Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
10 pc
Supply Capability:
5000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The 3M*DN125 rubber end hose with two side couplings, normally the hoes is made by NR and reinforced by four layer steel wire, and the two couplings at each side are made by steel material No.ST52, 20#, 37MN5, with hot treatment according to customer’s requests, and also package in bundles or nude packing directly put into container.

Scope of Application of the hose

This end hose can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The end hose is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

 

Product Advantages:

OKorder's 3M*DN125 rubber end hose Channels are durable, strong, and safety. We are the biggest group in this business filed and the majority resources are under our control, which is make sure the delivery time and qualified products, meanwhile we have more than 20 overseas branches our people will go to visit customer very fast for more convenient communication.

 

Main Product Features:

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

 

FAQ:

 

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our products?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: If we can produce some pipes according to customers request?

A3: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q4: How to make a quick resolution for after service?

A4: OKorder and our manufacture both have overseas branches all-around of world, if needed,

 

Name

Concrete Pump Rubber Hose

Size

ID

OD

Number of layer

Work pressure

bursting pressure

weight

3.5"

113

2

1200psl

3000psl

6.8kg/m

4"

128

2

1200psl

3000psl

7.8kg/m

5"

154

2

1200psl

3000psl

10kg/m

5"

154

4

1200psl

3000psl

12kg/m

6"

181

2

1200psl

3000psl

15kg/m

Other size and types upon request

Usual Size

4"-DN80, 5" -DN125, 6"-DN150

Material

natrual rubber,steel wire 

Technic

steel wire weaving,composite molding

Application

used in concrete transport of concrete pump end in   construction work

Serving Brands Of Mounted Truck Concrete Pump And   Concrete Pump

SANY,Zoomlion,PM,CIFA and so on

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')

Rubber End Hose with One Side Couplings Working Pressure 85 Bar 3M*DN125(5.5'')



Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:If the concrete pump valve jam how to judge and deal with?
The valve plug is formed gradually, the main reason is that after the completion of concrete pump, no time to use high-pressure water washing, resulting in concrete residue in the tube after a considerable period of time, gradually thickening, accumulation of consolidation, resulting in congestion.
Q:How does the concrete pump work?
When the pump is in place, support the leg and keep the body level and stable. When feeding with a distributor, the body shall not exceed 3 degrees of inclination
Q:How to choose concrete pump?
The actual export pressure of concrete pump and the actual product per hour, the greater the value, the greater the capacity index, the power of the motor will be greater, thus achieving the purpose of large displacement, high lift
Q:What are the types, classifications and specifications of concrete pump?
According to the maximum hourly transport rate, there are 20-100m3 range, and most of the concrete pump can achieve two variable displacement or stepless variable
Q:In general, how much concrete will be transported per hour for the concrete pump and the pump?
Day pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to completeDay pump, usually with concrete tank car, a jar of 9 cubic meters, unloading 7-10 minutes to complete
Q:What is the washing process of the concrete pump pipe?
Open the first section of the reducing pipe and the discharge gate, and thoroughly remove the remaining concrete in the hopper, the distributing valve box and the reducing pipe.
Q:Which height of concrete pump is the most practical?
Concrete pump truck height, according to their engineering height to determine, in reality the most widely used is 46 or 47 meters, this height is moderate, suitable for most projects in use
Q:What is the name of the pump for concrete transportation?
Concrete pump truck is modified on truck chassis. It is equipped with motion and power transmission device, pumping and mixing device, cloth device and other auxiliary devices on the chassis.
Q:Why would the plugging concrete pump pipe
When pumping, the operator shall observe the leftover material in the hopper at any time. The remaining material shall not be lower than the stirring shaft. If there is too little material, the air will be easily inhaled, which will lead to pipe blockage. The material in the hopper can not be piled too much, should be lower than the guard bar, so as to clean up the coarse aggregate and super large aggregate in time
Q:What are the precautions for gas washing of concrete pump?
If it is found that the wash is not moving, it should first close the intake valve, and then slowly open the exhaust valve bleeding, and then try to segment cleaning.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range