on the. The purpose of template engineering is to ensure the quality of concrete engineering and construction safety, speed up the construction progress and reduce the cost of the project.This paper introduces the construction formwork structure of cast-in-place concrete structure construction, which is mainly composed of three parts: the panel, the supporting structure and the connecting parts. The panel is in direct contact with the bearing plates of concrete; supporting structure is a temporary structure supporting panel, concrete and construction load, ensure the construction template are firmly combined, do not deform and damage; the connecting piece is connected to the panel and the supporting parts of the whole structure.Building formwork is the concrete pouring forming shell and support, according to the nature of the material can be divided into building template, building wood plywood, covered with plastic board, multilayer board, double-sided adhesive, double-sided coated building template. According to the construction process, the construction formwork can be divided into the cast in place concrete formwork, the pre assembled template, the large formwork, the jump formwork and so on.
Q:How to calculate the foundation beam, template, and cushion.
Calculation of foundation beam! When the cap is to be deducted beam

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range