Movable High Vacuum Soot Purifier 160-350 m3/h

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
50 pc
Supply Capability:
5000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Features

● It adopted low noise and high vacuum fan, The ventilation effect is obvious.
● With compact design and small size, it doesn’t take too much space. 
● Its connected accessory not only can be a high vacuum suction gun but also a high –pressure suction mask, etc. 

Apply to the site
● For the small size, it can be used in a narrow position. 
● It can be used in a single robot welding. 
● For it lower noise, I t can be used in a welding Application for high vacuum test or a training place. 

Parameters

Model

KSG-1.0B

KSG-1.5A

KSG-2.2A

Treatment of air flow

160 m3/h

190 m3/h

350 m3/h

Motor Power

1.0 Kw

1.5 Kw

2.2 Kw

Voltage

220 V/50 Hz

380 V/50 Hz

220 V/50 Hz

Filtration area

3 m2

5 m2

8m2

Cylinder surface cleaning methods

Manual cleaning

Automatic cleaning

Automatic cleaning

compressed air

0.5~0.6 MPa

0.5~0.6 MPa

Filtration efficiency

>99.9%

>99.9%

>99.9%

Max Vacuum

21000 Pa

23000 Pa

25000 Pa

Noise

≤74dB(A)

≤65dB(A)

≤70dB(A)

Demission

334×420×658㎜

550×550×1110㎜

650×650×1300㎜

Weight

18 Kg

107 Kg

156 Kg

 

After-sales Services Undertakings

1. During the equipment commissioning period, the company will send scheduler to commissioning to ensure debugging smoothly and a one-time test commissioning.

2. The company is responsible for professional users’ on-site operator training and technical exchange.

3. The long-term tracking service system: we practice lifelong quality of our product tracking service, and we also will take effective measures and solutions for the user of the technical issues and equipment problems.

4. Regularly listen to opinions and suggestions of users, to provide users with new trends in technological innovation, new product information and enhance mutual understanding.

5. Any problems, the company will provide solutions for users within 48 hours.

 

FAQ

1.   How long will my inquiry get response?

 Your inquiry related to our products or prices will be replied within 24 hours.  

 2.  Can I get professional service and suggestion?

Well-trained and experienced staffs to answer all your questions in fluent English.  

 3.  Do you accept OEM or customized design?

OEM & ODM, any your customized lightings we can help you to design and put into product.

 4.  What if I need specific design?

Distributorship are offered for your unique design and some our current models.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Gas boom installed when the issue of "creak" sound, I do not know what is the fault?
May be the sound of the exhaust fan! The When the fireplace starts the first start is the fan!
Q:Where to buy Viagra accessories? Coaxial flue?
OKorder on a pile of ah, I bought.
Q:I would like to buy online Mendi Riding, I would like to buy what accessories?
In addition to the installation of an open reclamation planted in the old state of the connection pipe does not need any accessories, the installation of the master will generally own, and can also go to the nearby hardware store with. It is recommended not to buy online, you can go to Manrui authorized the country's 3000 system integration service providers to buy, you can also Man Rhee official website or consult the local office, anytime, anywhere to provide pre-sale sale of quality service.
Q:How to open a gas boiler shop, to what procedures
Have a business license, and have experienced professionals working on boiler maintenance. If you have any questions, please help you...
Q:Voorburg gas boiler first use, open the number of appropriate
Indoor not more than 25 °, 20 to 22 ° best. The boiler is set to 70 to 75 °.
Q:The indoor temperature is based on the temperature of your heating film changes
Are well-known brands, each brand has one of the outstanding performance of the boiler, the key is very important after-sales service.
Q:What is the stall for the boiler? Is it part of the interior of the combustion chamber?
The grate of the boiler is a component that burns the mixed gas. Is part of the interior of the combustion chamber. Indoor oxygen will not enter the combustion chamber, because the boiler work in the micro-negative state, no indoor air, completely by the outdoor through the coaxial flue.
Q:Why can the three-day bad, maintenance accessories astronomical!
Viagra accessories are very expensive, but you say three days and two bad should not it, Granville to the quality or did not have to say.
Q:Ariston boiler is not homemade imported mixed sell?
Ariston is now imported very little, because in China to build factories, you think it will be imported from abroad? / Almost all domestic products
Q:What are the main parts of the fireplace, such as to buy real fire fireplace in what accessories!
Fireplace core, coal shovel, broom, screen, fire protection network barrier column;, firewood, firewood basket, smoke pipe, smoking hats and so on.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range