steel formwork for wall,nuclear power plant,LNG...

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1000 m²
Supply Capability:
100000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

for wall,nuclear power plant,LNG...

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are some of the components of the combined steel template, what role?
3, the connector has a U shaped card L - shaped bolt, hook head bolts, fastening bolts, pull bolt, dish shaped fasteners, 3 - shaped fasteners, such as plate type pull rod.4, support tools supporting steel pile, steel column, steel column hoop, hoop steel, steel beam, steel pipe clamp fixture pillar (supporting), steel brace. Planar adjustable steel frame, wood, etc..5, the isolation agent commonly used waste oil and diesel oil (1:1 ~ 4) and silicone co hydrolysate and gasoline (1:10), etc.
Q:Plastic building template? How is the effect? What are the advantages and disadvantages?
Plastic construction formwork turnover number can reach more than 30 times, but also recycling. The temperature range is large, the specification is strong, can be seen, drill, easy to use. The smoothness and smoothness of the surface of the template exceed the technical requirements of the existing clear water concrete formwork, and the utility model has the functions of fire resistance, corrosion resistance, water resistance and chemical corrosion resistance. Can meet the demands of building formwork of various cuboids and cubes, L shape, U shape requirements
Q:Wooden plank road construction, steel structure and formwork,
Labor costs per ton steel production and installation: material loss making 1000 to 1300 + 3%+, 400 + 600+ installation to transport tax management fees, general standard workshop, steel 3 to 10 yuan per square metre, specifically to see the extent of the version and the difficulty
Q:PVC building template introduction
PVC building template is also called wood plastic formwork, plastic formwork, plastic formwork.PVC building template is an energy-saving and environment-friendly products, after the wooden template, composite steel formwork, bamboo plywood, all steel template and a new type of product. Can completely replace the steel formwork, formwork, timber, traditional energy saving and environmental protection, low cost amortization.
Q:Plastic building templates where there is an urgent need to solve
Three, release simple. The concrete does not touch the surface, without the release agent, easy demoulding, easy to clear ash.Four, stable weather. The mechanical strength is high, under the condition of the temperature of -20 DEG C to +60 DEG C, the utility model has the advantages of no shrinkage, no expansion, no cracking, no deformation, stable size, alkali resistance, corrosion resistance, fire resistance, water resistance and insect repellent
Q:Model and method of 60 steel formwork for building
U card is used in the calculation of the formula, in general, each square is about 15 U card
Q:What are the features of the new building template?
On the basis of all steel construction formwork, the surface of the template is extremely smooth, and can reach the international standard of fair faced concrete
Q:What are the advantages and disadvantages of the application of the steel formwork and the plywood formwork in the construction?
From the aspect of Construction: the construction speed of the large steel formwork is fast, the quality effect is good; the wood formwork is assembled slowly, and the bulging phenomenon is easy to occur;
Q:The 18 layer mixed residential building steel formwork Qing wages
According to the actual tonnage of steel - scrap steel according to 340/ tons (including machinery and wire).
Q:What is the difference between the steel template and the assembled steel template?
Stereotypes templates such as 1200*2001500*300 and so on and the combination of steel template is the use of these provisions of the steel template to be spliced into the target combination template.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range