High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

Ref Price:
Loading Port:
China main port
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
100 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The topless tower crane reduce the dismounting requirements, lower weight, low mounting height, dismount each mast at a time in the air, saves on labor cost, providing excellent safety features and efficient work. It is also suitable for crossover work with other cranes without the tower cap and pull rod, the safety will be increased when there is crossover work. Our Cranes are suitable for the special requirement involving height, such as nearby airport, tunnel, workshop, and construction sites with high-tension cables. Also suitable for the construction site that has crane boom requirements, it can be used as an internal climbing crane in a high-rise buildings, irregular roofing or small areas. Convenient for dismounting in restricted construction site, dismounting each crane boom at a time manually. The topless tower crane also contains steel structure for crane booms causing long life usage and high safety standard. The crane boom is perfectly applicability, for high-usage, the design of the topless tower crane boom is easy for realizing the serialization and standardization.

Product Features:

·         Widened equipment capacity and working scope.

·         Suitable for the groups of tower cross framework.

·         Noise relief stability with and combination amplitude range.

·         Can sustain height adjustment for occasional exceptional height construction procedures.

·         Large weight capacity, effectively solving high steel structure construction lifting capacity requirements.

 

Independent height (m)

40

Max height with attachment (m)

121

Working range can be adjusted(m) 

40/50

Min working range(m) 

2.5

Max lifting capacity(t)

6

Tip load @ 48m(t)

1.3

Hoist mechanism

Falls

2

4

Lifting capacity(t)

1.3

-

3

3

-

6

Speed(m/min)

9

38

80

4.5

19

38

Motor

YZTD225L2-4/8 /32-24/24/5.4KW     

Trolleying mechanism

Speed(m/min)

20/40

Motor

YZTDE132S-4 /8-3.3/2.2KW  

Slewing mechanism

Speed(r/min)

0.6

Motor

YZR132M2-6-3.7KW

Climbing speed (m/min)

0.5

Counterweight (t)

11

Mast section size (L×W×H)m

1.6×1.6×2.5m

Working temperature

-40-+60°C

Total power (KW)

34

Power supply requirement (KVA)

180KVA for generator

Cable type (<30m from site power source to lower electric box of tower crane)

50mm² (3+2, 5 cores)

Startup voltage & current

380V×95%=361V       285A

Rated working voltage & current

380V                   65A

 

 

Product Specifications:

Minimum Order Quantity:

1 unit

Unit:

unit

Loading Port:

China main port

Supply Ability:

100 unit/month

Payment Terms:

TT OR LC

Package:

unit

 

 

Product Images:

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price


High Efficiency QTZ40 Tower Crane for Sale,Tower Crane Price

FAQ:

Q1: What is shipment procedure?

A1: You can put two sets of wheel loaders in one 40HQ container. The spare parts are packed with boxes. Also can be delivery within 20 days.

 

Q2: How is your service?

A2: With our company we hold our client’s needs as top property. We have first rate professional technology and provide excellent after-sales services.

 

Q3: What is your after sales service?

A3: We provide Preventative Maintenance and After Sales Service. We strongly feel the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer a one year warranty to our customers. .

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Who is responsible for the construction of the pile foundation of the tower crane?
1, the pile foundation of the pile and tower crane foundation pile is not the same item, cannot pile foundation pile and tower crane foundation pile together to talk about.2, you did not say who is tower crane?. Who is responsible for the tower crane installation, including tower crane foundation construction.3, but, in fact, in most cases, the mechanical leasing company only provides technical requirements, providing tower crane foundation section. Piling and foundation concrete are the responsibility of the contractor.4, if the contract does not have a definite agreement on the construction of the tower crane foundation, the general contractor shall be responsible for the cost of piling the tower crane foundation. The piling Team can be the construction unit of the pile foundation, and also can be found by the general contractor.5, in the future tower crane foundation construction program should be clear about this matter, avoid controversy.These are only personal opinions.
Q:What is Kung Fu's the art of the crane stance all about?
Kung Fu Crane Stance
Q:How are 100 ft. construction cranes assembled?
u okorder.com
Q:What are some ideas to build a crane out of Popsicle sticks?
My son and I used to do a couple of things with them. We would make masks. Get some of the cheap paper plates, glue the sticks to them - cut out and decorate. You can make animals, people, it is a lot of fun. The log cabin is a great idea, but a little hard for that age. So we made our log cabins on construction paper, Glue the stick on there in the shape of a house. Good times!
Q:What company makes a good engine crane I can order online?
Dont know if you have a Harbor Freight store near you, but i bought an engine crane from them this past spring , 2 ton for $100. Go to the website and find a store by you, or maybe order one on line. good luck..........
Q:list of people confirmed dead from crane accident nyc?
i imagine they are injuries. regrettably those who artwork for the city authorities - a minimum of in lengthy island - are extremely incompetent and corrupt. What makes you say that No inspector ought to deliberately ignore a risky contemporary challenge ? That 's precisely what the inspector of the first crane crumple did. Oops, my mistake. He did not verify the cranes in any respect. And all those those who died lately in structure by utilising being blown off by utilising wind from large heights??!! I have in no way heard something like that in the previous. Who supplies those people the needed facilitates?? How educated are those people? the position is their union?
Q:Collapsing Cranes..?
These are dangerous peices of equipment, they endure high stress and are at times pushed to the physical limits. I have on occassion worked with and under them and always had a lot of respect and always felt safer when away from them. Construction cranes in particular are more dangerous because they are forever changing in height,position, amount and type of load. Cranes in permanent installations are ususlly carrying same or similar loads. Construction sites are hazardous due to many factors but just about everything on site gets handled by the crane at one time or another. Inspection,inspection, and re-inspection with concurrent correction/adjustment are the only preventative measure availble beside the assurance of competency of the operator. There are plenty of laws about them already but this is not to say new ones might be justified as new hazards become apparent. Most terrorists are too dumb or lazy to get involved with cranes--why bother when so many easy targets are out there !!!!!!!!
Q:What is the standard weight of a tower crane for 1.6*1.6*3 and 1.6*1.6*5m? Kg?
The standard weight of tower cranes for 1.6*1.6*3 and 1.6*1.6*5m is 500KG
Q:How to change the mechanical property unit of crane (tower crane)?
Measures for the record and registration of construction hoisting machineryArticle 1 These measures are formulated in accordance with the provisions on the supervision and administration of the safety of construction cranes' machinery (Order No. 166th of the Ministry of construction) in order to strengthen the management of the record and registration of construction cranes.The construction and registration of the hoisting machinery as mentioned in the present Measures shall include the registration of the lifting machinery, the installation (disassembly), the notification and the use of the registration of the second.Third construction departments of the people's governments at or above the county level may use the computer information management system to handle the registration and registration of construction hoisting machinery, and establish a database.The construction administrative department of the local people's government at or above the county level shall provide the registration and registration and inquiry service of the building hoisting machinery within its administrative area.Article fourth rental, installation and use of units shall be submitted in accordance with the provisions of the lifting of construction machinery registration information, and the authenticity of the information provided by the responsible.The construction administrative department of the local people's government at or above the county level shall establish a system for the examination and registration of the hoisting machinery.Fifth construction machinery rental units or purchase building lifting units (hereinafter referred to as the "property units") in the construction machinery rental for the first time or before the installation, should be registered at the competent construction Department of the local people's governments at or above the county level to the unit of business (hereinafter referred to as the "equipment registration authority") for the record.
Q:What are the working mechanisms and safety devices of tower cranes?
About the structure: Tower cranes are all metal structures, so far there is no wood. About institutions: tower crane working mechanisms are: winding lifting mechanism; luffing mechanism; slewing mechanism; cart moving mechanism; lifting mechanism. A safety device: four limit: height limit, amplitude limit, slewing limit, travel limit; three insurance: luffing rope insurance, car insurance broken shaft, the hook to prevent falling insurance; two limit: torque limiter, weight limiter on these roughly.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range