scaffolding Prop parts plate,pin,screw,nut

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
50万套 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Steel Prop's Part / Accessories for Scaffolding(Factory)

Main Specification :

Meterial:Q235 ,Casting iron ,etc.

Surface treatment:pre-galvanised, electro galvanized or hot dip galvanised,Painted,Poewder coated

Color:Self-color(Black) , Silver

Quality:good bearing capacity,durable & stable

Pls kindly pick out the suitable size(Customized size available.), and then contact me for the price.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:The construction scheme of high rise and external cantilever scaffold!
Cantilever scaffold erection scheme1, the basis of preparation (omitted)2, engineering survey:This project is the building of electricity production, Handan power supply company, located in the main street and Chaoyang Road Interchange, a total construction area of 17747.8m2, the ground layer ten, partial eleven, annex four, underground two floors, the total height of the building is 44 m, frame structure, the project frame adopts double row cantilever beam pick the scaffold in a layer, five layer nine layer is arranged in the cantilever beam. The scaffold scaffold.
Q:How to maintain the scaffold after use
The use of the end of the scaffolding (including the construction of accessories) should be returned to the library, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors. Wuxi Dongfang scaffolding scaffolding factory products strictly according to JOD-1999 and OD15001-1205 standards, a type of mobile scaffolding scaffolding, scaffolding, roulette scaffolding, scaffolding and scaffolding accessories.
Q:Getting my scaffold (industrial piercing) done tomorrow. Tips?
I got my industrial two days ago and it was my first piercing besides the standard lobes and i heard it hurt the worst of all the ear piercings and u have 11? Lol if I could do it u can do it lol I was soooooo nervous and then it just happened and not gonna lie it hurt a lot lol but what I did to distract myself I just talked really loud about the pain lol I was like O MY GOD IT HURTS SO BAD lmao and now it's a lil sore but ull be happy with the results :D
Q:Hello! How much does a scaffold piercing cost... on average?
I paid around $55 +tip for mine but it varies from place to place...just call the place you plan on going to and ask them how much they charge.
Q:Bracket cast in situ beam bracket must use bowl buckle scaffold
5.2.5, the calculation of the column, a clear calculation of the type of stud.6.2.4, clear the structure of fastener type column.Local documents, it is not possible to regulate, do not allow the use of fastener type scaffolding. But the top of the column, to use the provisions of backwater, specification.
Q:what is scaffolding in early childhood?
Scaffolding basically means being the support (a scaffold is a support) in the child's learning. A preschooler can do a range of things. He or she will have mastered some things already and there will also be things that are beyond what he or she can do. When playing with the preschooler, you want to make sure that what's going on falls in that range (zone of proximal development). Don't give him or her something that's too easy or too hard to do, but play games that make them think a little and use what he or she already knows to take it a bit further. I hope I'm not confusing you more. In one sentence..scaffolding is supporting the child in learning something new based on what they already can do or know.
Q:21M high full scaffold erection scheme
2 should be based on the results of the inspection to improve the construction organization design of the demolition of the order and measures, approved by the competent authorities before the implementation;3 removal of debris and ground barriers on the scaffold.4.2 removal of scaffolding, should meet the following requirements:
Q:When scaffolding is erected on the base of the permanent structural concrete
5.2.5 scaffolding engineering A. structural parts (1) structural parts selection and calculation basis
Q:A window washer is standing on a scaffold supported by a vertical rope at each end.. . .?
Sum moments left side...(assume worker 1m from left) Right rope = 316.516 Sum vertical.... Left rope = 552.484
Q:Seeking for the safe construction scheme of mobile scaffolding!
Wall point setWhen the height is not less than 6.0m, you must set the uniform distribution of wall, its setting should meet the following requirements:Door type steel pipe scaffold: when height is less than or equal to 20m, less than 50m2 of a wall, and even the vertical spacing wall point should be less than or equal to 6m; when the frame of high >20m, not less than 30 M2 a point, and even the vertical spacing wall point should be less than 4m.The other floor (or bottom bracket) scaffolding frame: when high than 20m, a point of not less than 40m2, and even the vertical spacing wall point should be less than or equal to 6m; when the high frame >20m, a point of not less than 30m2, and even the vertical spacing wall point should be less than 4m.The free height of the upper wall of the scaffold is not more than 6m.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range