QTZ63 TC5610 Self Erected Top Quality Tower Crane

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
50 set/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Maximum Lifting Weight: 6t Maximum Lifting Height(M): 40/140 Rated Loading Capacity: 6t
Span: 112m Rated Load Moment: 630kN.m

Product Description:

Characteristics of Tower Crane

1)This tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

4) The crane has complete set safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

QTZ63 TC5610 Self Erected Top Quality Tower Crane

QTZ63 TC5610 Self Erected Top Quality Tower Crane

Key Processing Step to ensure the quality

1, Advanced material -heat -treatment processing to ensure the quality.

2, Automatic union melt welding ensure its beautiful looking and strong welding joints.

3, Double sided milling machine ensure each mast section connected closely and firmly.

4,All steel experience  rust removal for twice.

Main Technical Parameter

QTZ63 TC5610 Self Erected Top Quality Tower Crane

 

Packaging Details:40 HC containers; 
Wodden cage for electrical parts 
Steel box for small parts
Delivery Detail:20-25 days after received the advanced money

QTZ63 TC5610 Self Erected Top Quality Tower Crane

China National Building Materials (Group) Corporation (CNBM), established in 1984,

now is one of the largest state-owned group corporation in China, dealing with building

materials & industrial equipment. Up to year 2010, CNBM Group's total asset is 20 billion USD

and total staff is more than 100,000.

CNBM International Corporation, specializes in designing & manufacturing of various

kinds of construction machinery, including tower crane, building hoist, etc. All the equipment

produced by CNBM are compliant with the National level quality standard, and wins great

reputation for their endurable performance in worldwide markets.

Key reason for CNBM's achievements:

Research and Development (R&D)

- Our own systems of production engineering.

- Production design from the concept to the engineering details.

- National level research academy for various building equipment for over 30 years.

- Continuous development of new solutions and products adapted to the requirements of our clients.

- Technical experts with abundant experience in relative fields.

Production

- Complete quality control system.

- Nearly 20 years experiences in manufacturing fields.

- Full production capacity up to 1000 tower cranes annually (with various load from 4tons to 40tons ).

Commercial & marketing

- Customer-oriented philosophy.

- Full international business experiences.

- Global network & localization strategy.

- Professional & high efficiency team.

Service

Under the guidance of "globalization + localization" strategy, in most of our main markets, the marketing

operations & after sales services are carried out by CNBM's local partner companies.

To provide enough & timely support to the local partners, CNBM has set up 6 branches in the world (with more to ensuring the best services to the end-users along with high quality equipment.

Our Service Branch

CNBM INTERNATIONAL CORPORATION U.A.E BRANCH

CNBM INTERNATIONAL CORPORATION K.S.A BRANCH

CNBM INTERNATIONAL CORPORATION IRAN BRANCH

CNBM (U.S.A) CORPORATION

CNBM INTERNATIONAL(RUSSIA)CORPORATION

CNBM INDIA CORPORATION

CNBM NIGERIA CORPORATION

CNBM KAZAKHSTAN BRANCH

CNBM VIETNAM COMPANY LIMITED

UNDER CONSTRUCTION OTHER PLACES

Service

----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:what are the materials and steps for making an electromagnetic crane?
I am assuming you mean a low power, miniature crane. You will want to wrap a iron object (a nail should work for light objects) in electrical wiring, the more times the better. Make sure you have a long length of wire after wrapping it around the iron object. Now, attach a rope to the iron object, this will be used to raise and lower it. The length of the rope has to be less than the length of the wires. Now, inside the crane have a battery. The stronger the battery, the stronger the electromagnet. Now, after connecting one of the wires to the battery, connect another one to a switch, then connect then switch with more wiring to the battery. This will turn the crane's claw on and off. The next part is up to you. If you want to be able to raise and lower the magnet, attach the rope to an axel and spin the axel to raise or lower the magnet. If you want to turn the crane, you need to place the arm on a swivel axis. Finally, to bring the magnet closer or farther, you will need a way to raise the arm, bringing the tip of the arm closer to above the center of the crane. I suggest you google some picture of cranes to understand this better.
Q:Does my truck support this mounted-crane?
Click here to find your answer
Q:Stephen Crane short stories?
sorry, i haven't read any Crane short stories, but i'm a HUGE fan of his poetry. it's some of the most bleak, raw, yet honest poetry i've ever read.
Q:Information about the endangered Siberian White Crane?
Check okorder.com. There is some very interesting information at this site.
Q:How do those cranes that build skyscrapers that go up with the building get back down after it's completed?
little pieces by welly chopper
Q:How's electricity delivered to Overhead Cranes?
Hot rails running along side the beams Hot shoes on the crane make contact with the hot rails and slide along the hot rails. Hot rails mounted to the beams by insulating bells. The hot rails can be anywhere in size from trolley wires to rails the size of railroad track rails. AC cranes are usually 3 phase so they will have 3 hot rails. DC cranes will usually have just 2 hot rails. Main disconnect/lock out feeds hot rails. It is usually fused but can also be just a disconnect switch. The same arrangement also is used on the crane's trolley. But in the case of the trolley one set of hot rails feeds the trolley motor. One set of hot rails feeds the main hook {big hook} motor: One set of hot rails feeds the auxiliary hook motor {little hook} motor. If the crane is also used as a Mag crane {Electro magnetic can be used} it will also have a set of hot rails going to the trolley for the magnetic
Q:Crane Accidents in NYC--Do you believe they are accidents or sabotage?
The okorder.com. My theories are all too real and not made up poppycock like those who still have the notion the president of the U.S. was behind the WTC attacks and the killing of 3,000 Americans. Communism is our enemy along with radical Islam and that is why John McCain needs to be elected with a landslide vote.
Q:What are the requirements for the use of an anti-two block device on a lattice boom crane used as a drill?
Any modifications to a crane or other hoisting device should be checked with the manufacturer or designed by an Engineer schooled in the proper discipline IE: not an electrical or nuclear engineer.
Q:What is the present status of large Boom Tower Crane?
Large boom crane arm depicts one and another new history. New York's World Trade Center towers is the skyscraper that is the highest and has the most floor in New York City .Its main building is steel and concrete composite structures,using steel 78 thousand tons.The Building started in 1966 and lasted seven years, with 110 layers, 411 meter in height as a giant skyscraper it is writed in history. During in Construction
Q:Why hasn't Obama fixed that hanging crane yet?
sure.. because after more tax cuts on the rich and starting another war... it would be possible if u think the crane is more important than the 1000s of people stuck then i hope u r some stupid 11 yr old kid becauz u should not vote

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range