TC5613 8T Rail Tower Crane in India with CE ISO Certificate

Ref Price:
Loading Port:
China main port
Payment Terms:
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Descriptions of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate

1, the topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, save the labor cost, safety and fast.

2, it is suitable for crossover work of the cranes, without the tower cap and pull rod, the safety will be increased when there need the crossover work.

3, It is suitable for the special requirement about the height, such as airport nearby, tunnel, workshop ,and the construction site with high-tension cable.

4, It is suitable for the construction site that has the requirement about the crane boom, it can be used as internal climbing crane in the high-rise buildings, irregular roof or small areas.

5, It is very convenient for dismounting in the restricted construction site, dismount each crane boom at a time by manual.

6, The steel structure of crane boom has long using life and high safety standard.

7, The crane boom is good applicability, high-usage,the design of the topless tower crane boom is easy for realizing the serialization and standardization. Reduce the design and making cost.

8, Low design cost, short cycle, can much better satisfy the multiple demands of the customers.

Advantage of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation. The crane is equipped with lifting height limiter, trolley ranging limiter, moment limiter, weight limiter etc.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Features of our TC5613 8T Rail Tower Crane in India with CE ISO Certificate

Independent height (m)


Max height with attachment (m)


Working range can be adjusted(m) 


Min working range(m) 


Max lifting capacity(t)


Tip load @ 48m(t)


Hoist mechanism




Lifting capacity(t)















YZRWFc225M-4/8 -30/30KW     

Trolleying mechanism





Slewing mechanism




YZR132M2-6-3.7KW X2

Climbing speed(m/min)




Mast section size(L×W×H)m


Working temperature


Total power (KW)


Power supply requirement (KVA)

180KVA for generator

Cable type ( within 30 meters from site power source to lower

 electric box of tower crane )

50mm2(3+2, 5 cores)

Startup voltage & current

380V×95%=361V       179A

Rated working voltage & current

380V                   128A


TC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO CertificateTC5613 8T Rail Tower Crane in India with CE ISO Certificate

TC5613 8T Rail Tower Crane in India with CE ISO Certificate

TC5613 8T Rail Tower Crane in India with CE ISO Certificate

FAQ TC5613 8T Rail Tower Crane in India with CE ISO Certificate

1. why chose us?

China National Building Materials (Group) Corporation (CNBM), established in 1984,now is one of the largest state-owned group corporation in China, dealing with building materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD and total staff is more than 100,000.CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment produced by CNBM are compliant with the National level quality standard, and wins great reputation for their endurable performance in worldwide markets.


2.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.


3. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.


4.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.   

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How do they get construction cranes on the top of buildings?
A combination of methods. Use a helicopter to lift pieces of a small crane to the top of a building and assemble it there. Then use this smaller crane to life pieces of a larger crane to the top of the building for assembly.
Q:Do you find it ironic a crane crashed into Mecca's holiest mosque on 9/11?
Looks like the Karma Bus made a stop in Mecca.
Q:What does a crane symbolise?
The cranes' beauty and their spectacular mating dances have made them highly symbolic birds in many cultures with records dating back to ancient times. Crane mythology is widely spread and can be found in areas such as the Aegean, South Arabia, China, Korea, Japan and in the Native American cultures of North America. In northern Hokkaidō, the women of the Ainu people, whose culture is more Siberian than Japanese, performed a crane dance that was captured in 1908 in a photograph by Arnold Genthe. In Korea, a crane dance has been performed in the courtyard of the Tongdosa Temple since the Silla Dynasty (646 CE). In Mecca, in pre-Islamic South Arabia, the goddesses Allat, Uzza, and Manah, who were believed to be daughters of and intercessors with Allah, were called the three exalted cranes (gharaniq, an obscure word on which 'crane' is the usual gloss). See The Satanic Verses for the best-known story regarding these three goddesses. The Greek for crane is Γερανος (Geranos), which gives us the Cranesbill, or hardy geranium. The crane was a bird of omen. In the tale of Ibycus and the cranes, a thief attacked Ibycus (a poet of the 6th century BCE) and left him for dead. Ibycus called to a flock of passing cranes, who followed the murderer to a theater and hovered over him until, stricken with guilt, he confessed to the crime. Pliny the Elder wrote that cranes would appoint one of their number to stand guard while they slept. The sentry would hold a stone in its claw, so that if it fell asleep it would drop the stone and waken.
Q:How do I make the best paper crane?
Q:how is a tall crane constructed? how can they put the crane on top of its tall body frame?
They first construct the top of crane on the ground with help from other mobile cranes. This includes the long horizontal part with the operator's cab, and the concrete counterweight. this is then placed on a climber, with which the crane kind of builds and climbs itself to the necessary height. Every vertical section of the crane is placed in the climber. When the piece is in place, the climber climbs to the top of piece from where the next vertical piece is placed and so on. You can see how a crane is constructed in the website I've cited below:
Q:What are the common problems encountered in hiring cranes for house constructions?
It might not be the right size for the job.
Q:How to install the jack up tower crane 30How to install the jack up tower crane?
It is required from the upper plus height, then the crane through the motor (hydraulic is not I don't know if not carefully studied to estimate almost) slowly up, because the installation of crane is a separate Union, only the crane is fixed on the top, and is connected to the lower die width ratio some long, above there are for the installation of people stay small table, but also it can open from the opening above the dead ground fill and then fix it by bolt, and then put the live up to OK
Q:Origami Crane Myth.......?
it's true that there is a belief in folklore that making 1000 paper cranes is lucky,or grants a wish. I can't testify to the actual truth of the folklore as I have never made 1000 cranes,but on the surface, it would not seem to follow the laws of probability or physics.
Q:I need help on finding the least amount of steps on how to make an oragami crane.?
Start with a square piece of paper. You got that? Fold the paper corner to corner to get a large right triangle, and fold it corner to corner again to get a smaller triangle. You got that ,or did I lose you. Open the paper, and you will see a big X. Never mind the X. We will come back to it. Now fold the paper side to side to get a rectangle, and fold the two SHORT SIDES to the X fold. Open and do the other two by repeating what you just did. Open the paper FLAT. You can now see a 4 pointed star. Along the four sides of the square, push down on the perimeter of the star to make the star come up. Fold down until you have a flat KITE. Make sure you have 2 flaps on each side. What you are looking at now is one wing, and the other one is in the back. The neck and head are inside the wings. Pull them out half way to expose them. Fold one side at the tip to make a head. If you did everything correctly, and hold under the neck with one hand and pull the tail with the other hand, the crane should flap its wing. Write back if you need more help.
Q:What is the point of Crane Flies?
Your question is one for philosophers or priests because it is a question about purpose. Scientists never ask the purpose of anything, they only ask about functions. There must be thousands of animals that eat crane flies: Fish, bats, birds, robber flies, spiders . . . the list is practically endless. I'm not sure I understand your question about how they exist. How does any living thing exist?

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range