Single-side Climbing Formwork CB240&CB210

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT or LC
Min Order Qty:
10 set
Supply Capability:
200 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

1. Structure of Single-side Climbing Formwork

They are framework brackets for supporting large-area wall formwork.

Typical applications for the CB240&CB210 are pier and column/shear wall/core wall/ in the building.

CB210 has smaller size than CB240, it will be cost effective in some condition.

 

2. Main Features of Single-side Climbing Formwork

A) High bearing capacity

The high loading capacity of the brackets allow very large scaffold units. This saves the number anchor points required as well as reducing climbing times.

B) Simple moving procedure by crane

Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

C) Fast striking process without a crane

With the retrusive set, large formwork elements can also be retracted quickly and a minimum of effort.

D) Safe with work platform

The platforms have assembled firmly with bracket and will be climbing together, without scaffolding but can work safely in spite of your high location.

 

3. Single-side Climbing Formwork Images

 

 

 

4. Single-side Climbing Formwork Specification

 

CB-240 Structure Sketch

Single-side Climbing Formwork CB240&CB210

 

CB-210 Structure Sketch

Single-side Climbing Formwork CB240&CB210

 

5. FAQ of Operating Platform

1) What can we do for you? 

We can ensure the quality of the vinyl banner and avoid extra expenses for customers.    

We can provide you the professional design team.    

We can provide fashionable and newest styles for you.    

We can design the artwork for you.    

Please feel free to customize.  

 

2) What promises can be done by us?

If interested in Single-side Climbing Formwork Specification, please feel free to write us for any QUOTE.

If printing required, please advise asap because the whole set need much more time to complete.

Please DO check goods when courier knocks your door and contact us asap if any issue.

 

3) What about of our after-sale service?

Response will be carried out in 24hours  after receiving any complain or request.

If the products are not based on the requirements, there will be the relevant compensations made for you.  

 

 4) What about the package and shipping time?

Packing:  As Customer's Requirements

Shipping: We have various shipping ways for our customers, such as express which including TNT,  DHL,  FEDEX, UPS, EMS, etc. ; by air/ sea, and we are VIP of these express.  

Shipping time:Normally small orders, it just 10~15 business days to arrive your hand; When comes to the customs declaration, it may need 7 days. 

Other mass qty of Single-side Climbing Formwork Specification, we send them out by sea or by air to sea port or air port to save some shipping freight for our customers. 

By ocean, it may need 45~60days, by air, it may need 25~40days.  

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Cast - in - place with beam - plate template support for high engineering
This question comes from the "civil engineering measurement and pricing practice" on page 259 3-3-3 example. This problem has a beam plywood template, steel support project volume (with formula) = 70.66 level and the beam plate support ultra-high engineering volume = 72.93 level and no additional formula. The Landlord would like to know how this 72.93 level by 70.66 flat after what calculated! I am also wondering, hope my supplement is valid, but also hope to get the answer
Q:The problems of improper matching of template supporting system and preventive measures
(1) support the optional sloppy, without a security check, no enough carrying capacity and stiffness, deformation of concrete after casting template. (2) support stability is poor, no guarantee measures, concrete pouring support their own instability, so that deformation of the template.
Q:How the engineering quantity of the square wood supporting the template in the construction project is calculated
Steel pipe according to the building area calculated for each square 5-8. Template by the building area multiplied by 2.5 to 3 times
Q:Main and vice keel upgrade modification - the new building template support birth opportunity
The overall unit of light weight, easy to use the workers, but also reduce the cost. Roof plate support instead of the use of the wooden side, the number of wheel rotation is up to 300 times, excellent re-use rate. As a patented manufacturer of new products with steel instead of wood, we have been working hard to develop and improve, hoping to do our best to achieve more convenient construction materials in the construction process, making workers easier to use and easier to operate ; Make the construction process easier, more secure, shorter construction period; so that the effect is closer to the perfect; so that the construction environment becomes more beautiful, the project image has been greatly improved. It is worth mentioning that the use of steel instead of the wooden side, to protect the environment to reduce the logging of trees made a great contribution.
Q:Template Support System Safety Control
Strengthen design control. Fastener type steel pipe stent support system must have the design calculation and erection program. The calculation content is generally: the strength of the pole, stiffness, stability, fastening resistance of the fastener, the horizontal bar of the strength and deflection of the calculation, the base capacity of the foundation or support the floor of the bearing capacity.
Q:How to use template support?
Can be linked to this person. This is Shengchuan building materials manufacturers
Q:Building template support structure has been widely used
In the current housing construction are required to achieve a certain level of engage in shock, so the general buildings are cast-in-place floor and shear wall structure, so the construction template support structure has been widely used, the national timber increasingly depleted, the domestic north and south are limited Deforestation, steel shear wall template support will become a trend in the future cast-in-place concrete support frame.
Q:After the pouring with the template removed and then how to support
Do not remove the template, but in the template design and erection must be considered in the post-pouring stand alone erection in order to facilitate the future beam, board concrete to a certain strength after the other full scaffolding removed, leaving the part of the back with the template and support. (Theoretically requires beams and plates of concrete strength to reach 100% to be removed). So that the support design of the post-pouring zone takes into account that the value of the load must meet the requirements of this part to support the independent composite and take the necessary observation and maintenance measures for the template and support. This approach allows the concrete at the post- The template is disturbed, resulting in adverse damage to the structural requirements of the bad.
Q:Construction template supporting the use of steel pipe and pull the bolt how much money a ton
Tube is tons of billing, because the wall thickness is different so the price is different, it should be about 6000 it, of course, the pipe is good or bad, the price is different. Bolt site are called fasteners, fasteners, of course, there are weight of the small 1.4 pounds of the general also 1.7 pounds, it should be about 4.0 it
Q:the country is allowed to use
Reinforcement limit concrete card for the construction of shear wall, so that both sides of the card slot can play the role of steel limit and the role of the template, but also control the thickness of the shear wall protective layer. There are 300mm 250mm and 180mm and other specifications.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range