Light Steel Villa for South America

Ref Price:
Loading Port:
Shanghai
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
20000㎡ m²/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

This product belongs to Ligth Steel Frame Structure.

This structure is formed by the dense light steel studs and compound envelop and with all kinds of supprior physical qualities.

Advantages:

1. Flexible combination
2. Easy transportation
3. Fast construction
4. Cost saving
5. Removable & recycle

6. Thermal Insulation
7. Seismic and wind resistance
8. Roof Load-bearing

Packing:

light steel packing: light gauge steel in bulk, decorate panel material in pallet, other fittings all in boxes, loaded into 40' GP and 20' GP on container.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to calculate the vertical shipping cost of decoration
Mainly used in anti-corrosion, pressure vessel manufacturing, electric construction, petrochemical, pharmaceutical, light industry, automobile and other industries Composite material according to the appearance can be divided into composite panels, composite pipe, composite bar and so on
Q:How long can a composite floor be used?
How long can a composite floor be used?
Q:How to make artificial marble?
1, 5 to 100 ingredients: white jade or Zuanjing rosin powder and ultrafine calcium carbonate powder, mixed materials A;2, in the mixture A add pigment mixing, time 5 ~ 2O minutes, get mixture B;3, in the mixture of B add transparent unsaturated polyester resin, initiator and accelerator, mixing and stirring, and then vacuum, vacuum degree of 60 70cmHg, continue to stir until the material becomes a mass, the mixture C;4, in the mixture of C transparent nano SiO material, stirring, vacuum after the material into the mold;5, the material will be injected into the mold vacuum chamber, the oscillation pressure, molding;Release 6, after curing, the curing time is no less than 6 days after the release of maintenance hours:7, according to the specifications, the mold after the cutting, polishing and finishing, that is pervious to artificial marble.
Q:What are the properties of cement?
Cement should be tested for its following properties: 1. Fineness Fineness, or particle size of portland cement affects rate of hydration, which is responsible for the rate of strength gain. The smaller the particle size, the greater the s
Q:Haunted Houses & Real Estate Question?
Most states have laws that mandate disclosing known physical defects in a property. Check out the URL attached, it should answer your question.
Q:washing machine question?
This is a drain hose water drain oiut of the machine from this hose.
Q:Geogrid width mean?
So width refers to the 1 meters to the value of 6 meters,
Q:Bathroom wall stickers finished, the wall is not reserved, the suite door can be installed
It is entirely possible. In recent years, aluminum doors (aluminum, aluminum), including the bathroom dedicated flat door, has now changed the door to stay in the past a considerable standard defects (but the wall must be vertical, the hole on both sides of some errors will not be affected) The Because there are now with the mouth of the aluminum door, both sides are available on both sides. Manufacturers will be that you measure the size of the processing, not worry. It is recommended that if the smaller bathroom (especially the distance between the door near the shower), the use of aluminum doors. Wooden door is not a long time. There is no problem with the set of doors (instructed to do the installation).
Q:how many 18x18 tiles do i need in an area of 198 sq. ft?
You are correct, but only if you don't have to cut any tiles and the area you're tiling is basically one big rectangle with nothing in it like counters or appliances. If you have to cut tiles, the general rule of thumb is to multiply by 125%. In your case, that would be 110 tiles -- and bear in mind that general rule doesn't always work.
Q:On the issue of compensation after the event of force majeure
The cleaning and repair costs of the works do not include scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Premium Related Products