• QP7527 16 tons Flat-top Tower Crane TCP7527 System 1
  • QP7527 16 tons Flat-top Tower Crane TCP7527 System 2
  • QP7527 16 tons Flat-top Tower Crane TCP7527 System 3
  • QP7527 16 tons Flat-top Tower Crane TCP7527 System 4
QP7527 16 tons Flat-top Tower Crane TCP7527

QP7527 16 tons Flat-top Tower Crane TCP7527

Ref Price:
get latest price
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
3 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Quick Details

  • Feature: Topless Tower Crane

  • Condition: New

  • Application: All construction projects

  • Max. Lifting Load: 16 tons

  • Max. Lifting Height: 213.7 m

  • Place of Origin:  China (Mainland)

  • Brand Name: CNBM

  • Model Number: H3/36B

  • Certification: ISO9001, CE Certificate, GOST Certificate

  • After-sales Service Provided: Engineers available to service machinery overseas

 

 

Main Features

 

1)  tower crane is one of the key product of CNBM company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 180m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

The range-change structure drives the dolly to change range on the horizontal arm, with good positioning performance. Planet gear decelerator is applied in the circumgyrating structure, together with moment-limiting hydraulic coupler, which can relize high load capacity, steady starting and reliable operation.

 

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.

 

Product Picture

 

QP7527 16 tons Flat-top Tower Crane TCP7527

QP7527 16 tons Flat-top Tower Crane TCP7527

QP7527 16 tons Flat-top Tower Crane TCP7527

QP7527 16 tons Flat-top Tower Crane TCP7527

 

 

Prameter List

QP7527 16 tons Flat-top Tower Crane TCP7527

Please note that we can supply both standard mechanism and frequency mechanism, and the rope capacity can be adjusted as per clients' specific requirements.

 

 

Packaging & Shipping

 

All our packing ways are standard packing. In wood case or carton, as you like. After the production, we will do our best to do the shipping as soon as possible. Best Service is our sart of business.

 

 

Our Services

  

----Providing timely delivery, standby engineers are ready to slove any of your problem

----Providing all-embraced warranty of products quality, worksite installation guidance

----Providing ample spare parts and training of operation and maintenance

----Engineers have more than 20 years' experience in tower crane, ready to solve any of your  problems.

Q:3years after I quit a job,I am once again looking toward the same field it's just that in my old job they helped me get a crane license when I left the job they kept my certification .How can i get that info without asking my old work for it,or would i have to take the course over?
There is actually no such thing as a crane operators licence - you should tell your new employer that you had undertaken a course in your previous employment and were authorised by them to operate their cranes. The new employer will most likely then send you on another course and issue you with their operators authorisation. The authorisation from your old employer is not transferable to the new one so not having the certificate is not a major problem. It is however good practice for employees to receive a copy of the certificate for their own records.
Q:Iv done some research and I cant seem to find a place that might sell jibs locally here in Phoenix. Iv been considering the ProAm DVC 200 crane but I would also like to see others in like a store. If anyone has any info it would be appreciated!
I went down that path last year in the SF Bay Area in California. I could not find a store that carried any cranes or jibs - so I just started asking around. Stay away from any that use cables to keep the stage steady - we used one at a shoot - setting up is an interesting challenge. I thought I wanted the same unit you are looking at - and decided I needed to trust the crane a bit more with my HDR-FX1... I had to wait longer to save more $, but I really like the crane and tripod kit I ended up with... from Kessler Crane... I never got to see it before I bought it and I was, um... nervous... but I am glad I made the investment - and Eric Kessler is REALLY helpful and great to work with. One of the other cranes I looked at uses a heavy duty PA speaker stand as its tripod base. After watching light trees and PA speakers fall over because of leg failure, I could not bring myself to trust them to hold my camcorder. I can STAND or JUMP on the Kessler tripod and it does not budge. It is rock-steady and really strong. The Hercules head is silk-smooth and the crane-arm and camera stage are steady and easy to manipulate. After a little practice, it now takes me about 10-15 minutes from the time I start unpacking until I am ready to start shooting. That includes mounting the camcorder, setting the counterweights, mounting a portable DVD player with AV-in as the monitor mounted to the tripod-head so I can see what the camcorder is shooting and running the AV, headphone and LANC cables and making the whole thing pretty with velcro strips.
Q:how do i make the paper crane from prison break?
i okorder / hard to explain without showing.
Q:My hubby just passed his crane test yesterday, and I was wondering how much they pay? He was told to ask for 50k a year..that includes crane time where he works. Can we really ask that? He sets trusses for a big lumber company in Missoula Mt. Any help would be great.
I'm sure it depends on where you work, and what kind of crane. 20-ton bridge where I worked paid about $20k/hr, and included overtime, so that would be approaching 50k/yr
Q:Hey,My grandma has a big country estate with a river and its her birthday coming up. She's indicated she might like another peacock (we've had them before), but I'm thinking of branching out into other birds. We tried Lady Amerhursts pheasants, but one of the dogs knocked over their cage before they were properly acclimatised and they disappeared.So, does anyone know if its possible to get storks or cranes or other big waterbirds to keep as domestics?They'd be free ranging on the estate and the river, so need to be smart about foxes and mink (ie roost in trees or go into a house). We've kept geese and ducks successfully on our river like this, so does anyone have any ideas?Or should we try again with pretty pheasants?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:do they eat them or what??i hear about hunting them and i think cool but what do you do with them i mean do they tast good??
Eating Sandhill Crane
Q:so yeah i know that cranes do the main work but i guess there are no such really toll cranes to do that with skyscrapers ?
They put a crane on the ground, and they build 5 stories, say. Then they put the crane on top of the 5th story, and build another 5 stories, then they put it on the 10th story and build 5 more, etc. Or it's hanging on the side of the building, moving upwards as the building rises.
Q:The role of slewing limiter in tower cranes is limited
The crane or winch motor winding rope arranged on the roller loose, hoisting large demolition, resulting in the large load fast rope rope cut into bundles, causing fast rope severe jitter, vulnerable to instability, the results often appear to work and stop dangerous, can not stop the embarrassing situation.
Q:I want to win a watch from a skill crane at Dave and Buster's and I need some tips.
www.okorder /
Q:What are the luffing, slewing, and walking points of a tower crane?
The luffing of a tower crane is the forearm of a crane;Slewing means the steering mechanism of a crane;Walking means the walking trolley on the luffing range of a crane

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords