• Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality System 1
  • Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality System 2
Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality

Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality

Ref Price:
get latest price
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 kg
Supply Capability:
1000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

High Quality Steel Ringlock Scaffolding (AS1576 & AS1577)


1.Description:

Ringlock Scaffolding system is mostly popular used system in scaffolding area. It can greatly reduce the cost because of the following advantages

Packaging & Delivery

Packaging Details:

Pallet or bag or upon client's request

Delivery Detail:

35days

 

2.Main Features:

 It will greatly reduce the cost because of the following advantages

1Low cost because less pipes is required

2Easy for you to set up

3It can be used again and again for nearly 20years

 

3.Pictures:

 Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality


Steel Ringlock Scaffolding (AS1576 & AS1577)High Quality

 

4.Description

Type:

ringlock scaffolding diagonal Brace

specification

Ø48.3×3.20

material:

steel Q235

Finished

Hot DIP galvanized, painted

Diagonal length(m)

Weight(kg)

0.9m * 1.25m

6.28

1.25m * 2.7m

11.45

  

5.FAQ

 We have organized several common questions for our clients,may help you sincerely:

1How about your company?

CNBM International Corporation, China National Building Materials (Group) Corporation, is one of the largest companies in China building material & equipment industry, Our formwork and scaffolding are largely used in both domestic and all over world;

2How many Scaffolding your company have?

Here comes our 5 types of Scaffolding systems:

- Cup lock Scaffolding(C-Lock Scaffolding)

- Ring lock Scaffolding

-Kwistage Scaffolding

-H-frame Scaffolding

-ID15 Scaffolding Tower, this type Scaffolding is the most widely used in construction, such like bridge.

3How long can we receive the product after purchase?

Lead time is about 30days after getting the signed PI and deposit.

Q:Find the demolishing scheme of scaffold
Removal methodThe development of the demolition plan, the program should include the removal of the steps and methods, safety measures, etc.. Demolition order should be observed from top to bottom, the first after the demolition, after taking the first demolition principle. That is, first remove the railings, scaffolding, scissors support, diagonal bracing, and then small beams, large cross bars, vertical poles, etc., and according to the principle of one step clear in order to be prohibited from top to bottom at the same time the demolition work. Remove the shelf of the high-altitude personnel should wear safety helmet, safety belt, wear soft shoes on the shelf, at the same time, around the railing or set up a warning sign and a special command, in order to avoid casualties.
Q:What are the common rules for calculating the amount of scaffolding works
The independent brick (stone column) less than 3.60M in height, scaffold to construct the core column multiplied by the circumference of high calculation, the implementation of masonry scaffolding in the shelf; column 3.60M with column wise, the structure of the circumference of the core column height calculated by multiplying plus 3.60M, the implementation of masonry scaffolding outside the shelf (single row). Where masonry height exceeds 1.5m of the masonry are required to calculate the scaffolding.
Q:What issues need to pay attention to the construction of high-level scaffolding
Tool type scaffolding (such as door frame, bridge frame, hanging basket, receiving table) in the removal of the need to stop the maintenance and timely maintenance, and supporting storage.
Q:Cantilever scaffold technical disclosure
Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
Q:I would like to ask how much scaffolding steel prices, scaffolding steel pipe use what are the requirements?
1 scaffolding steel pipe material Q195, Q215 or Q235, 2 scaffolding steel pipe specifications of phi, phi, phi, phi, phi, phi, 3.25, phi, phi, phi, 2.752, 5, 3 scaffolding steel pipe length of 1-6 meters, half a meter specifications; according to customer requirements specifications4 scaffolding steel pipe standard SY/T5768-9, 5, GB/T3091-200
Q:A scaffold is constructed by placing two supports under a 13 ft, 9 in (a) board weighing 84 lbs. The supports are each 2 ft, 8 in (b) from their respective ends. Two painters stand on the board; one weighs 158 lbs and stands 4 ft, 11 in (c) from the left end of the board. Where must the 222 lbs painter stand so that each support carries the same weight? (express your distance in feet from the right end of the board (d).)please help!! thanks(:
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:I have some scaffolding that I would like to use to build a temporary slide to my swimming pool. The slide I would like to be made out of the side parts which are the ones like rectangles with bars going across them and I have a variety of poles. I would then like to put a slippery tarpaulin on to the frame.But how would I hold the tarpaulin up, because the metal poles will be too short? So that if someone slid down it they would not just burst through the tarpaulin and hit the floor after hitting around five metal poles!
Why would you even consider something like that? Obviously you kids and your family use this pool, why put them at risk making a temporary slide with scaffolding. Not a good idea.
Q:Which loads are considered in the design of the scaffold
The variable load of the scaffold shall contain the following contents:1) construction load: including the personnel, equipment and materials, etc.;2) wind load.Safety code for construction of steel tubular scaffold with couplers JGJ130-2011
Q:scaffolding business?
I don't think that it's a term for a specific type of business (like a pyramid scheme), but it's simply a business that sells/produces scaffolding. Scaffolding is a temporary framework used to support people and material in the construction or repair of buildings and other large structures. It is usually a modular system of metal pipes (termed tubes in Britain), although it can be made out of other materials. Bamboo is still used frequently in Asia.
Q:three examples of scaffolding, thanks
Google these 1) Independent scaffold 2) Putlog scaffold 3) Birdcage scaffold

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords