FUXIANG Tower Cranes TC50103A(Top-Slewing)

Ref Price:
Loading Port:
Dalian
Payment Terms:
TT OR LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

The construction hoist product  produced by Fangyuan has achieved internationally advanced level in terms of industrial design, control and the drive performance, as well as the operation safety and comfortableness. And Fangyuan is also making efforts to keep improving the product, as what the construction hoist lifts is not only people and material, but also a kind of social responsibility and service concept…
The new generation SC series of construction hoists adopt modular structure, ergonomic design and advanced manufacturing technology, thus the adaptability and reliability of the product is greatly improved, e.g. the max. lifting height can reach 300 meters. The product adopts multiple patented technologies, reaches advanced level in China, and the market share in domestic market is increasing year by year. The product has also been exported to overseas countries like Russia, Turkmenstan, Vietnam, etc. winning the confidence of customers of both home and abroad

 

1. The cage drive system is equipped with buffering device, so the cage moves more stable.
2. The ergonomically designed cage interior improves comfortableness.
3. The unique structural design has applied for patent.
4. The typical technologies ensure the malposition difference of the guide rail.
5. The excellent parts in the industry ensures reliable quality of the machine.
6. Precise assembly and accurate drive.
7. Professional solutions for special projects.
8. The complete safety devices ensures reliable control system.
 

 

item

unit

parameter

max.hoist load

2 rate

t

8

4 rate

16

min.working radius

m

3.2

max.working radius

m

70

65

60

55

Rated hoist moment

2 rate

kN.m

2350

2400

2450

2500

4 rate

2100

2150

2200

2250

Hoist height

free-standing

48

Acnhorging

2 rate

183

4rate

93

Hoist speed

2 rate

m/min

0~63

0~31.5

4 rate

0~31.5

0~15.7

hoist mechinism power

KW

55

slewing speed

r/min

0~0.7

trolley speed

m/min

0~65

top-rising speed

m/min

55

outline dimension

 

height of the total tower crane

m

61.4

end of the boom to slewing center

71.7 (66.7  61.7  56.7)

Balance boom to slewing center

19.2

weight

 

structure weight (free-standign)

t

71.63

balance weight

27.325  23  19.6

working temperature

-20~+40

basic working wind pressure

Pa

250

basic non- working wind pressure

Pa

1100

power supply parameter

50Hz

~380V±10%

 

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Emergency treatment of interrupted electricity during lifting of tower crane
When the power supply fails, you should first remove the things that are stuck in the gear!
Q:83 camaro crane cam 305 v 8 4brrl edelbrock carb problem.?
Yes. You need a pre-computer distributor with a vacuum advance on it. The quadrajet had a TPS sensor on it. The Edelbrock doesn't. I would think it would idle though. Sounds like you have a vacuum leak or it's not adjusted right.
Q:inventor of junk yard electromagnetic crane?
Who Invented The Electromagnet
Q:dose any one no of any over head crane schools?
A few places to start the bureau of labor statistics has information on moving trades. You will need certification although requirements vary. The National Commission for the certification of Crane operators lists different types of operators and requirements for certification. States have their own laws about certification and requirements you can check it out, in some states certification is not required yet. I've included a link to the laws for Minnesota. There are a number of companies it would probably help if you are currently working in Construction and for a company that might help pay for the training or learn on the job. I don't know what state your in but there are a number of companies that do training you can do a quick search with Crane operator training. One other resource is the local Division of DET Division of Employment and Training for your state they can help you research your options and vocational counseling. Good Luck
Q:how to become a mobile or tower crane operator?
You have to be able to do simple trig to figure what your crane is capable of. You will have to become a member of the crane workers union. Someone may have to die to make a space for you. You may have to take jobs that are just fork lift qualified, if you are lucky, you might find work at seaports unloading cargo ships.You may have to work your way up through the ranks as a wrecking ball operator. The very lucky will make 50-60K +. The really good ones will make more only after many years.
Q:Cranes or storks?
Depends on where you live ? Stick to Ornamental Pheasants or Ducks,Storks and Cranes,need to be penned in at night because you will have to pinion them to prevent them flying. Try some Golden Pheasants for a try ,Lady Amherst are becoming a rare commodity and are quite expensive,if you have Foxes and Mink,then no matter what you get you will have problems these two predators.
Q:Any idea what patterned reality is (technique used in Crane's The Red Badge of Courage)?
The okorder.com
Q:Can anyone help me interpret the poem Fear by Hart Crane? or North Labrador?
Analysing Poetry Close reading may seem like a foreign and unfamiliar approach to analyzing a piece of text. However, it can often yield insights that will help you to create a unique paper developed from your own interpretation of the text. To analyze the work effectively, it is useful to concentrate on specific components of literature used to build and reveal the themes in the work. This process will help you explain how a passage relates to central themes in the text allowing you to reach an intelligent and creative thesis for a literary analysis. First, choose a passage (or a series of passages) that intrigues you.
Q:How do you jump a crane? I know you jack it up but how is that done?
I have no idea what you mean by jump a crane? What type of crane? Truck mounted, overhead, pedestal?
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
Fast Crane = A unload x /hour Slow Crane = B unload y /hour A + B = 8 hours x /hour + y /hour = 8 hours (average rate) average rate = (x + y) / 2 so 8 hours = (x + y) / 2 and x + y = 16 since the slow crane is 12 hours longer, x must be 2 hours, since they will both take 2 hours and the slower crane will take 2 hours plus 12 hours equalling 14 hours. The rate of crane A is 2 hours to unload and the rate of crane B is 14 hours to unload. The average rate for both to unload is 8 hours. There were certain assumptions made to solve this puzzle and it is not clear how they actually operate on the ship while unloading. ~~ The most practical way to unload the ship is *NOT* to use the slower crane since it takes longer for them to work combined, than for the faster crane to work alone !! A tricky but fun question !! :-b

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range