• Galvanized Gypsum Drywall Metal Studs 73/75 Ceiling Profile System 1
  • Galvanized Gypsum Drywall Metal Studs 73/75 Ceiling Profile System 2
  • Galvanized Gypsum Drywall Metal Studs 73/75 Ceiling Profile System 3
Galvanized Gypsum Drywall Metal Studs 73/75 Ceiling Profile

Galvanized Gypsum Drywall Metal Studs 73/75 Ceiling Profile

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
3000 pc
Supply Capability:
10000 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Interior partition wall or veneering wall of hotels, theaters, emporiums, factories, 

office, house, airplane-terminal buildings, bus stations, waiting lounge, theaters, emporiums, factories, 

office, house, airplane-terminal buildings, bus stations, waiting lounge

etc.

Product Applications:

1.Indoor ceiling of industrial and resident building.

2.Partition of industrial and resident building.

3.The partition of the bathroom and other wet condition building.

4.Indoor partition as base board of the decoration for operation room,clean room of hospital or laboratory .

5.The fireproof board of the air passage.

6.Furniture or furniture's accessories.

Product Advantages:

1.Light,good strength,cauterization resistance and water resistance;

2.Matching magnesium fire-proof board,gypsum board,and many other wall and ceiling board;

3.Moisture -proof,shock-resistance,high-effecient,environmentally-friendly and so on;

4.Easy and fast for installation,time-saving;

5.prompt delivery,high quality,competitive price and complete sets of style;

6.We can supply you the products based on your specific requirements;

Main Product Features:

metal drywall system galvanized steel profile c channel

Our drywall studs are made of galvanized steel sheet with good rust-proof function. The thickness is strictly according to the international demand.

Product Specifications:

Drywall System Track Drywall System Track Drywall System Track

FAQ:

1:.How can I get your prompt quotation?

A: we can give you reply with quotation quickly if you kindly send the inquiry with  specification.

 2.What's the MOQ of the order?
No limit, we can offer the best suggestions and solutions according to your condition.

 3. Which payment terms can you accept?
T/T,LC,Western Union,moneygram are available for us.

 4. After an order is placed, when to deliver?
15-25days after confirming the order.

5. Does your company accept customization?
We accept OEM service.

Images:

Q:Construction schedule of light steel keel ceiling
Looking for two people, a carpenter, an oiler. Measuring the ball line half a day; punching the boom to half a day; the Lord, the keel half a day; adjust the reinforced keel for half a day; amp; plaster board half a day; caulking treatment for at least two days (generally three times the caulk, the first pass putty must be dry The top layer of paint and lighting installation at least one and a half (according to three times the paint); so calculated at least 7.5 days time, not because of live more, mainly between the process must be Waiting, that is, process control work hours. Do not listen to their blind flick, probably they are not construction workers, I can also finish for you 3 days, but the quality can not guarantee you
Q:For example, the original requirement is 0.9 to 1.0 But actually made a 0.7, Is there any harm?
Ceiling in the wood keel spacing: 1, light steel keel: keel for the edge of the dragon, the lamp slot position with keel or woodworking board production, there are wood production office to brush fire paint, keel at least 50, spacing 30cm is appropriate, hanging spacing 60-80cm is appropriate, gypsum Between the board and the board to be reserved for 5-8 mm gap, gypsum board self-tapping screws 1-2mm and do anti-embroidered treatment, to be smooth and solid, shaped to be smooth lines; 2, keel: keel at least 3 × 4 or more, spacing 30cm is appropriate, hanging spacing 60-80cm is appropriate, hanging bar is strictly prohibited direct use of wood wedge nail to the top, brush tight fire paint until the keel color can not see the dragon A layer of full-legged rice eucalyptus core after nine on the gypsum board, gypsum board and the board between the people to set aside 5-8mm gap, gypsum board self-tapping screws 1-2mm and do anti-embroidered treatment, to do To the formation of solid, shaped to do smooth lines; 3, aluminum buckle board: strict requirements level, light steel keel bayonet to be aligned, keel spacing of 50 or less, hanging spacing 60-80 cm is appropriate, the board when the hand to light, so as not to press the board, And the contact with the tile is not tight to use the sealant to play tight; 4, aluminum-plastic plate: keel at least 3 × 4 or more, spacing 30 cm is appropriate, hanging spacing 60-80cm is appropriate, brush tight fire paint, keel on a layer of full-legged rice eucalyptus core 9% Adhesive paste aluminum-plastic plate, aluminum-plastic plate between the board to be reserved for 3-4mm gap, prepared to fill other colors play the effect of sub-grid, to be smooth and solid, shaped to do smooth lines, folding The angle can not be broken.
Q:Light steel keel ceiling cracks how to deal with
Another situation: the top of the hole inside the ventilation holes (into the wind), or bad joints, caused by a simple gypsum board joints cracks. At this point, peel off the zipper, open the seam (gap width in the 2-5mm). With capped gypsum blockade, until the basic dry and then paste the white latex adhesive tape (Note: must be in the zipper and then brush again white latex glue), until the white latex thoroughly dry and then putty, polished, Paint.
Q:Light steel keel ceiling cad chart
There is a special light steel keel construction of the chart to sell, you can buy a set, only tens of dollars, inside the various forms of light steel keel ceiling, partitions have detailed construction techniques and regulatory requirements
Q:What is the general ceiling of indoor ceiling?
Now a lot of aluminum buckle board, very cheap, the effect is also good
Q:Home ceiling with green steel skeleton or wooden frame
Of course it is steel dragon skeleton!
Q:Ceiling light steel keel 50/60 in 60 on behalf of what
60 represents the width of the main and vice keel,
Q:Light steel keel gypsum board modeling ceiling
According to specifications can be divided into: D60 series, D50 series, D38 series, D25 series.
Q:Please give valid certificate, thank you! The
Light steel keel and ceiling keel to have a test report of the general once a year.
Q:Do you need to leave a gap between the ceiling and the wall? If you need to stay much in line with design requirements? Need to do those deals
Leaving 5 mm of the seam in the paste gypsum line on OK

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords