The most favorable alien template apply for construction project

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 watt
Supply Capability:
5000 watt/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

CNBM alien template

Product Introduction:

With the rapid development of urban rail transit project, the formwork mold is widely used in construction project.  It have the advantages of noise-reduction good effect, low building height, high space utilization and good appearance.

 

With the progress of technology, construction method changes from cast-in-place to precast hoisting.

The most favorable alien template apply for construction project

Specification:

Precast U-Beam formwork structure: outer side formwork, inner formwork, bottom formwork, support lead screw, JACK, work platform, Vibrator, crawling ladder, blanking plate etc.

 

Main products covers:

U-shaped beam

Segmental beam

Climb mold

Integrated pipe gallery

Automatic Prefabrication culvert

Shaped pier

T-beam

Alien template

 

Applied formwork Project:

The most favorable alien template apply for construction project

Our products capacity:

More than 3 state grade certificates
More than 40 patents
More than 10 series main products
More than 10 government and project awards

 

WORKSHOP & EQUIPMENT:

 

 Technology

We offer on site consultation and safety advice to help our customers work safely and improve productivity in each project.

CNBM combines its staff experience with advanced CAD systems and self-developed software to do this job to better meet the market requirements.

FAQ:

1. What we need for formwork design and make proposal?

  Please offer the project drawing, CAD drawing for making design accurately.

2. How fast can the order be delivered?

Please kindly state your desired Delivery date for the order. The order and the desired delivery date will be checked after your order got sent. Of course, we will try our best to meet the specified delivery date.

3. What's the material of the products?

Steel Q235B or Q345B. 

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the building structure of the template
On the contrary, the beam plate is the first template, tied after the reinforcement, because the beam plate is flat, the first binding steel, do you want to let the first suspension? That's not going to collapse
Q:The calculation formula of the beam column
Calculation of the contact area between the template and concrete, there is no formula, there can be no formula
Q:How to control the elevation of the beam bottom and the axis position
The axis is controlled by hanging the ball down to the lower floor axis and the axis control line.
Q:How to calculate the foundation beam, template, and cushion.
The calculation of the net area on both sides of the formwork. Cushion volume should be very good
Q:What is the formula of beam slab formwork
Rectangle, F=1, A is the length of the bottom edge, B is high.....So, S1S2, S3,..., one by one.The sum of the above Si is the total area. The amount of template engineering is required.
Q:How to calculate the beam section size is 200 x 400
The side plate of the plate is the circumference of the plate (minus the protruding part of the column) multiplied by the thickness of the plate 0.1m.Beam slab:Plate beam T beam box girder is divided into cast in place PC box girder and steel box girderBeam type structural member composed of steel plates. The basic section is I-shaped, upper and lower transverse wing plate is vertical plate, the middle name web. Some plates are welded with reinforcing ribs. According to the combination method, it can be divided into welding plate beam, high strength bolt plate beam and dissimilar steel plate beam. Reinforced concrete slab beam.
Q:What is the demolition order of the construction template
Template removal sequence:General is the first non load bearing template, but bearing template; the first side plate, the back plate. Follow the line after the demolition, the demolition of non weight-bearing parts, the demolition of the load-bearing parts and the principle of top-down,
Q:The template is the beam at the bottom of the connection between the two sides of the rod or the bottom of the beam
Calculation of anti slide of fasteners• the sliding bearing capacity of the fastener is calculated in accordance with the following formula (5.2.5):R = Rc
Q:Calculation of the area of beam formwork
Calculation of contact area between concrete and formworkPillar: circumference multiplied by the column height, from the pile or board surface of a first floor surface, non beam plate count to the bottom of the column cap
Q:How to support 6m arc beam template how to set up?
If you use a supporting beam of radian template, the bottom surface made of a whole block template (template block with good reinforcement, pouring backwater) after dismantling the entire arc shape template on the line; if the second half of the same radian can do a whole half arc template do the bottom die.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range