Stair Tower for formwork and scaffolding system

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
50 m²
Supply Capability:
1000 m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Stair Tower

The structure of ring-lock stair tower is the same as Φ60 ring lock scaffolding.

The dimension of cross section is 1500×3000mm.It is widely used in construction.


Bearing Capacity of Stair Tower:

The stair tower can be erected with the maximum height of 150m,

when attached to the wall every 4.5m.



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the characteristics of steel formwork
The weight is light, the board width is big, the weight of the combined steel formwork can be reduced by 1/4~1/5, and the width of the template plate can be enlarged, and the joint of the template group is reduced.2, reduce the amount of steel, than the combination of steel templates can be reduced by 1/2.
Q:Plastic building template? How is the effect? What are the advantages and disadvantages?
Plastic building template is an energy-saving and environment-friendly products, after the wooden template, composite steel formwork, bamboo plywood, all steel template and a new type of product. Can completely replace the steel formwork, formwork, timber, traditional energy saving and environmental protection, low cost amortization
Q:PVC building template introduction
PVC building template is also called wood plastic formwork, plastic formwork, plastic formwork.PVC building template is an energy-saving and environment-friendly products, after the wooden template, composite steel formwork, bamboo plywood, all steel template and a new type of product. Can completely replace the steel formwork, formwork, timber, traditional energy saving and environmental protection, low cost amortization.
Q:Want to ask the difference between the steel template and wooden template
Wood template is artificial site processing, the use of a variety of complex structural modeling, and now use the glue template is also a lot, in addition to good heat dissipation of steel templates, the use of large steel formwork is good
Q:Types of building templates? What is the clear water template
Four categories of building templatesWith the development of economy, in the building materials industry, the emergence of new materials, the type of building classification is increasing, the types of building templates are as follows:
Q:What are the features of the new building template?
No need to be used again after the molding process. The periphery of the template with plate fixation, and a groove can be inserted, the template is extended.
Q:New building formwork support is all steel
The sun angle is used to connect with the cross beam of the outer wall to ensure the angle of the shear wall. The angle of Yin is used for turning the inner wall and connected with the cross beam to ensure the angle of the shear wall. The pull rod is composed of a ground hook, a rod adjusting screw rod and a buckle. Buckle hook and prefabricated description on the ground to draw connection on the top of the connection with the beam through the adjustment screw, ensure the verticality and location of transverse shear wall [hole hole] bar bar bar need to connect with a hook head bolt fastened through wire rod, ensure the transverse shear wall in the doorway of the width and size requirements. The through wall screw is composed of a screw rod gasket and a nut which are used for fastening the crossbeam and the door card. [] similar to the fan-shaped nut fastener gable wall screws for fixing the bayonet.
Q:The first layer is higher than the standard layer height, the big template according to the standard layer
Large template in accordance with the standard layer, the difference between the first part of the roof can be poured?
Q:I would like to ask the bridge column (D110) steel template thickness should be how much
Parting is generally divided according to the release of simple or rounded way, according to the height of the construction plans and schedule requirements. Generally, the height of the column template is set at 1.52 or 0 5m in order to be easy to use.
Q:The 18 layer mixed residential building steel formwork Qing wages
According to the actual tonnage of steel - scrap steel according to 340/ tons (including machinery and wire).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range