High quality kwikstage scaffolding

Ref Price:
Loading Port:
China Main Port
Payment Terms:
Min Order Qty:
Supply Capability:

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details

Place of Origin:
Shandong China (Mainland)

Model Number:
surface treatment:

Packaging & Delivery

Packaging Detail:fasten by steel strap on pallet or in bundle
Delivery Detail:15-40 days


1. HDG Kwikstage scaffolding
2. 3.8MM and 4.0MM offered
3. AS1576 and ISO 9001-2000 approved.

Hot-dipped galvanized/HDG Kwikstage scaffolding

Standard are manufactured from Ø 48x3.8 mm HT tube. "V" Pressings are placed 500mm apart along the length of the standard.


Kwikstage Scaffolding




Q235,Q345 material is as per customer’s demand with high tensile strengh and yield stress.

Surface treatment

Hot Dip Galvanised,Painted,Powder coated


Kwikstage system


OEM service

Customer’s size is also available



Main market

Australia,America, South Asia,West Europe,etc


As the factory, we can offer competitive price and fast delivery

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Full house scaffolding height of more than the number of meters experts need to do?
The height of the erection of the frame is more than 24m, and only need to be designed and calculated according to the regulations.
Q:Buckle scaffolding problem, now used more or less
Is the rural infrastructure team? If it is because it is time-consuming, but very high security
Q:The bowl locking conditions of scaffolding, to determine what,
Don't need the bowl buckle is up on the line.
Q:A 60.0kg painter is on a uniform 25kg scaffold supported from above by ropes. There is a 4.0 kg pail of paint?
If both ends of the scaffold are supported by ropes then there is no chance of the plank rotating. OHS would still complain about the lack of handrails, the fact that the plank can swing without stabilization. Not to mention that ropes are unacceptable. They should be Nylon woven tape with fixed ends and at very least a one tonne rating. However that is not the thrust of your question. If the ropes are NOT at the very ends then by passing the rope on the end which has the 4 kg can of paint the whole plank may rotate about the pivot created by the rope. This will depend on where the two ropes are on the plank.
Q:Steel pipe scaffold scaffolding components which are composed of
Classification of steel pipe scaffoldThe domestic steel pipe scaffold material production with steel tubular scaffolding, bowl button steel scaffolding, socket type steel pipe scaffolding, scaffolding doors, and every kind of the scaffolding, hanging scaffold steel pipe scaffolding and other materials. Proceed from its material and structure, and can be roughly divided as follows:
Q:A 85 kg scaffold is 6.4 m long. It is hanging with two wires, one from each end. A 440 kg box sits 1.4 m from?
85kg. is 42.5kg each cable. 6.4/1.4 = 4.571:1 ratio. Add both sides. (440/5.571) x 4.571 = 361kg. Add the 42.5, = 403.52kg. 403.52 x 9.8 = 3,954.5N tension in left cable.
Q:How long for a scaffold piercing to heal?
Scaffold is a cartilage piercing and cartilage piercings need 1 full year to fully heal if treated properly for the whole healing period. They are nothing like other piercings, they are not easy to heal and they have their ups and downs while doing so. They can stay irritated, swollen and painful for long, bumps can be formed around them which also can get infected. All this goes away after proper care but can happen again days or even months later. So you need to be extra careful with it and follow your piercers after care instructions by the book if you want to keep yourself and the piercing healthy. You need to do sea salt soaks 2 times a day for the whole healing period and never stop. How to do : Warm water (8oz) + non iodized salt (1/4 teaspoon) mixed in a cup. Soak the piercing in for 10 minutes, 2 times a day. Use a q-tip to clean around the piercing thoroughly, rinse with water and pat it dry with a paper towel. Until the piercing is fully healed don't : Touch it, twist the jewelry, play with it, sleep on it, change the jewelry or take it out but only touch it with freshly washed hands to clean it. Do not twist the jewelry. If a piercing is freshly cleaned it can easily slide in and out with the slightest push. Some kids mistakenly think that if you don't twist the jewelry it will somehow get stuck to the skin and never move again. This is a bad myth and can never happen. If you keep twisting the jewelry the crusties that are naturally created and attacked to the jewelry will keep scratching the inside part of the piercing ( the actual wound ) causing trauma again and again, irritating the piercing and dealing the healing process. A new piercing , especially cartilage ones need cleaning, time to heal and avoid touching.
Q:I want to get and industrial/scaffold, but...?
The barbell is very light and hollow, so I doubt that'll happen. Perhaps in rare cases where the piercing has already damaged the cartilage somehow. Cartilage is strong enough to hold up an industrial barbell. Your uncle might be trying to scare you if he doesn't approve of you getting an industrial, but don't ignore him completely since he's just trying to watch out for you.
Q:Wheel buckle scaffolding rental price
1, according to the lease. Wheel buckle scaffolding per ton 3.5~4 yuan / ton / day.2 by meter lease. Convert down and not much difference, and trouble.
Q:is there any a well known name for scaffolding?
Affix okorder.com

1. Manufacturer Overview

Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range