Scaffolding Prop Steel Pipe

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Guizhou China (Mainland)
Brand Name:
SM
Name:
construction props
Adjustable Size:
1600-2900,1800-3200,2000-3600,2200-4000mm
Thickness:
1.6,1.8,2.0,2.2,2.5,3.0mm
Finishment:
Dip Paintng, powder coated, galvanzied
MOQ:
for one20ft containe, 1800-2600pcs
Delivery Time:
20-30days after confirmation
Payment Term:
T/T
Business Type:
Manufacturer in Guangzhou
Color:
red, yellow, blue, green....
Location:
Guangzhou, China

Packaging & Delivery

Packaging Detail:In bundle or in bulk or as your request,normally in bulk can be loaded 1800-2500pcs for different size in one 20ft container.
Delivery Detail:10 to 30 days after order confirmation
Nameconstruction props
Place of OriginGuangzhou China
Brand nameShuangma
SizeØ40- Ø48/Ø48- Ø56 or as your request
Main MaterialQ235, Q195
Surface TreatmentHigh Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized.
ColorSilver, red,orange
CertificateSGS,
ServiceOEM Service available
MOQ500pcs
PaymentT/T
Delivery Time10-30 days after confirmation
PackingIn bulk or steel pallet or as your request
Production capability200 tons per day



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Steel support pre pressure construction should meet the requirements
The slenderness ratio of the support member and the thickness ratio of the plate should be based on the different fortification intensity, according to the current national standard "code for seismic design of buildings" GB 50011.4 support can be used with the original set of steel reinforced concrete members and reliable connection, and measures should be taken to support the reliable seismic force is transferred to the foundation.5 new steel support can be used for the calculation of both ends hinged, and only assume the role of earthquake.
Q:Basement slab reinforcement drawings did not explain how to calculate the final accounts?
In other words, you agree with the owner of the steel, the final settlement by the figure.
Q:When to ask for formwork support
3, the height of the column in the following 2m must be set up a large cross bar, to maintain the stability of the column; when the height of the column is greater than 2m, should be set up a large cross bar, a large step distance of 1.8m.4, every big pillar template should be set two directions of the bar. At the same time, each 4 upright columns are provided with a pair of scissors braces.
Q:The support system of the steel roof structure of a single storey workshop is composed of
In order to ensure the overall stability of the roof bearing structure in the installation and use, to improve the structure of the space work, and reduce the length of the rod in the plane of the roof truss,
Q:Under the steel support line load is 420kn/m (design value)
So, not in tube. Both ends of the tube should have beam, beam should be behind the steel gate or steel concrete continuous wall.The load should appear on the beam or plate
Q:Full fastener type steel pipe scaffold with all the fastener type steel pipe support frame what is the difference?
Check the relevant specifications and manuals. On the basis of "steel tubular scaffolding safety technical specifications" JGJ130-2011 definition: 1, defined as a scaffold in the longitudinal and transverse direction, the scaffold consisting of not less than three rows of pole and the horizontal rod, and horizontal scissors, vertical strut, a fastener
Q:Scaffolding steel pipe support spacing
Must be strictly enforced. The original industry standard "construction fastener type steel pipe scaffolding safety technical specifications" JGJ 130-2001 at the same time abolished.
Q:Why subway steel support axial force value
The main reasons are as follows: 1. The deformation of foundation pit is too large;2, caused by high temperature;Generally, the foundation pit is supported by continuous wall (pile) and steel support. Support axial force monitoring, monitoring the foundation pit in the construction process of the support axial force changes, to avoid the bearing axial force beyond the design strength of the support failure caused by the instability of the whole support system.
Q:How much is the weight of the steel support theory
Supplement:With 150*6 diameter 150mm, 6mm wall thickness seamless or welded steel pipe, round pipe weight adjustment according to it:
Q:What is the pre - steel brace
When it comes to brace generally refers to Rachel steel purlin, it is reinforced, but also to enhance the stability of the purlin purlin, not easy to lose in the external force under certain failure. Section purlin are generally H steel, C shape, Z shape, is reducing cabin panel span and fixed roof panel.The main specifications of steel support are Phi 400, Phi 580, phi, phi, phi, phi, phi, phi, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on, and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range