High quality formwork wing nut ,butterfly wing nuts

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Quick Details





product name:
High quality brass formwork wing nut ,butterfly wing nuts
material:
aiuminum ,brass.stainless steel ,iron.ect
finish:
plated with nickel ,zinc coated,
size:
M2-M10(or as your request
packing:
PE Bag and Carton,or as your request.
min order:
1000pcs


supply ability:
100000piece/pieces per day


Packaging & Delivery

Packaging Detail:Package: 2000pcs/plastic bag,20000pcs/carton ,then on pallet (according to customer's request and the size of production .
Delivery Detail:7-10 days after order confirmation


Product Description:

Product

Name

High quality brass formwork wing nut ,butterfly wing nuts

Standard



Raw material

1.Stainless Steel: SS201, SS303, SS304, SS316, SS410, SS420

2.Steel:C45(K1045), C46(K1046),C20
3.Brass:C36000 ( C26800), C37700 ( HPb59), C38500( HPb58
4.Bronze: C51000, C52100, C54400, etc
5.Iron: 1213, 12L14,1215
6.Aluminum: Al6061, Al6063 etc
7.Carbon steel: C1006,C1010,C1018,C1022,C1035K,C1045
8.Alloy steel: SCM435,10B21

Surface Treatment

Zn- Plated,Ni-plated,Passivated,Tin-plated,Sandblast and Anodize,Chromate,

Polish,Electro Painting,Black Anodize,Plain,Chrome plated,Hot Deep Galvanize(H. D. G. )

Size

M2-M50

Rohs

Yes


Package

Plastic bag and carton ,or based on customer's requirement

Delivery time

7-10days after the order confirmation

Supply Ability

100000 Piece/Pieces per Day or depend on the quantity

Port


Used for

1.inductrial,machinery.

2.Electronic field

Advantages

1.Competitive Price

2.Best quality
3.Prompt delivery

Features

1.Good anti-corrosion ability

2.Good after-sale service.


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:]How does Pearl react when Dimmesdale calls Hester and herself to mount the scaffold with him?
The answer can be found in the novel The Scarlet Letter by Nathaniel Hawthorne. Read that and you'll have the answer!
Q:21M high full scaffold erection scheme
dismantle4.1 the accurate preparation before dismantling the scaffold shall comply with the following requirements:1 should be a comprehensive inspection of the scaffold fastener connection, even wall pieces, support system is in line with the requirements of the structure;
Q:How Long Will My Scaffolding/Industrial Piercing Take To Stop Being Sore?
No, actually, it takes 8-12 MONTHS to heal, by your 8-12 weeks I'm going to guess you went to the mall? Well, first of all, the gun uses blunt force trauma and a dull stud to rip a hole through your ear, plus that 'cleaning solution' is crap and will delay healing. There's a good chance it shattered your cartilage, so you could be in pain for months like I was (2 months of extreme almost constant pain, another 3 of dull aches with extreme pain when ever something brushed it and a final 6 of pain just when something touched it). So, yeah...get ready for the long haul.
Q:In the construction of steel pipe scaffolding steel pipe and steel stamping fastener usage ratio is how much?
Generally 200 tons of steel pipe with fasteners, and fasteners are generally divided into three kinds: right angle fasteners, connecting fasteners, rotating fasteners
Q:What are the requirements for the construction of the scaffold eye in the building?
The surface of the steel pipe shall be smooth and free of cracks, scars, delamination, dislocation, hard bending, burrs, indentation and deep scratches.The outer diameter of steel pipe 48mm allowable deviation is 0.5mm; the thickness of the wall 3.5mm allowable deviation of.0.5mm; steel pipe surface cutting oblique deviation 1.7mm;
Q:Cantilever scaffold technical disclosure
Vertical bar, vertical horizontal bar (large cross bar) of steel pipe length of 3-6 meters, horizontal horizontal bar (small cross bar) steel pipe length of 1.1~1.3 meters, the lateral bracing steel pipe length of 3-4 meters.
Q:Can you believe a man survived a 60 foot fall from a scaffold?
With God all things are possible.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
Eee, by gum, Petey.....all ye hed te do wuz GOOGLE scaffolding on york minster, in'it? And y'eed a learned they's FIXING it reckon on it tekkin 'em ten year or moore!
Q:Key points for safety of portal scaffolding
4, grade six and above six winds and rain, snow, fog should stop the scaffolding erection, demolition and construction operations.5, during the construction of the following shall not dismantle the rod: 1) cross support, horizontal frame; 2) even wall pieces; 3) reinforcement rods: such as scissors, horizontal reinforcement bar, sweeping pole, sealing rod, etc.;
Q:How to set up the temporary structure of the external structure of the balcony on the two structure
Main projectCast - in - place main beam, board, column, stair - prefabricated board is installed - brick wall - door window hole is reserved, water and electricity Guan Xianyu is buried.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range