High Medium Voltage Drive 4.16KV 6000KW VFD

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
10000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

 

Energy-saving Solutions for Enterprise
1、Program Overview
◆Saving energy achieves 10% -70%
◆The enterprises do not need to pay for expense of equipment manufacture and installation.
◆Enterprises only need to pay the saving electricity expense to our company according to the actual quantity of energy saving after the equipments put into operation.
◆According thousands of the projects’ implementation experiences, such projects recover the investments in three or four years. (Equipment service life is 15 years)。
◆Our company will no longer charge the saving electricity expense after recovering the investment.

The significance of the program:
1)、Concentrate on solving problems of energy conservation, make enterprises’ energy-saving work reach new level and take their social responsibility。
2)、Avoid the enterprises reactive power fine of low power factor caused by electric energy using (according to Ministry of Electric Power and Water Resources, State Price Control Bureau establish the " measures of power factor adjustment expense ").
3)、Avoid the high-energy consumption enterprises are implemented differential prices because of the changes of national power regulation.
4)、For the standard-conforming large-scale (saved energy equal 10 thousand tons standard coal or more) energy-saving technological transformation projects, China will reward the enterprises for energy saving which based on the "Financial Incentives Interim Measure for Energy-saving Technological Transformations" established by Ministry of Finance, the National Development and Reform Commission.( Amount of 200 yuan / ton of standard coal).
5)、Equipments recovery period is generally 3-4 years, each period payment equal to the amount of current energy-saving benefits, and equipments service life are 15 years, so enterprises will gain huge energy-saving benefits.


2、Implementation Process
Energy Audit
Energy Saving Program Design
Construction Design
Equipments Manufacture
Construction and installation
Maintenance and Repair
Energy Monitoring and Efficiency Insurance
Recovery of Program Investment


3、Program Features
High energy-saving efficiency
The project saving rate is generally 10% -30%, highest is up to 70%.
Clients Zero Investment
All works of design, audit, manufacturing, construction, monitoring are handled by RXPE, clients does not require investment.
Energy-saving Guarantee
RXPE promises the amount of energy saving, ensuring that clients’ cost reduction immediately.
Short Investment Recovery Period
The investment recovery period is short, average period is 3-4 years.
Low Risk
Customers do not input large sums of money also can enjoy professional energy-saving products, technologies and services, and the investment risk is very low.
Improvement of Cash Flow
Customers with the support of RXPE approve energy-saving program to improve cash flow, invest the limited funds into other priority investment areas.
Enhance competitiveness through implementing energy conservation, improving energy-saving efficiency, reducing energy costs and enhancing the quality of environment, establish green corporate image and enhance market competiveness.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How to learn the inverter debugging and design parameters
Personally think it is relatively simple, and now the inverter has been more intelligent, and some simple applications, and even do not need to set the parameters.
Q:The laptop's power adapter can be used on a desktop computer
Desktop machine is called DIY it ~ is the assembly machine inside the motherboard graphics card hard drive memory What is the need for power supply every power to have a different interface
Q:Master Hello a machine requires 500 speed matching 6-pole motor frequency converter transferred to about 28HZ
6-pole motor synchronous speed of 1000 r / min, the actual motor speed is lower than the number, the actual speed is required to 500 r / min, then the motor and passive pulley diameter ratio of about 1: 1.6 or so, and then specific With the inverter to speed up to achieve the purpose, please refer to.
Q:Siemens g120 inverter torque limit what is the meaning
For example, you have 100kg of power, but you can send the power and you lift the weight of the object, if the object weight of 10kg, you can only use 10kg of power.
Q:A 4-pole AC motor into a 2-pole AC motor, the motor is controlled by the inverter, to make the maximum speed of the 2-pole motor and the original 4-pole
If it is normal V / F control, then do not need to modify too many parameters to limit the frequency limit of 50%
Q:Can the notebook's power adapter be mixed?
In general, the same brand of notebook power adapter, as long as the same wattage, the same interface, can be mixed with. But do not recommend different brands or different wattage power adapter mix. Because the output wattage is different, there may be damage to the notebook, such as voltage instability and so on.
Q:Short-term short-circuit converter DC link positive and negative will damage the inverter?
This short circuit may not necessarily line, the inverter fan has three, one is no speed line, two are pulse, three are switching signal (this is very little, I only encountered several),
Q:In the case of the inverter, why can not the normal operation after removing the gearbox? The motor is 4 pole.
If there is a load, it may be less than the torque. So it can not run.
Q:How does the spindle drive system of the inverter realize the positive and negative control of the main pole?
Communication can reach a longer and more stable, generally better of the city 485
Q:What is the base blockade in the drive?
Base blockade is to deal with ul or ce such a special application of security agencies means that when the parking limit action after the base blockade even if the program can not malfunction, relative to the emergency stop circuit more harsh they will directly disconnect the power

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range