• Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'') System 1
  • Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'') System 2
  • Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'') System 3
  • Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'') System 4
Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
5000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

The 3M*DN125 rubber end hose with two side couplings, normally the hoes is made by NR and reinforced by four layer steel wire, and the two couplings at each side are made by steel material No.ST52, 20#, 37MN5, with hot treatment according to customer’s requests, and also package in bundles or nude packing directly put into container.

Scope of Application of the hose

This end hose can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The end hose is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

 

Product Advantages:

OKorder's 3M*DN125 rubber end hose Channels are durable, strong, and safety. We are the biggest group in this business filed and the majority resources are under our control, which is make sure the delivery time and qualified products, meanwhile we have more than 20 overseas branches our people will go to visit customer very fast for more convenient communication.

 

Main Product Features:

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

 

FAQ:

 

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: If we can produce some pipes according to customers request?

A3: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q4: How to make a quick resolution for after service?

A4: OKorder and our manufacture both have overseas branches all-around of world, if needed,

 

Name

Concrete Pump Rubber Hose

Size

ID

OD

Number of layer

Work pressure

bursting pressure

weight

3.5"

113

2

1200psl

3000psl

6.8kg/m

4"

128

2

1200psl

3000psl

7.8kg/m

5"

154

2

1200psl

3000psl

10kg/m

5"

154

4

1200psl

3000psl

12kg/m

6"

181

2

1200psl

3000psl

15kg/m

Other size and types upon request

Usual Size

4"-DN80, 5" -DN125, 6"-DN150

Material

natrual rubber,steel wire 

Technic

steel wire weaving,composite molding

Application

used in concrete transport of concrete pump end in   construction work

Serving Brands Of Mounted Truck Concrete Pump And   Concrete Pump

SANY,Zoomlion,PM,CIFA and so on

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')



Q:What is the purpose of a concrete pump agitator motor?
The purpose of a concrete pump agitator motor is to ensure the consistency and quality of the concrete mixture being pumped. It is responsible for keeping the concrete mixture well-mixed and preventing it from settling or separating during the pumping process. The agitator motor helps to maintain a uniform and homogenous mixture, which is crucial for achieving strong and durable concrete structures. By continuously agitating the concrete inside the pump, the motor helps to prevent any blockages or clogs that could potentially disrupt the pumping operation. Overall, the purpose of a concrete pump agitator motor is to enhance the efficiency and effectiveness of the concrete pumping process, ultimately resulting in better construction outcomes.
Q:How can I minimize downtime during the replacement of concrete pump spare parts?
Minimizing downtime during the replacement of concrete pump spare parts requires careful planning and efficient execution. Here are a few strategies that can help you achieve this: 1. Regular maintenance: Implement a proactive maintenance schedule to identify and replace worn-out parts before they fail. Regularly inspecting the concrete pump and its components can help prevent unexpected breakdowns and reduce downtime. 2. Stock up on spare parts: Keep an inventory of commonly required spare parts, such as seals, filters, and hoses. Having these items readily available can significantly reduce the time spent on sourcing and ordering parts when a breakdown occurs. 3. Partner with reliable suppliers: Establish a relationship with reliable suppliers who can provide high-quality spare parts quickly. This ensures that you have access to the required parts promptly, minimizing the waiting time for delivery. 4. Train your team: Provide training to your maintenance and operational staff on how to identify, troubleshoot, and replace concrete pump spare parts efficiently. Equipping your team with the necessary skills will enable them to address issues promptly, reducing the overall downtime. 5. Plan maintenance during downtime: Schedule maintenance and replacement of spare parts during periods of low demand or downtime. This could be during weekends, holidays, or slower construction phases. Planning the work strategically ensures that it has minimal impact on ongoing projects. 6. Optimize workflow: Streamline your maintenance process by identifying areas that cause delays or bottlenecks. Look for opportunities to improve efficiency, such as optimizing the layout of spare parts, tools, and equipment, or implementing standardized procedures for repair and replacement. 7. Use technology: Leverage technology to monitor the performance and condition of your concrete pump. Implementing a condition monitoring system can help detect early signs of potential failures, allowing you to plan for maintenance and part replacement in advance. By implementing these strategies, you can minimize downtime during the replacement of concrete pump spare parts, ensuring uninterrupted operations and maximizing productivity.
Q:How often should concrete pump seals be replaced?
The frequency at which concrete pump seals should be replaced depends on several factors, including the type of pump, the quality of the seals, the operating conditions, and the maintenance practices. Generally, it is recommended to inspect and replace concrete pump seals every 500 to 1,000 pumping hours or annually, whichever comes first. Regular inspection is crucial to identify any signs of wear or damage in the seals. Common indications for replacement include leaks, excessive vibration, reduced pumping efficiency, or visible degradation of the seal material. If any of these issues are observed, it is essential to promptly replace the seals to prevent further damage and ensure the optimal functioning of the concrete pump. It is worth noting that certain pumps may require more frequent seal replacements due to their design or operating conditions. For example, high-pressure pumps or those used in abrasive environments might experience accelerated wear on the seals, necessitating more frequent replacements. To prolong the lifespan of concrete pump seals, proper maintenance and care are essential. This includes regular cleaning of the pump and seals, ensuring proper lubrication, and following the manufacturer's guidelines for operation and maintenance. Additionally, using high-quality seals and regularly inspecting them for signs of wear can help extend their longevity. Overall, the replacement frequency of concrete pump seals should be determined through a combination of regular inspections, adherence to maintenance practices, and consideration of the specific operating conditions.
Q:What is the role of a concrete pump agitator shaft seal?
The purpose of a seal on the agitator shaft of a concrete pump is to prevent any substances, like concrete or grout, from leaking or seeping out. Its design aims to create a secure seal between the rotating shaft and the fixed housing, guaranteeing that no materials escape while the pump is in use. This is crucial for upholding the pump's efficiency and effectiveness by preventing any loss of material. Additionally, the seal safeguards the agitator shaft from potential harm caused by external contaminants such as dirt or water, which could potentially damage the pump. Overall, the concrete pump agitator shaft seal is essential for ensuring the pump operates smoothly and reliably while maintaining the quality of the materials being pumped.
Q:How long do concrete pump spare parts typically last?
The lifespan of concrete pump spare parts can vary depending on several factors such as usage frequency, maintenance practices, and the quality of the parts. However, on average, concrete pump spare parts are designed to last for several years before requiring replacement.
Q:Can concrete pump spare parts be retrofitted to older pump models?
Yes, concrete pump spare parts can be retrofitted to older pump models. However, it is essential to ensure compatibility and proper installation to guarantee optimal performance and safety. Professional advice and support should be sought to ensure correct retrofitting of spare parts to older pump models.
Q:Can concrete pump spare parts be coated with anti-corrosion or anti-wear coatings?
Certainly, it is possible to apply anti-corrosion or anti-wear coatings to concrete pump spare parts. These coatings serve as an extra protective layer, effectively shielding the spare parts from corrosion and wear caused by the tough operating conditions and abrasive substances encountered during concrete pumping. Usually composed of materials like epoxy, polyurethane, or ceramic, these coatings boast exceptional resistance against corrosion and wear. By applying these coatings, the lifespan of concrete pump spare parts can be significantly prolonged, consequently reducing the need for frequent replacements and resulting in cost savings for operators. Furthermore, the presence of anti-corrosion and anti-wear coatings can enhance the overall performance and efficiency of the concrete pump, ensuring smooth and dependable operation.
Q:Can a concrete pump pipe be repaired or should it be replaced?
A concrete pump pipe can typically be repaired rather than replaced, depending on the extent of the damage.
Q:How often do I need to replace concrete pump spare parts?
The frequency of replacing spare parts for concrete pumps depends on several factors, such as the quality of the parts, how often the pump is used, and the maintenance practices followed. In general, if you use high-quality spare parts, they can last longer and won't need to be replaced as often. However, if the pump is used extensively or in harsh conditions, the spare parts may wear out more quickly. To ensure that your concrete pump performs well and lasts a long time, it's important to stick to a regular maintenance schedule. This includes checking the spare parts for any signs of damage, monitoring their performance, and replacing them when necessary. It's a good idea to consult the manufacturer's guidelines or get professional advice to determine how often you should replace the spare parts for your concrete pump. Remember, if you neglect proper maintenance or use low-quality spare parts, you may need to replace them more frequently, which can be expensive and disrupt your construction projects. So, it's worth investing in high-quality spare parts and following a diligent maintenance routine to maximize the lifespan of your concrete pump and minimize the need for replacements.
Q:How often should concrete pump control boxes be inspected and replaced?
Concrete pump control boxes should be inspected regularly, ideally every 6 to 12 months, to ensure they are in good working condition. The replacement of control boxes should be done only when necessary, such as when they are damaged or malfunctioning, and should be based on the manufacturer's recommendations and industry standards.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords