Formwork System Scaffolding System Formwork Steel low price

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
300 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Formwork System Scaffolding System Formwork Steel low price

Product pictures:

Formwork System Scaffolding System Formwork Steel low price


Formwork System Scaffolding System Formwork Steel low price

Formwork System Scaffolding System Formwork Steel low price

Product description:

Name:

RingLock Scaffold System

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Good loading capacity

* Easy to assemble and dismantle

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System:

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:

We can produce all kinds of forged and pressed couplers, including British type couplers, German type couplers, Italian type couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

(3)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop;RASTO clamp and so on.

FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

We own professional manufacturers with powerful producing capacity.

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:is there a significance to hester's viewing the crowd from atop the scaffold in the book the scarlet letter?
yes - she is looking down on them after years of them looking down on her because of her adultery
Q:I am looking to buy storage tank building tools like bull pins, u-bars,keyplates,and scaffold someone HELP?
Check with Home Depot or Lowes. you can usually find what you need there.
Q:I need to know if these company is hiring scaffold builders Mobly Inc OKorder.com?
This company is hiring that company for those who buys them for that thing, from now and then!!
Q:In the scarlet letter why is hester taken to the scaffold in the market-place?
This is where she is punished. People taunt her while she is standing up there. It is to make her feel shame.
Q:A 531 N window washer is standing on a scaffold supported by a vertical rope at each end. The scaffold weighs 3?
(332 N)×(3.5 m)/2 + (531 N)×(1.36 m) = (3.5 m)×R R = 372.3 N < - - - - - - - - -tension in the right rope (531 N) + (332 N) = (372.3 N) + L L = 490.7 N < - - - - - - - - - tension in the left rope
Q:Two window washers, Bob and Joe, are on a 3.00 m long, 380 N scaffold supported by two cables attached to its?
Oh, Ashley, you can't fit more than an intro in the what would you like to ask. More room in details.
Q:What is the vertical transport of construction and the high increase in fees
The vertical transportation fee is a special item in the construction industry
Q:How long do you have to wait before you can take a scaffolding piercing out for short periods of time?
They take 9-12 months to heal and an unhealed piercing should never be removed. Yes, you would experience issues. It would likely close or shrink in size or if it somehow didn't then you could easily cause infection, irritation, prolonged healing, hypertrophic scarring...nothing you should be willing to risk. 6 weeks is far from being long enough.
Q:How to connect the frame column bars in several ways? What should you watch out for?
Hello, "farmers from the building, the most important is the quality and safety
Q:Can the fifteen typhoon blow up the three - storey house?
Therefore, when the typhoon comes, do not in the dilapidated housing, sheds, temporary buildings, scaffolding, poles, trees, billboards, towers and other places prone to casualties shelter Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Therefore, before the advent of the typhoon to be fixed flower pots, air conditioning outdoor unit, awning, construction site sporadic items to ensure safety Typhoon may cause water and electricity and other phenomena, to do a good job in daily life of the reserve work Strong winds will blow off high-altitude items, easily lead to smashing smashed the accident Such as: balcony, roof pots, air conditioning outdoor units, rain Peng, solar water heaters, roof debris, construction site sporadic items, tools, building materials and other vulnerable to wind caused by casualties Therefore, the majority of the masses in a timely manner to fix a good pot and other items, construction companies to sort out the construction equipment, tools, sporadic materials to ensure safety

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range