FANGYUAN TOWER CRANE TC5010

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
10 unit/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:



1. The lifting boom and balance boom adopt cantilever boom structure, which reduces the hoisting modular and makes it more safe, convenient and flexible to install and uninstall, and reduces the requirements for hoisting equipment and the site.
2. Multiple special mounting brackets are available, which saves the installation time and ensures safe and quality installation.
3. The lifting boom adopts cantilever boom structure and variable cross-section materials, featuring more reasonable structural stress and long service life; and it is easier to make different combination of boom length.  
4. It adopts standard sections (for models of over 12t) of piece assembly structure, split structure stock, and assembled platform, which meet the transport requirements for standard container.
5. The extra-long boom is designed with a rope-supporting trolley, and the speed of which is 1/2 of that of the luffing trolley, which can achieve the most optimum rope-supporting effect. The structure has applied for national patent.
6. The lifting mechanism adopts speed regulation by frequency control or by eddy current brake series resistance, featuring good lifting performance; The slewing system adopts frequency control by torque electric motor or by coil winding type electric motor with hydraulic coupler, featuring smooth operation and small slewing impact.
7. All kinds of safety devices are reliable and easy to adjust; both the safety monitoring control system and traditional safety system are available, the double system ensures safety operation of the tower crane; the hydraulic system adopts low/medium pressure design, featuring higher safety and reliability.

Tower Cranes(Top-Slewing)    

Model

Max.lifting capacity & work range

Max.work range & lifting capacity

Max.independent lifting height(m)

Torque

Lifting capacity at max.boom length

Lifting capacity(t)

Work range(m)

Work range(m)

Lifting capacity(t)

QTZ31.5

TC3508

3

11.59

35

0.8

29

TC3807

3

11.15

38

0.7

29

QTZ40

TC4208

4

11.6

42

0.8

29

TC4708

4

13.4

47

0.8

29

QTZ50

TC4610

5

11.9

46

1

36

TC5010

5

13.1

50

1

36

QTZ63

TC5013

6

13.72

50

1.3

40

TC5013A

6

13.72

50

1.3

40

TC5510

6

13.17

55

1

40

TC5510A

6

13.17

55

1

40

QTZ80

TC5512

8

12.68

55

1.2

45

QTZ100

TC6013

8

14.45

60

1.3

45

QTZ125

TC6014A

10

12.4

60

1.4

50

QTZ160

TC6020

10

15.2

60

2

52.6

QTZ250

TC7030

12

20.4

70

3

45

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:How is a Crane built upwards and how is it dismanteled ?
A tower crane is usually assembled by a telescopic crane of smaller lifting capacity but greater height and in the case of tower cranes that have risen while constructing very tall skyscrapers, a smaller crane (or derrick) will sometimes be lifted to the roof of the completed tower to dismantle the tower crane afterwards. A self-assembling tower crane lifts itself off the ground using jacks, allowing the next section of the tower to be inserted at ground level.
Q:How many meters of cranes should be in accordance with the anemometer?
The state specifies the installation of wind speed meters for outdoor cranes!AskMore than how many meters need to be installed, or as long as it's outdoor, it needs installationChasing the answerThe provisions of the People's Republic of China national standard GB 6067.1--2010:9.6.1.1 high speed cranes for outdoor work shall be equipped with an anemometer. The anemometer shall be installed on the windward side of the crane.9.6.1.2 high speed cranes for outdoor work should be equipped with an air speed alarm that displays instantaneous wind speed, and when the wind speed is greater than the working wind speed setting value, the alarm signal should be sent out.
Q:dose any one no of any over head crane schools?
A few places to start the bureau of labor statistics has information on moving trades. You will need certification although requirements vary. The National Commission for the certification of Crane operators lists different types of operators and requirements for certification. States have their own laws about certification and requirements you can check it out, in some states certification is not required yet. I've included a link to the laws for Minnesota. There are a number of companies it would probably help if you are currently working in Construction and for a company that might help pay for the training or learn on the job. I don't know what state your in but there are a number of companies that do training you can do a quick search with Crane operator training. One other resource is the local Division of DET Division of Employment and Training for your state they can help you research your options and vocational counseling. Good Luck
Q:What animal Kung Fu style is the most popular in the world - Dragon, Snake, Crane, Mantis, Tiger or some other?
Probably T'ai Chi, perhaps Wing Chun. Not many systems were named after animals, and in fact, most weren't. Several systems have animal sub-sets to their skills, however (Hung Gar, Hsing-I, etc).
Q:What is the calibration value of a tower crane?
Do you mean the calibration value of crane lifting moment? That should be the product of the maximum magnitude of the tower crane and the corresponding maximum lifting load.
Q:What are the special operators of tower cranes?
The tower has special operations personnel of heavy machinery refers to the construction site in the tower crane division signal cable, installation and disassembly, the driver, and the demolition work of gondola installation, may cause serious harm to themselves, others and the surrounding facilities operations personnel.
Q:Are tower crane operators secured by anything when they climb to the control room thing? What is the average salary for an operator?
1. No need to be secured, the ladder inside the crane tower has many platforms. It's actually a heap of ladders and platforms not a single ladder. Usually the ladder is surrounded by a cage that would catch you if you fell. Once at the top there are handrails everywhere, you just make your way to the cabin. 2. Average here in Australia is about 1500 to 2000 non union and 2500 to 3000 union. 3. Not worried climbing but if there is a thunderstorm and you are in the cabin it can be scary 4. You shouldn't climb the crane when it's rainy as its all steel it is slippery if wet but sometimes it cannot be helped. You should wear non slip boots too
Q:Is tower crane a tower crane?
Yes, the tower crane is commonly known as the "standard" in the industry. It is called tower crane.
Q:I'm looking for a quick-release crane hook. ?
We manufacture a QUICK RELEASE FOR CRANE look at www.craneequipment.ca
Q:What is cost of 2000 ft of crane runways?
Preformed okorder.com/ We Build Cranes To Meet Your Needs And Your Budget. Free Quote. Offers a free quote. click link .

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range