TC6014 8T Tower Crane Equipment with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
You Might Also Like
Structure of Tower Crane
1, TC6014 have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition. With their working radius from 2.5 to 62m, TC6014tower cranes are famous for their large operating ranges, varied working methods and wide uses.
2,This series of tower cranes has a horizontal jib frame, a jib-trolley radius-changing mechanism and a hydraulic self-raising mechanism.
3, It is original in design, reliable in operation and satisfactory in shape.
4,Equipped with all necessary safety devices, these cranes show a good speed-control capacity,, satisfactory operating stability and high work efficiency.
5,They are widely applied for the construction of high-rise hotels, resident buildings, high-rise industrial buildings, large-span factory buildings and tower like buildings like tall chimneys. Best after sales service will be offered which will get rid of all your worries in the purchase of our products
Main Features of Tower Crane
1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.
2, suitable for the group of tower cross homework.
3, boom stability is good, combination amplitude range.
4, suitable for height have special requirements occasions construction.
5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.
Tower Crane Images
Tower crane Specifiction
FAQ of Tower Crane
1.How about the shipment?
You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.
The delivery time is 20 days.
2. What about your service?
We have our factory, we can meet customers needs as soon as possible.
We have first rate professional technology and provide good after-sales service.
3.After Sales Service
We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.
About CNBM
CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.
- Q:mobile tower etc (uk)
- Tower cranes and Gantry Cranes Since toer cranes are the most used in the construction industry gantry Cranes are used in all Ports for loading and unloading containers has a vast scope of work
- Q:I am writing an annotated bib about this topic and I'm not sure where to start looking or what could and couldn't be considered as a theme.
- Stephen Crane Works
- Q:What are the differences between the tower crane and the lift?
- Tower crane is a machine which transports construction materials within the construction site based on its radial range. Usually the radius of tower crane is around 50m to 60m. Capacity ranges from 3 to 6 tons Lift is only used for vertical transport of materials or people in certain building or construction site. Capacity ranges from 2 to 4 tons.
- Q:and it appears to be looking up at the sky?
- they keep their heads held high so everyone who sees them knows that they died with dignity.
- Q:In the end of chapter 16 of Catching Fire the 2nd book of the Hunger Games it says the name she wrote in the dummy, was Seneca Crane. Who is that?!,
- Seneca Crane was the man who ran the Hunger Games in the year that Katniss was in it. He was killed in the end because in the time HE ran the games, TWO people were allowed to win, and President Snow had him killed. It effected the Gamemakers when she wrote it on the dummy because they were shocked and reminded about punishments if they run the games wrong.
- Q:what is the meaning of the color red in the book The Red Badge of Courage by stephen crane?
- In some ways Crane's style is ornate, as has been noted above, with profuse use of color and rampant metaphor in a way which was rare for his time. The blues and grays of the two sides of the American Civil War are often described as natural phenomena, swirling like clouds. Fleming's Regiment was a broken machine. In dialog, however, the style is earthy, written out to sound as close to the vernacular of the day as possible. This realism was later to inform many works but was relatively rare at the time.
- Q:I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
- www.okorder /
- Q:i need some links where to buy batteries for the JG 614 preferably 9.6 i just do not like airsoft megastore thank you everyone
- Crane okorder / I don't really like the crane stock batteries only because they are a mess to put into the gun and taking them out is only a bit better. If you're not a spray-and-prayer, a small nunchuck/butterfly battery would do just fine.
- Q:They seem to be the tallest thing around, so what put them up?
- Large cranes are built in sections imagine like an erector set. When there is a large building to be built the crane arrives in smaller easier to manage pieces and assembled on site.
- Q:I got the crane gold 1.6 roller rocker I'm trying to install on my 95 z28 w/ an lt1 and it doesn't seem like they are installing quite right. I got the tall black nuts that hold the rocker down around the stud and the pushrods, that's it. Do I need to use those things that go below the rockers themselves (the things that slide over the stud and the rocker goes over it from the original rockers) or do I just install how I already am with just the crane rockers, black nuts and pushrods?
- on the LT1 they come factory with screw in studs so the crane application should go without any problems the rocker the rocker guide from crane should slide right on to stud you don't use the old rocker guide for that
1. Manufacturer Overview |
|
---|---|
Location | |
Year Established | |
Annual Output Value | |
Main Markets | |
Company Certifications |
2. Manufacturer Certificates |
|
---|---|
a) Certification Name | |
Range | |
Reference | |
Validity Period |
3. Manufacturer Capability |
|
---|---|
a)Trade Capacity | |
Nearest Port | |
Export Percentage | |
No.of Employees in Trade Department | |
Language Spoken: | |
b)Factory Information | |
Factory Size: | |
No. of Production Lines | |
Contract Manufacturing | |
Product Price Range |
Send your message to us
TC6014 8T Tower Crane Equipment with CE ISO Certificate
- Loading Port:
- China main port
- Payment Terms:
- TT or LC
- Min Order Qty:
- 1 set
- Supply Capability:
- 1000 set/month
OKorder Service Pledge
OKorder Financial Service
Similar products
New products
Hot products
Related keywords