Product Description:

The JZL and JZB series of pile frame developed by HUAXIA Group are mainly used in the construction of pile foundation with various operation methods, such as long spiral drilling, diesel piling hammer, SMW technology, and etc. With safe and beautiful structure, reliable and advanced control, and flexible operation, the product is very popular among customers.

JZL series of electric crawler pile frame developed by HUAXIA Group has independent intellectual property right, and it features complete electric control, high efficiency, good stability, high performance/price ratio, etc. Equipped with different working devices, the product can be used as different piling machinery such as long spiral drill, SMW machine, screw pile machine, and diesel hammer pile driver, which is real multifunctional and it can eliminate the needs for some of the imported equipment, which greatly reduces the cost.

     Type
     Performance  

JZB45

JZB60

JZL60

JZL90

JZL120

the walking mode              

walking-pedrail

dynamoelectric-pedrail

the support-mode of the stand-pole

three-point support

the rotating angle

360º

the standard height of the stand-pole(m)

21

30.5

30.5

36.5

36.5

the diameter of the stand-pole(mm)

Φ450

Φ529

Φ529

Φ630

Φ750

the allowed drawing force(kN)

240

400

400

640

750

the dimension of the total machine(m×m)

7.5×4

10×5.2

10×5.2

11.5×6

12.8×7.2

the ground contact length of the pedrail(m)

4

4.5

4.5

5

5

the width of the pedrail (mm)

600

800

800

800

800

the lean range of the stand-pole

front lean9  back lean5

the climbing capacity of the piling frame                  

4º

the oriented central distance of the stand-pole(mm)

330×Φ70

600×Φ102      330×Φ70

600×Φ102      330×Φ70

600×Φ102      330×Φ70

600×Φ102        330×Φ70

the vibration hammer

the size of the hammer

DZ45

DZ60

DZ60

DZ90

DZ120

the depth of the piling (m)

16

26

26

31

33

the screw drilling machine

the applicable model

ZKL600

ZKL800

ZKL800

ZKL800

ZKL1200

the depth of the drill(m)

≤16

≤26

≤26

≤31

≤31

the hoister

the charging speed(m/min)

25

25

25

31

32

the walking Mechanism

the walking speed(km/h)

0.1

0.25

0.25

0.25

0.25

the rotating power  (kw)

2×7.5

2×11

2×11

2×11

2×15

the rotating Mechanism

the rotating speed(r/min)

0.25

0.25

0.25

0.25

0.25

 the model of the electromotor

ZD31-4-3KW

ZD31-4-3KW

ZD31-4-3KW

ZD32-4-4.5KW

ZD32-4-4.5KW

the model of the reducer

XLED74-731-3

XLED85-731-3

XLED85-731-3

XLED95-731-4.5

XLED95-731-4.5

the adjusting structure of the lean-support

the speed of the adjustment line(m/min)

/

0.55

0.55

0.55

0.26

the model of the mechanism

/

XLD4-4-1/17

XLD4-4-1/17

XLD4-4-1/17

XLD4-4-1/35

the hydraulic system

oil pump

CBQ-F550-AFP

CBQ-F550-AFP

CBQ-F550-AFP

CBQ-F550-AFP

CBQ-F630-AFP

the rated pressure(MPa)

16

16

16

16

16

the model of the electromotor

Y180M-4-18.5KW

Y180M-4-18.5KW

Y180M-4-18.5KW

Y180M-4-18.5KW

Y180M-4-22KW

the ratio pressure of the ground (without the walking equipment)

the support-legs(MPa)

0.18

0.38

0.38

0.46

0.55

the pedrail rail(MPa)

0.05

0.07

0.07

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Several common pile foundations and pile driving techniques
At the bottom of the drill bit, when rotating, the soil layer becomes loose and becomes slag. It is suspended by mud and overflowed with mud. The well wall is protected by water head and mud. Reverse circulation rotary drilling: the mud flows into the borehole from the mud pool and is mixed with drilling slag. Suction role in vacuum pump, drill into a slag mixture into the mouth, through the drill pipe, and a slurry pump debris control raft excreted into the sedimentation tank cleaning, for further use. Because the bore diameter of drill pipe is much smaller than that of well bore, the water slurry in drill pipe is increased by 4~5 times faster than that of positive circle, and it is dominant in drilling hole of bridge drilling pile.
Q:What are the types of pile drivers?
Pile driver is composed of pile hammer, pile support and auxiliary equipment. The pile hammer is attached to two parallel vertical guide rods (commonly called Longmen) at the front of the pile support and hoisted with lifting hooks. The pile foundation is a steel structure tower with a windlass at the back of which is used to lift the pile and hammer. A guide frame consisting of two guide rods is used in front of the pile to control the direction of the pile driving so that the pile can be accurately penetrated into the formation in accordance with the design orientation. The basic technical parameters of a pile driver are impact weight, impact kinetic energy and impact frequency.
Q:How much is piling foundation for pile driving machine?
Piling machine prices from more than ten million to millions of, and the specific depends on how big you hit the pile, the specific configuration. Selection of models requires selection according to use.
Q:Want to buy a small pile driver, I do not know whether it is good track or wheeled good?
The track is better, the practicability is very wide, not stuck in the mud, and the good wylong machinery!
Q:How many meters can a small pile driver reach?
Hello! A square bar in Hunan wylong machinery is probably less than 20 no problem.
Q:Is the lever of the pile driver fast?
Huilong piling machine mechanical lock rod is the fastest concrete piling machine
Q:Code for installation and operation of pile drivers
4. Check whether the voltage of the power supply meets the requirements.5, according to the daily maintenance project to each department lubrication, maintenance.Five, pile driver in the work safety precautions:1, when the piling machine work, there should be special command. The conductor and operator should check each other's signals before they work. Work closely together.2, at the start of the bell signal or other applications, notify the staff around to leave.3, hammer and pile cap, pile cap and column (or pile) plane to pad, a connecting bolt should be tightened, and should always check whether there is loose.4. The starting of the pile driver should be adjusted from low gear to high speed.5, the pile driver in the work should be closely observed on the control panel current, voltage instructions. If abnormal sound or other abnormal conditions are found, stop inspection immediately.6, always check the temperature of the bearing and the bearing cover screws is loosening, should strictly examine the eccentric block coupling screw loosening, prevent the occurrence of accidents.7, sink, column (or pile) prohibited to stand around.8, piling machine with water, mud suction sink, should contact in advance with the relevant personnel, and take care of each other at work.9, long pipe column or pile and the installation of pile cap, the staff must wear safety belts.10 、 in the process of sinking, it is strictly prohibited to do mechanical maintenance work.Six after the stop of the piling machine, the power shall be cut off immediately, and the pile driver and motor shall be inspected and maintained.Seven, piling machine long-term disabled, should be kept in storage, the motor should be good moisture-proof protection, the control panel of the instrument, should be removed, storage, storage.
Q:Want to learn this kind of pile driver?.
I just open this, there is a certain risk, high wages, the site can not enter the work, it does not enter
Q:I've heard that the pile driver's pay is high. I want to study. Also please seniors pointing. Be deeply grateful!
There's one in the neighborhood. Can find other counterparts to learn, skilled in their own open.
Q:How to maintain the pile driver daily?
(4) dealing with leakage and damage of hydraulic system in time. (5) count the tools and scrub them clean. Fill in the equipment operation record, and make the writing clear, neat, complete and accurate.First level maintenance: (120~150 hours per work) on the basis of the completion of the maintenance of the whole work of each class.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range