• HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom System 1
  • HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom System 2
  • HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom System 3
HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom

HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
1
Supply Capability:
50 /month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing
  • HGY Series Hydraulic Stationary Self-climbing Concrete Placing Boom


  • Quick Details

  • Condition: New

  • Power Type: Electric

  • Place of Origin: Shandong, China (Mainland)

  • Model Number: HGY

  • Power(W): 15000w

  • Weight: 5 tons

  • Dimension(L*W*H): 8m*2.2m*1.8m

  • Certification: CE&ISO

  • Warranty: 12 months

  • After-sales Service Provided: Engineers available to service machinery overseas

  • Packaging & Delivery

    Packaging Details:1.Wire cables are used for fastening the machine on the trailer or inside the container. 2.Cork wood are placed in front or behind the machine to protect it. 3.Plastic film is covered on the machine as a rain-roof. 4.Reinforcement packaging
    Delivery Detail:15-25 working days after receiving the down payment.

    Specifications

    1. CE, ISO9001 
    2. Factory 
    3. Long service life 
    4. Right price 

    HGY Series Concrete Placing Boom 

  • 1.It can be placed in any suitable places required without being fixed.

    2.Compact structure, light weight and can be lifted as a whole by a crane.

    3.With excellent maneuverability, it can meet the requirements for concrete 

    placement on different job-sites, and is ideal for concrete pumping and placing.

    4.Easy operation, reliable safety and economical purchase.

     

    Description:

     

     

     

    In order to extend the placing range of concrete pump and enhance the mechanization of pumping construction, our company have researched and developed the new products-a series of concrete distributor

     

     

     

    HG-12, HG-15 and HG-17 HG-18 HG21 HG24 (the number is the placing radius)

     

     

     

    The concrete distributor is the assorted equipment of concrete pump.

     

     

     

    Its application extends the delivery range of concrete, efficiently solves the problem of wall painting and plays an important role in enhancing construction efficiency and reducing the labor intensity.

     

     

     

    This series of concrete distributor have reasonable design and reliable structure.

     

  • The placing structure adopts 360° rotary arm support.

  •  

     

     

    The machine is operated by hands and can rotate flexibly.

     

     

     

    The tower is of a proper height so you can change the placing position freely only by pulling the robe easily.

     

     

     

    So it is highly efficient, reliable and economic.

     

     

     


Q:What is the daily routine of the concrete mixing station?
Your question is fun, you ask is daily work refers to a person or the institution will have job or responsibility, and concrete mixing plant is short for a single search or mixing unit, I put the question to you "what's the concrete mixing station management personnel daily work including".
Q:What is the special work of the concrete mixing station
One of the features of the high-performance concrete mixer line is the low water ratio. In order to ensure its liquidity, it must be mixed with an efficient water reducer. Therefore, it is necessary to select cement that is suitable for low water cement ratio. One is the composition of fineness and particles, and the other is the early hydrogenation after the addition of water.
Q:How much concrete is produced by the js1000 type of the concrete mixing station
The JS1000 is only the mainframe model and depends on the power of the whole machine and the size of the batching machine. The JS1000 has HZS50, 60, 75, which is in theory, 50, 60 and 75 per hour. The actual operation is certainly less, about 80%
Q:How much concrete is produced per hour by HZS180 concrete mixer?
One, 180 square of concrete per hour, 180 of HZS180 is its output per hour. The concept of concrete mixing stations: Concrete mixing station is mainly composed of mixing console, materials weighing system, material conveying system, material storage system and control system of large system and other ancillary facilities. Because building aggregate measurement compared with standing aggregate metering, reduced the four of the intermediate links, and the vertical blanking metering, saved measuring time, thus greatly improving the production efficiency, under the condition of the same model, mixing building production efficiency than mixing plant production efficiency by a third. Such as: HLS90 floor of production efficiency and production efficiency of HZS120 stand HLS120 floor of the production efficiency, production efficiency is equivalent to HZS180 stand HLS180 floor of the production efficiency is equivalent to the productivity of HZS240 station.
Q:The main components of a mixing station
Feeding system: aggregate bucket, aggregate weighing hopper, flat belt machine, inclined belt conveyor. Mixing system: the main machine is a double-deckshaft mixer, reducer, cement weighing hopper, water and additive weighing hopper. Cement supply system: cement warehouse, screw conveyor, air compressor, screw electronic. Automatic water supply system: water tank, pump, pipe. Electrical operating system: computer console, electric control cabinet, operation room. Operation control system: microcomputer control or manual control.
Q:What are the supporting facilities for the concrete mixing stations?
Concrete mixing equipment, concrete transport equipment, laboratory equipment, forklift, overpound equipment, ground pump, car pump etc.
Q:How long does it take to build a concrete mixer station?
The main idea is that the goods are completely incomplete, and the crane, the manpower, the mechanical tools. If everything is in place, then the pure installation will be two weeks to a month. Of course, also see you buy what type of product, container type is compared commonly faster, smaller and faster, under 3000 type slightly faster, 4000 and 5000 slowly
Q:What are the facilities of the concrete mixing station
One. Stir the host The mixing machine is divided into strong mixing and self-falling stirring. The powerful mixer is the mainstream in the domestic and foreign mixers, it can stir the liquid, semi-dry hard and hard and so on. The main mixing liquid concrete of the self-falling mixer is very rarely used in the mixing station. Two. Material transport system The material transport consists of three parts. Aggregate conveying; There are two ways of conveyance and belt conveyance. The advantage of hopper promotion is that the area is small and the structure is simple. The advantage of belt transport is that the transport is large, efficient and low. The belt conveyor mainly applies to the mixing stations that have aggregate storage, thereby increasing the productivity of the mixing stations. Powder conveying; The powder used in concrete is mainly cement, fly ash and mineral powder. The most commonly used powder conveyors are conveyors of screw conveyors, and the large mixing buildings are carried by pneumatic conveyer and scraper. The advantages of screw transport are simple structure, low cost and reliable use. Liquid transport mainly refers to water and liquid admixtures, which are delivered separately by water pumps.
Q:What are the advantages of HZS series of concrete mixing stations
Concrete mixing plant is composed of ingredients, mixing and electric control system components made sets of fully automatic concrete mixing equipment, and equipped with a separate manual control, automatic fall compensation, sand moisture content of compensation, can automatically accomplish the tank production. The theory of productivity 75 cubic meters/hour, discharging height is 3.8 meters, the storage hopper volume of 8 cubic * 3 warehouse or 4 warehouse, supporting the host is forced JS1500 type and double shaft mixer
Q:How much water does a concrete mixer use every day?
Dosage, depending on your project and mixing station construction factory cleaning every day, because now the country's love the strict monitoring of environmental protection, to maintain clean our factory, is a lot of water to clean the work area. So the client had better prepare the pool to ensure the normal operation of the project.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords