• The most favorable alien template apply for construction project System 1
  • The most favorable alien template apply for construction project System 2
  • The most favorable alien template apply for construction project System 3
The most favorable alien template apply for construction project

The most favorable alien template apply for construction project

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
5000 watt/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

CNBM alien template

Product Introduction:

With the rapid development of urban rail transit project, the formwork mold is widely used in construction project.  It have the advantages of noise-reduction good effect, low building height, high space utilization and good appearance.

 

With the progress of technology, construction method changes from cast-in-place to precast hoisting.

The most favorable alien template apply for construction project

Specification:

Precast U-Beam formwork structure: outer side formwork, inner formwork, bottom formwork, support lead screw, JACK, work platform, Vibrator, crawling ladder, blanking plate etc.

 

Main products covers:

U-shaped beam

Segmental beam

Climb mold

Integrated pipe gallery

Automatic Prefabrication culvert

Shaped pier

T-beam

Alien template

 

Applied formwork Project:

The most favorable alien template apply for construction project

Our products capacity:

More than 3 state grade certificates
More than 40 patents
More than 10 series main products
More than 10 government and project awards

 

WORKSHOP & EQUIPMENT:

 

 Technology

We offer on site consultation and safety advice to help our customers work safely and improve productivity in each project.

CNBM combines its staff experience with advanced CAD systems and self-developed software to do this job to better meet the market requirements.

FAQ:

1. What we need for formwork design and make proposal?

  Please offer the project drawing, CAD drawing for making design accurately.

2. How fast can the order be delivered?

Please kindly state your desired Delivery date for the order. The order and the desired delivery date will be checked after your order got sent. Of course, we will try our best to meet the specified delivery date.

3. What's the material of the products?

Steel Q235B or Q345B. 

 

Q:Beam plate with a few face template
The bottom die and the two side die, the height of the side plate with the height of the plate thickness
Q:What is the meaning of the steel beam overhead on the top of the beam formwork
So in the form of the frame up binding, binding with a crane to lift the steel beam, the following overhead with the wood out of the beam of steel on the template
Q:The area of the beam template = (both sides of the high and low beam) * beam lengthWhat do you mean by the two words in the brackets?
Calculation of contact area between concrete and formworkPillar: circumference multiplied by the column height, from the pile or board surface of a first floor surface, non beam plate count to the bottom of the column cap
Q:More than the number of square cross-section of the beam high formwork
For the height of more than 8m, the total load is greater than 15kN/m2, or the central line load greater than 20kN/m of the template support system needs to organize expert demonstration".
Q:How to do irrigation formwork
For plate 120 H-0.05, the -0.05 here is the elevation of the plate is reduced by 5cm. - drop, + raise. Here the drop and elevation are relative floor elevation.
Q:The formwork support is a beam template which is connected with both sides of the vertical rod and the force at the bottom of the beam and the force of the vertical wire rod which is arranged below the transverse beam at the bottom of the beam
Calculation of anti slide of fasteners? the sliding bearing capacity of the fastener is calculated in accordance with the following formula (5.2.5):R = Rc
Q:How to do the foundation beam template
The main body of each layer of concrete using fixed pump delivery. Before pouring, it is necessary to clear the debris in the template and advance the wet mode, the concrete vibration needs to be timely, coherent, and shall not leak slurry, reinforcement intensive place need to strengthen the vibration, to ensure the concrete density. Concrete vibrator should try to avoid the direct vibration of the template, to prevent the expansion of the joints at the seams, so as to set up the site to inspect the quality of the template.Wall column concrete pouring in place, to prevent the beam, the plate when pouring overflow phenomenon affect the appearance quality, the wall column concrete pouring should be carried out in time for two times to ensure that the structure section size is correct, the founder does not distort deformation.
Q:When there is a beam plate template, the beam can not be added to the template?
When you have a beam template, you can not add the foundation beam template! Their price is not the same, to separate! (mainly reflected in measures)
Q:How to calculate the intersection of rectangular column and beam
Plate and beam plate:(1) the calculation of the area of beam and plate according to the area of beam and plate;(2): high beam plate girders according to the amount of height of sheet thickness calculation;(3) a long beam plate girders: beam to column connection, the length of the beam to column side; girder transfer, beam to beam side.(4) the calculation of the area of the plate and column cap without beam(5) the area of the beam connection is not deducted, and the beam head area is not increased
Q:What is the formula of beam slab formwork
Si=F*A*B, formula, F coefficient, A, length, B width or height.Such as triangle F=0.5, A for the bottom edge of the length, B is high.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products