Formwork Parts Scaffolding System Formwork System Formwork Parts

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
5 m.t
Supply Capability:
1000 m.t/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Formwork Parts Scaffolding System Formwork System Formwork Parts


Product pictures:

Formwork Parts Scaffolding System Formwork System Formwork Parts


Formwork Parts Scaffolding System Formwork System Formwork Parts

Formwork Parts Scaffolding System Formwork System Formwork Parts

Product description:

Name:

RingLock Scaffold System

Category:

Scaffolding System

Material:

Steel (Q235/Q345)

Size:

D48*3.25mm, etc

Surface:

Electro Galvanized, Hot   Dipped Galvanized, Painted, Powder Coated

Component: 

Standard, Ledger, Diagonal   Brace, Bracket, Base Jack, U Head Jack, Etc.

Application:

Slab Support, Staircase,   Stage Plateforms, Bridge Support, Mobile Tower, etc.

Manufacturer:

OEM is Available

Items or goods can be   manufactured according to your standards.

Advantage

* Stable and durable thanks to its structual design & automatic welding quality

* Excellent quality for formwork & scaffolding with wide choices

Other scaffolding & formwork products:

(1)   Scaffolding System:

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

(2)   Scaffolding Frame & Accessories:

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

(3)   Scaffolding Couplers/Clamps:

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers;

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.

FAQ

Why Us?

We are one of the largest construction materials suppliers in China.

Excellent products with competitive prices.

Efficient  services in pre and after sale.

Full energy with affluent experience team.

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What is the exterior scaffolding erection specification? What do you need to pay attention to?
Presumably everyone on the external scaffolding erected norms of the word feel strange, do not know what it is about what is it? Now look at: what is the external walls of scaffolding erection specification: There are several to note: in their daily lives which are needed
Q:I have a concrete transport arm pump, would like to ask which building materials companies need to use, can be resident
Of course, you can make your own soil to do a radius of 4 meters small cloth machine
Q:A window washer drops a brush from a scaffold on a tall office building. What is the speed of the falling brush?
A) Speed of falling brush = at =9.8 x 3.39 = 33.22m/sec B) Vertical distance Y = Vo x t - 0.5 x at^2 0 = Vo x 2 - 0.5 x 9.8 x 4 Initial Velocity = Vo = 9.8m/sec^2 Vertical height = Vo^2/2g = 9.8^2/2 x 9.8 = 4.9m
Q:a scaffold that weighs 300n supports two painters. one of the painters weighs 250n and the other weighs 300n.?
Total weight is 300+250+300 = 850 weight on other scale is 850–400 = 450 newtons
Q:Scaffold piercing care tips? Sleeping on it? Cleaning it Anything useful you've discovered besides the obvious?
Number one: Never clean with peroxide, alcohol or neosporin. -Get yourself a nice antibacterial soap without lotions, dyes or scents. (Try Satin) As for sleeping, my suggestion is to bend your arm under your head in a triangle fashion and to keep your ear in the little hole so it won't be bothered much. Sea salt soaks! They can really change the healing process right around. They're easy to do and well worth the time. Good luck!
Q:Investment to do a steel pipe fastener leasing company, generally need to invest how much money? What conditions and procedures are required? Please help.
Market analysis: 1 GB steel fastener leasing to play a good quality of the banner, do not and non-standard cast iron pieces to be confused, to a single package site, in the normal rental costs increased by about 30%, the interests of both sides are not affected, get Is a safe, non-controversial and harmonious development; 2 Some very powerful large construction group since the purchase of national standard fasteners, a large amount of steel fasteners more advantages to sell them Because we are the production of European steel plate fastener manufacturers, so you can only give a little advice on the fastener, if you want to inquiry can call Ouke company's phone: 0317-, our website is wwwhb-ok com, welcome to visit
Q:How to do a good job of typhoon during the mass transfer mobilization work
strong winds may blow down buildings, high-altitude facilities, easily lead to casualties
Q:What is the bamboo board for the scaffolding of the building?
Scaffolding, also known as scaffolding, in the scaffolding, the operating frame laying, to facilitate workers walking in the top, transport materials and construction operations of a temporary turnover of the use of building materials
Q:The name of the laws and regulations relating to the building, at least 100, The The
Huamin co-land management month 29 promulgated 3 Commercial Housing Sales Management Office issued on April 4 4
Q:2 painters are standing on a 5.0 mg long scaffold. Each painter weighs 833 N.?
Summing torques at the left cable T2*5-833*2-285*2.5-833*4.5=0 T2=1225 N Summing torques at the right cable T1*5-833*3-285*2.5-833*.5=0 T1=726 N Check 833*2+285-(1225+726)=0 It checks j

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range