• CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT System 1
  • CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT System 2
  • CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT System 3
  • CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT System 4
CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT

CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT or LC
Min Order Qty:
1 unit
Supply Capability:
10 unit/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing


1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

 CMAX HIGH QUALITY TOWER CRANE TC5013 -TOPKIT

 

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

 

 

Q:Ever since a few weeks ago, these retarded giant mosquitos thingys keep on flying into my house from somewhere and they always come into my office and bother me, so im wondering what month they come and what month they leave?
Crane flies tend to live in wooded areas and open fields, but they can live nearly anywhere, including snowy northern climates and desert lands. In order for their eggs to hatch and larvae to grow into adults, they require either water or damp, decaying material in which to lay their eggs, depending on the species. Crane fly larvae and pupae can be found in damp sod or compost piles, or under the decomposing leaves on the banks of rivers, streams, ponds or lakes. Crane fly larvae and pupae feed on decomposing material, grass and the roots of many plants. This makes them a beneficial insect, as they assist in the cycle of decomposition. Once they emerge in late winter or early spring as adults, after maturing over the winter, their primary purpose is to mate and lay eggs.
Q:How do you erect a crane. surely you would need a crane to make a crane.?
Modern building cranes (the tower cranes that you see on most building sites) have the ability built in to jack themselves up as the building grows. Jacks raise the crane at ground level, allowing a new section to be inserted at the bottom of the tower. But the crane arrives at the building site in pieces, and a small truck-mounted or crawling crane may in fact be required to assemble and erect the tower crane - so, except for the smallest cranes that could be put up by hand, you are correct.
Q:I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
First, okorder /. This means that at 5 m the capacity is 600 tonnes. Double the radius, half the capacity. A crane located at the foot of the pyramid, will be at 115.2 m from the center. At that radius, the crane could only lift 26 tonnes, so this crane could not lift the greatest stones weighing 80 tonnes. Being the boom only 100m it could'nt even reach the center.
Q:On Batman Begins what is Dr. Crane's full name?
who cares are u bout 6 or something???
Q:What is the allowable range of vertical deviation for tower cranes?
Independent height 4/1000, attachment height 2/1000 under top wall!
Q:The fight sequence on the construction crane between 007 and villain Molakka was mezmorizing. But would the laws of gravity allow for it to happen in real life? I mean, acrobats perform similar stunts, but could the average super spy and villain?
no. no fight scene in any movie is realistic.
Q:I need a web site for crane documentation. What I need, is a site, where from I can get, when needed, hydraulic and electric schematics for all kind of cranes (crane trucks, bridge cranes, etc)Thank you,
try okorder /
Q:How are those really tall construction cranes assembled ???
I saw one erected once - it was fascinating. They started out with a big mobile crane - then they added piece by piece until they finished it.
Q:I was watching Batman Begins and at the end Gorden says that he hasn't caught Crane. Since the villians in the next Batman movie are going to be two-face and the joker will Crane make a reapperance in the thrid movie (if there is one)?
The Joker became employed by making use of the particularly some crime businesses to kill the Batman. He used his criminal genius to concoct an tricky plan to stress Batman to bare his identity. this could harm Batman's benefit of anonymity, making it much less complicated to kill him. because it became out, The Joker didn't wish money, he wanted to run Gotham city's criminal underground, Batman and Harvey Dent have been interior the way. interior the Batman comics, the Joker is Batman's arch enemy. Homicidal, and outstanding, he's often finding for a thank you to kill Batman. regardless of if it skill killing innocents or destroying Gotham city interior the technique. For all those at a loss for words approximately Joker robbing banks: He merely robbed the banks that the criminals had their money in. by making use of doing this, he became particular to get their interest. while Gordon and his team cracked down on 'the mobs'' materials, Joker became there to lend guidance by making use of removing all those that have been inflicting the subject concerns. especially Harvey Dent, and Batman, yet in addition the Commissioner, and the decide allowing Dent to prosecute them. continuously a pair of steps previous to maximum, he knew by making use of soliciting for 0.5 of 'the mob's' money, they had be vulnerable sufficient to overhaul. the explanation Batman completes Joker is as a results of the fact Batman is the only guy or woman clever sufficient to make certain by using his plans. for this reason, it quite is mostly a project to defeat Batman, yet not inevitably kill him.
Q:S930 M50 (M125/75) level jib tower crane about how much money
Do you want to see is that, generally is Sishijiwan

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords