Solar Panel Monting System TT-EC-F55

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50万套 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

PV Mounting brackets are special solar photovoltaic systemfor placing, installing, fixing the solar panel design. Generally materials arealuminum, steel structure, stainless steel. PV mounting products at groundmounting system, flat roof mounting system, adjustable angle roof rack system,inclined roof rack system, column bracket system.

The Ground Mounting System including concret basement sysytemand steel pipe sysytem, Titanergy provides total solution for flat or pitchedroof with patent products.On the basis of the given project data, specificnational standards and guidelines, Titanergy will calculate the completestructural analysis and create a complete project plan to make sure reliablestructural safety.We provide high quality HDG steel and aluminum products forthe ground mounting sysytem,witch can make sure the security and durability ofthe project.

Features and Advantages

n  The rail bracket is easy to install, just use simple tools(eg, Allen wrench) can be easily installed. Rail connecting member can freelyadjust the length, the stent may be pre-installed on the roof, and thenappropriately adjusted according to the size of the solar panel.

n  The combination of strong, aluminum rails and card blocks fora variety of venues and a variety of materials roofs (such as metal, ceramicand other kinds of tile surface)

n  Component compatibility, and rail can meet PV modules fromdifferent manufacturers.

n  accuracy, the length of the rail to the nearest millimeter,the construction process, not because of the length is too long or too shortfor the second cut.

n  flexible assembly, rail hooks can adjust the spacing modulearray and tile has been installed successfully address the uneven roofconstruction led to difficult problems.

n  design standards, product design and development process instrict accordance with GB, the German standards and other internationalstandards to ensure products reach the world advanced level.

n  Quality assurance, the stent main material is high-qualityaluminum and stainless steel, effectively prevent corrosion of oxidation.Products can be recycled, reducing environmental pollution.

n Carried out strictly according to the current specificnational standards

n Perfectly optimized components and complete structuralanalysis for the sysytem

n High corrosion resisitance ensure the stability and highdurability

n Total test and certification make sure the high quality ofthe products

n Maximum pre-assembled in factory,quick mounting onsite,timesaving

10-year durability warranty

Technical Data

n Design Period:25 years

n Installation Site: Open area

n Array Angle:10°~60°

n ModuleType:Framed or unframed

n Material:Q235B,Al 6063-T5,Al 6005-T5,StainlessSteel A2-70

n Coating:HDG/Anodised



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is a finished hanger?
Advantages: finished hanger system easy to install, easy maintenance. Have shortened construction time, reduce maintenance time and so on
Q:How to build an effective teaching stent
Some think that instructional design is a process of system planning teaching system; [1] some think that teaching design is a technology used to develop learning experience and learning environment; [2] Some think that teaching design is to promote effective learning For the purpose of the use of modern learning theory and teaching theory, education and communication principles and techniques,
Q:What is the metal material for the RESOLUTE bracket?
Drug-eluting stent implanted in the human blood vessels, the stent to block the blood vessels to support the same time, the drug will be released within a certain period of time from the stent, eluting into the arterial tissue to play the role of inhibition of smooth muscle hyperplasia, so as to effectively prevent the stent site again Clogging (clinically referred to as "restenosis").
Q:What is the difference between a shock support and a conventional stent?
The traditional load-bearing support system is the support system with gravity as the main load (the traditional gravity support hanger only bear the vertical load); 2, the seismic support hanger mainly bear the horizontal load of the pipeline
Q:What are the characteristics of the hydraulic support hydraulic system?
The system of the solenoid valve, but also consider the system of the media, because it is not flammable; second, in these places must ensure that the equipment in the absence of power in the case will not happen, such as hydraulic cylinder return, hydraulic motor
Q:Easy to pave the anti-static floor bracket system?
static floor can be freely in the track orbit on the random placement, free flip, to ensure that the floor of the smooth, beautiful, no deformation, which is the patented technology and conventional Way to install the biggest difference.
Q:What is the support frame at the bottom of the car?
This suspension is widely used in front and rear suspension of trucks. SUV rear suspension also uses steel leaf spring non-independent suspension. It is used in the middle of the U-bolt bolts will be fixed on the axle. Suspension front for the fixed hinge,
Q:What is a high-profile template system?
Large template support system refers to the construction of the construction site concrete component template support height of more than 8m, or erection span of more than 18m, or the total load of more than 15kN / ㎡, or concentrated line load greater than 20kN / m template support system.
Q:Specification for installation of fire pipe support
The spacing of the bracket: the maximum spacing of the bracket is standard, you can Baidu, but the actual installation of the bracket spacing is smaller than the specification, the flange connection, the screw connection when the stent spacing than when the groove connection.
Q:Fire engineering, piping, valves, stent installation of what specific requirements
Construction and construction related to the installation of the pipeline has been basically completed, and the acceptance of qualified, and to provide the necessary information to the installation unit to meet the installation requirements. The associated device is installed in place.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range