Kwikstage System Scaffolding Gavanized on Sale CNBM

Ref Price:
Loading Port:
Payment Terms:
Min Order Qty:
50 m.t.
Supply Capability:
30000 m.t./month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

  • Quick Details of  Kwikstage System Scaffolding Gavanized on Sale 

  • Type:Fixed

  • Material:Steel

  • Construction Properties:Building Scaffold

  • Lapping Form:Full Scaffolding

  • Framework:Combined Scaffolding

  • Supporting Mode:Floor Type Scaffolding

  • Erection Position:External Scaffolding

  • Scaffolding Part Type:Scaffolding Frames

  • Move Method:Attached Lifting Scaffolding

  • Structural Style:Multi-Pole Scaffolding

  • Place of Origin:China (Mainland)

  • Surface:Painted or Hot Dipped Galvanized

  • Material.:Steel Q235 Q345


  • Kwikstage System Scaffolding	Gavanized on Sale CNBM

  • Kwikstage System Scaffolding	Gavanized on Sale CNBM

  • Kwikstage System Scaffolding	Gavanized on Sale CNBM

  • Descriptions of Kwikstage System Scaffolding Gavanized on Sale 

Kwikstage Scaffolding is a multi-purpose modular scaffold system which can be used for all forms of access and support structures in the building and construction industries, ship buliding, offshore construction and industrial maintennace.
Details of Metal kwikstage Scaffolding
1. Metal kwikstage scaffolding system is a new type of selflock scaffolding which is very popular in Oceanian,African construction.
2. Metal kwikstage scaffolding System is suitable for both inside concrete slab supporting and outside masonry Construction multi-purpose for construction.
3. Metal kwikstage scaffolding systemstandard is weld with a plate every 600mm which can join ledgers at 90 degree.
4. Metal kwikstage scaffolding system ledger is a horizontal member with a blade at each end for insertion into the standard plate.
5. kwikstage scaffolding system is quick to erect and strip which has completely replaced other scaffolding.

  • The Accessories of Kwikstage System Scaffolding Gavanized on Sale 


  • Material: steel tube φ48.3x3.25mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 17.02kg

  • Standard with normal length 2.5m, 14.32kg

  • Standard with normal length 2.0m, 11.64kg

  • Standard with normal length 1.5m, 8.94kg

  • Standard with normal length 1.0m, 6.26kg

  • Standard with normal length 0.5m, 3.56kg

  • Topper Standard, 1.72kg

  •  Material: steel tube φ48.3x4.0mm

  • Surface finish: hot dipped galvanized

  • Standard with normal length 3.0m, 19.48kg

  • Standard with normal length 2.5m, 16.38kg

  • Standard with normal length 2.0m, 13.28kg

  • Standard with normal length 1.5m, 10.18kg

  • Standard with normal length 1.0m, 7.07kg

  • Standard with normal length 0.5m, 3.97kg

  • Topper Standard, 1.93kg


  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Ledger of  3.00m, 13.00kg

  • Ledger of  2.44m, 10.67kg

  • Ledger of  2.39m, 10.60kg

  • Ledger of  1.95m, 8.87kg

  • Ledger of  1.83m, 8.29kg

  • Ledger of 1.78m, 8.20kg

  • Ledger of 1.47m, 6.97kg

  • Ledger of 1.22m, 5.98kg

  • Ledger of 1.05m, 5.31kg

  • Ledger of 0.71m, 3.97kg


  • Material: Made of steel 5# angle

  • Surface: hot dipped galvanized

  • Transom 2.39m, 17.71kg

  • Transom 1.78m, 13.60kg

  • Transom 1.27m, 10.19kg

  • Transom 1.22m, 9.85kg

  • Transom 1.05m, 8.70kg

  • Transom 0.813m, 7.12kg

  • Transom 0.71m, 6.42kg

  • Transom 0.60m, 5.75kg

  • Transom 0.51m, 5.08kg

  • L/A Transom 1.8m, 11.78kg

  • L/A Transom 1.2m, 9.56kg


  • Material: Made of steel tube φ48.3x3.25mm

  • Surface: hot dipped galvanized

  • Brace 3.6m, 15.33kg

  • Brace 3.2m, 14.00kg

  • Brace 2.7m, 12.25kg

  • Brace 2.0m, 9.33kg

  • Brace 1.6m, 7.99kg


  • Material: Made of 1.8mm thickness pre-gal.steel sheet

  • Surface: hot dipped galvanized

  • Size: 229mm(W)x 66mm(H)

  • Steel Plank 4.00m, 25.30kg

  • Steel Plank 3.00m, 18.90kg

  • Steel Plank 2.44m, 15.37kg

  • Steel Plank 2.00m, 12.52kg

  • Steel Plank 1.81m, 11.42kg

  • Steel Plank 1.25m, 8.20kg

  • Steel Plank 1.05m, 7.05kg

  • Steel Plank 0.736m, 5.25kg

  • FAQ

  • 1. What is considerations of Scaffolding installation?

  • There must be a fire protection measures and specialist care, safety personnel patrol inspection when electricity, gas welding work on the scaffold,

  • (1) scaffold frontage hurtful to prevent falling objects protection is required.

  • (2) During take down the scaffolding, fencing and warning signs should be set up on the ground, prohibit others person besides the operator

  • 2.What are the certifications of your products?

  • Certified by SGS, BS1139, EN74, Local Test Report.

  • 3. How long is the warranty period for your product?

  • Our products warranty is 2 years.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Specific specification for erection of civil scaffold
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;Dressing should be checked once a year. When the examination, should be in serious pipe corrosion in the selected three roots in each part of the serious corrosion of transverse sampling inspection, the outer surface of the steel pipe corrosion depth allowable deviation is less than 0.5mm, more than the provisions shall not be used.All new and old steel pipes must be painted with anti rust paint.
Q:How old do u have to be to get a Scaffolding piesrcing ?
Daddy didn't hug you a lot I take it. Are you going to get a tramp stamp too? Remember if you want to be a proper non-conformist you have to wear the uniform.
Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
The letter A on Hester's chest AND the letter A traced in the sky the night the governor died. The A on Hester's chest was, of course, a sybol of Adultry. But in the end, Hester chooses to wear it after she doesn't need to anymore, and most people take that to mean that the meaning of the symbol has changed, it became more something she overcame, it comes to stand for able. The letter A traced in the sky when the governor dies has two different meanings, the general public took it to mean that the governor was now in heaven as an angel, but Dimmesdale saw it as a symbol of his own adultry. The scaffold, as you said, which I think is a symbol of judgement and sin. Pearl is also a symbol - she is a literal symbol of the love affair, but also a symbol of innocence. For websites, just google scarlet letter - thats what I did and found lots of good information.
Q:How do you calculate the tonnage of scaffolds to use in a project?
tonnage is related to the volume of a certain material to be used in a certain project... so as to volume, tonnage is just the volume of the material to be used, given the specifiations in this case, scaffolds. consult your design and count the distribution of the scaffolds to be used.. average ratio of scaffolding tonnage is a ton per 10 square meter... also depends on the quantity of the project.
Q:Scaffold removal should comply with those requirements......
Demolition safety requirementsThe removal order should be 1 layers from the top down, at the same time no homework.2 remove the frame rods and connectors, springboard and other materials, should be used in rolling, prohibited throw down. The foot lever and remove the plate have been demolished, should be disposable.3 all the pieces of the wall should be removed from the scaffold layer by layer, it is strictly forbidden to take the whole or a few layers of the demolition of the wall and then dismantle the scaffolding; the demolition of the height difference should not be greater than two steps, such as the height difference is greater than the two step should be added to strengthen the wall.4 when the scaffolding removed to the lower part of the last long steel pipe height, according to the needs of the site in the appropriate position to take temporary support reinforcement, after the demolition of the wall.
Q:how do i get rid of the lumps on my ear because of my scaffolding?
A scaffold piercing should not be done with a single long bar. Go back to your piercer, or to another one and ask them to change it to two short bars, this will take the pressure off the tissue. Then you should buy some cotton cosmetic pads. Fill up a mug with boiling water from the kettle, soak a cotton pad in the water, squeeze out most of the water but not all of it, have it as hot as you can stand and hold it onto the lump. The lump is likely filled with lymph and this will encourage it to drain. Do this for about two weeks. If the lump still hasn't gone away either go back to the piercer or go see a doctor. To the person that said it shouldn't be done with the two shorter bars. Yes, I know many people who have had it done with one bar and have been fine, but I know plenty of people with horror stories. My ear could not cope with the one bar and wasn't draining properly even with regular sea salt soaks. One of my piercings has migrated slightly but I'm confident that my piercer will be able to put my long bar back in for me.
Q:How old do you have to be to get a scaffold piercing in washington?
I'm pretty sure it's 16-17 with parental permission. I suggest looking up some of the shops in your area and seeing what they say. There usually isn't a set rule for it, every shop is different. Like some shops may refuse seeing, say, a 14 year old, whereas another shop might do it with the parent's permission. Then of course, once you hit 18, you can do whatever you want, lol.
Q:Specification for construction steel pipe scaffolding and construction safety rules?
48mmX3.0mX6m is a national standard, but you can pay attention when you buy the shelf, generally said that they are 3 thick, but the pipe is under the difference, but the number of questions. There are 2.5 under the difference also has a difference of 111 layers of this standard is certainly enough, most of the South with a cover of 20 layers of it, they are basically the same price
Q:Can I recycle steel scaffolding tubes by encasing them in concrete to make a stronger beam.?
Like molitor said, if someone wants your bike bad enough, there's hardly any way to stop them. However, theives are like roaches; they don't want to be seen and scurry away when they think they're found out. Anything you do to slow them down works in your favor because it urges them to move on to easier pickings. Incidently, every system has its weakness. How good is your chain? Just because a chain is big doesn't mean it's strong. Even cheap Chinese bolt cutters will cut through a really big cheap chain, soft bolt or cheap padlock. Go for the high quality chains used by truckers to bind down loads or the type designed for overhead hoists. They may not be as big as others, but they are really tough and will give bolt cutters a run for their money. If you have bolts anywhere on the chain, use grade 8 and a good, hardened lock.
Q:Is it easier to build a disc scaffolding system than a bowl buckle scaffold?
It is widely used in bridge engineering, tunnel engineering, workshop, elevated water tower, power plant, oil refinery... Support design and special plant, is also applicable to overpass span scaffolding, storage shelves, chimney, water tower and indoor and outdoor decoration, large concert stage, the background frame, stands, balcony frame, stairs, other party system, stage setting, sports watch station project.

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range