• High ElasticTthick Acrylic Waterproof Coating System 1
  • High ElasticTthick Acrylic Waterproof Coating System 2
High ElasticTthick Acrylic Waterproof Coating

High ElasticTthick Acrylic Waterproof Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 kg
Supply Capability:
300000 kg/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of  Acrylic Coating Description:

Acrylic coating are based on the traditional acrylic resin, joined the Chinese and foreign type recognized the longevity of chlorosulfonated polyethylene rubber, weather resistance, fillers, additives and so on the advanced technology of preparation of single component from the dry weather resistance anticorrosive coatings.High elastic thick qualitative acrylic waterproof coating is a kind of waterproof performance, high technical content of the new building waterproof coating, it is import multiple copolymer modified acrylic ester base makings, add a variety of imported additives, filling material, the scientific process of it is strictly prohibited a high-performance one-component waterproof coating.

2.Main Features of Acrylic Coating:

Good thermal dimensional stability, low temperature flexibility, water resistance and crack resistance performance.

Coating high elasticity, high strength, high cohesive force

Acid and alkali resistance, high temperature resistant, resistant to ultraviolet aging

Stick relay strong, simple construction

3.Acrylic Coating Specification:

viscosity

S≥ 20

The drying time

h≤ 24

The impact strength

kg·cm≥ 50

Attach a force

≤ 1
Flexibility mm1

4.Acylic Coating Images:

 High ElasticTthick Acrylic Waterproof Coating

Q:Villa roof leakage what general reasons, what materials to remedy
??Note: Before the waterproofing and draining construction, the roof must be dry, because the roof of the water does not evaporate, the new waterproof layer will rise, the waterproof effect immediately invalid. Therefore, rainy days should not be construction, to wait until the sun will dry the water before construction.
Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Second, the chisel in addition to the wall structure to the wall structure for waterproof construction, you can use the material coating, membrane and infiltration of crystallization, the quality is different.
Q:Can Henkel have water against him?
Can ah ~ watered effect on the discount friends are high with the general are good, powder + pulp! Do not need to add water
Q:Find the construction steps for waterproof coatings
2, waterproof layer construction sequence and methods (1) base surface treatment and acceptance of qualified, and now Yin, Yang angle and construction joints and other special parts brushing waterproof coating layer, strengthen the layer 1 mm, strengthen the layer after brushing, immediately paste fiberglass cloth or 30 ~ 40g / ㎡ polyester cloth reinforcement layer, is strictly prohibited to strengthen the surface layer and then paste the reinforcement layer material. (2) to strengthen the layer of hard work, began to brush a large waterproof layer, waterproof layer using multi-channel (3 to 5) brushing, brushing the upper and lower coating should be perpendicular to each other. When the surface of the coating is completely cured (not sticky hands) before the next curtain coating construction. (3) polyurethane coating waterproofing layer after the completion of the experience of acceptance, the timely application of the waterproof layer of the protective layer, the plane protective layer with 7 cm thick fine stone ㎝, in the pouring of fine stone before the need to cover the waterproof layer A layer of 350 # paper tire linoleum insulation layer. Facade waterproof layer (such as anti-beam facade) with a thick 6 mm polyethylene foam protection (expansion ratio of not more than 25 times).
Q:Roof for the insulation, Master roof, using two waterproof construction program
Third, security measures 1, firmly establish the "safety first, prevention first" safety production policy. Before the operation, the site management personnel must be to the operation team to carry out security technology to the end, and actively carry out pre-class security activities, security personnel check, supervise. 2, the roof around the poles outside the scaffolding (protective railings), roof construction is strictly prohibited removal. 3, roof construction, debris and other materials is strictly prohibited from the roof directly down throwing. 4, storage of coils and adhesives warehouse or site to prohibit the fireworks, for the use of fire, there must be fire prevention measures, and should set a certain number of fire extinguishers and sand bags. 5, oil drums should be flat, not two carrying, in the transport process, pay attention to balance, the spirit to focus, to prevent accidental fall caused harm. 6, transported to the roof of the material, should be scattered on average, with the use of transport, not concentrated stacking. 7, the use of torch, you should clear the surrounding flammable items, must be away from the base of oil, is strictly prohibited in the brush base oil area using the torch. Torch petrol should not be over full, cheer should not be too much, in the fire site must be equipped with fire equipment.
Q:Oriental rain rain waterproof how to
2, Oriental rain rain waterproof coating application If the above content can not accurately explain the East rain rain waterproof paint is good, then continue to look at the East Rainbow waterproof coating since the application of this Examples, I believe that most consumers can not say. Oriental Yuhong waterproof coating with its excellent product performance is applied to the Great Hall of the People, China Millennium Monument, the Three Gorges Hydropower Station, Beijing Metro, Capital Airport, Beijing Wuhuan, Sixth Ring, Beijing-Shanghai high-speed, directly under the central grain depot, China Central Television, National Aquatics Center (Water Cube), National ...
Q:What are the key points and contents of the quality control of waterproof material?
4, high-polymer modified asphalt waterproofing membrane: check the counterfeit effective and simple method is to cut the film wrapped down and then placed in the refrigerator freezer placed 3 hours after the removal, gently forced to break will be broken, and the national standard Require material low temperature flexibility to reach -20 ℃.
Q:Waterproof mortar expensive or dry mortar expensive
Cationic neoprene latex is a polymer modified polymer anti-corrosion system. By the introduction of imported epoxy resin modified latex by adding the domestic neoprene emulsion and polyacrylate, synthetic rubber, various emulsifiers, modified latex and other components of the polymer latex.
Q:What is the difference between finished mortar and cement mortar?
Finished mortar is good, easy to mix, is conducive to the improvement of masonry and work efficiency; cement sand waterproof, suitable for wall paste wall, wall light
Q:How to do waterproof bathroom, construction process is what
Second, the construction process: 1, grass-roots treatment: grass-roots surface must be smooth and smooth, there must be no pit phenomenon may not loose, trachoma or hole exists. If the above phenomenon should be smooth and smooth after the construction, the surface must be dry, there must be a pipe at the root of the head must be wiped into a circular arc, the pipe must be strong. 2, brushing the primary treatment agent, the "Liang wall" waterproof primer at the end of uniform mixing, and then use a long brush or rubber brush scraper, scratching the waterproof material, even brush to the grass-roots level, brushing Can not be stacked and exposed white bottom, brushing the amount of each time to 0.4kg / square meters is appropriate, the first time after the full dry before brushing the second time. 点击图标下载 App

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products