Full Electric Walkie Scissor Aerial Work Platform(hydraulic motor)-JCPT0807DC

Ref Price:
Loading Port:
China Main Port
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
-

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:


ModelUnitJCPT0807DC
Rated capacitykg230
Extend platform Rated capacitykg113
Max number of people2
Max working heightmm7800
Max platform heightmm5800
Overall lengthmm1860
Overall length (with outrigger)mm1840
Overall widthmm760
Over height(rail unfold)mm2160
Overall height(rail fold)mm1840
Working platform sizemm1670×740
Platform extend sizemm900×740
Ground clearance(stowed)mm90
Wheelbasemm1380
Min turing radius(inside)mm0
Min turing radius(outside)mm1640
Drive motorV/kw2/0.5
Lift motorV/kw24/3
Drive speed(stowed)km/h6
Drive speed(lifting)km/h0.8
Raising/Falling speedsec31/37
BatteryV/Ah4×6/210

Charger

V/A24/30
Maximum gradeability%25
Max angle2-3
Tyremm305×100
NWkg1240


Standard Configuration
-Proportional controller
-Automatic pot hole protection system
-4x2 drive
-Emergency stop button
-Emergency descending button
-Horn
-Working chronometer
-Transport standard forklift hole
-Extended platform
-Charge protection
-Self-lock door
-Total excursion
-Tracelessness tyre
-Self-actuating brake system
-Oil pipe explosion protection system
-Fault diagnosis system
-Tilt protection
-Motor reset protect
-Buzzer
-Folded rail
-Strut bar for safe overhaul

Optional Configuration
-AC power source connected to platform
-Working lamp
-Rotary strobe light
-Overweight sensor
-Air scoop connected with platform


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How does the elevator repair
For elevator maintenance the simplest way is to find the manufacturer directly to repair, after all, is their production, repair is good, also save time, our factory is the jinan day machinery, bought two or three years, rarely out of order, maintenance in time, high efficiency, under the baidu search them, you ask yourself, see how.
Q:Can the stepping motor drive the hydraulic platform?
The hydraulic platform is driven by an oil cylinder, and the motor drive is a completely different way through mechanical means (screw, chain, gear, rack, etc.). In addition to mechanical means, depending on the power size, the step motor usually means that the equivalent power is not much, the maximum is a few hundred watts. The hydraulic platform is generally heavy, so it's unlikely. Or do you use a step motor to drive the hydraulic pump? It can, but also to consider the power problem, said earlier, smaller power stepping motor, if the original motor is a few kilowatts, certainly not.
Q:Which mobile shear fork lift is better
Mobile shear fork lift There are four major systems, The mechanical structure system,
Q:The hydraulic cylinder with hydraulic platform is changed to whether the cylinder is feasible
The pressure cylinder is very close, the hydraulic cylinder is not suitable to change to the cylinder, the change is equal to make a new cylinder.
Q:The purpose of the rail elevator
Guide lifter is a kind of hydraulic elevating shear machinery and equipment. Used for secondary and tertiary industrial workshop, restaurant, wine shop floor between the transport of goods. The minimum height from 150-150 mm, optimal it is suitable for the workplace can't excavation pit. And do not need the upper lifting point, in the form of diversification (single column and double column, the four pillars). Equipment running smoothly, guide of elevator guide rail is commonly channel steel, H steel, square tube welding, operation is simple, reliable and convenient transport of goods economy.
Q:How to use the ball screw platform?
Second, heyman screw can see lu, platform settled on first use, carefully to see if there are any more abnormal hydraulic parts, electrical appliances, layout, to ensure that no more than about geomagnetic held before commissioning, no-load again after 3 ~ 5 times a load test.
Q:Seven tons of lift should be fitted with the straight screw and motor
A lift platform system, we are doing, you should tell your system speed, accuracy, and so on parameters, can calculate the motor power, speed, lead, lead screw diameter, guide rail, can communicate in detail
Q:How to improve the oil leakage line
The reason of oil leakage is complicated, mainly due to the quality of the hydraulic components, vibration, corrosion, differential pressure, pipeline connection, use of improper maintenance. Elevator oil leak inside leakage and leakage. A small amount of oil is inevitable, because of the nature of the hydraulic drive. Spill in excess of the prescribed index of the phenomenon is due to leakage, generally can immediately perceptible, mainly are now the pressure drops, rapid speed of change has been ground or surface of product oil, machine equipment need often fill oil to return to the height of the aerial work platform before. Once the leak is due to be shut down, the acute operation will only take the system out and damage the engine parts.
Q:What should the chain's main elevator be aware of when installing the chain
The installation of the power system traction equipment interface must be done. According to our experience, part of the accident was caused by the failure of some manufacturing enterprises to do the right thing with the traction power and the host mesa.
Q:How does the table in the middle of the tatami mat go up and down
Need to buy the metal platform of suitable height, use screw to install small table board. Steps are as follows: Installation: desktop lock desktop board with screws on the top of the lifting platform (such as manual lifting platform should be first in the middle of the desktop is boring, the size of the hole to match the rocker tank size).

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range