• Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 1
  • Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 2
  • Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 3
  • Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 4
  • Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 5
  • Factory Supply 50m Boom Length Cheap Construction Building Tower Crane System 6
Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 set
Supply Capability:
100 set/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Structure of Tower Crane

1) TC5013A tower crane is one of the key product of cnbm company, which have competitive price and excellent quality, suitable for all kinds of construction project and can work under all kinds of work condition.

 

2) This kind of crane adopts standard section hydraulic lifting and connecting, and can decide the crane height according to the actual height of the building, and at the same time the lifting capacity will not be affected; The max. attached height can reach 140m.

 

3) It has high working speed, good speed-adjusting performance, steady operation and high efficiency. Three-speed motor and mono-speed ratio decelerator are applied in the lifting struction, which enables heavy load low speed and light load high speed.

  

4) The crane has complete set of safety devices, which can guarantee the safe and high efficienct operation of the equipment. The machine is equipped with lifting height limiter, dolly range-change limiter, moment limiter, weight limiter, circumgyrating limiter, etc.

 

5)The machine has scientific layout and beautiful appearance. The operator's room is set independently on one side, with good vision field. It creates a good working environment for the operator.


Main Features of Tower Crane

1, boom relief Angle is big, greatly widened the equipment capacity and scope of work.

2, suitable for the group of tower cross homework.

3, boom stability is good, combination amplitude range.

4, suitable for height have special requirements occasions construction.

5, lifting capacity big, effectively solve the high steel structure construction team crane big lifting capacity requirements.

Tower Crane Images

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane



Tower crane Specifiction

Factory Supply 50m Boom Length Cheap Construction Building Tower Crane

FAQ of Tower Crane

1.How about the shipment?

You can put 2 sets of of wheel loaders in one 40HQ container. The spare parts are packed with boxes.

The delivery time is 20 days.

 

2. What about your service?

We have our factory, we can meet customers needs as soon as possible.

We have first rate professional technology and provide good after-sales service.

 

3.After Sales Service

We offer the Preventative Maintenance and After Sales Service. For we strongly feels about the importance of supporting our customers and the product solutions we provide. Consequently we offer comprehensive maintenance options to prevent equipment issues before they become problems. Also we offer one year guarantee period.  


About CNBM


CNBM is the largest state owned company under central government of China that deals with building materials and construction and industrial equipment.
We are among Fortune Global 500 and No.1 in China building materials industry. We have our own factory, logistics system, e-business platform, and oversea warehouse. Our products meet international quality standard.
For more information about us you can go to our official website icnbm dot com and okorder dot com.

Q:Just curious... I'm not in construction and always wondered...
The top sections of the mast beneath the crane are removed one at a time and lowered to the ground. The top section of the crane has hydraulic rams that lower it down one mast section at a time. It is hard to describe without a diagram or photos. See photos at attached link. In some design, the jacking portion is at ground level. The crane jacks itself up so a 20' section of the mast can be unbolted and slide out. Then the jack is lowered so the process can be repeated. See second link for photos and a more detailed explanation.
Q:In Batman Begins.I'm guessing something in the Psychology area...?And what courses would you need to take to have the same career.
I just watched that movie last night :) I would say that Crane is a criminologist which is the the scientific study of crime and criminal behavior and law enforcement. In which you would need to study psychology and sociology. Many colleges also have a criminology major. If not, then I would say that he is a psychiatrist (a medical doctor that deals with workings of the mind) who is used as a consult by the Gotham City Police Department. To be a psychiatrist, one needs a medical degree, and to also study psychology and sociology. However, to by a psychologist, you don't need the medical degree. I want to major in psychology, so I've done this research haha. Hope this helps!
Q:A solid answer and links would be nice.Your help and/or attempts to help are appreciated
www.pacificfriend.ca/html/one_tho... This site will give you the story of the Japanese girl during the time of WWII. It is a touching story.
Q:Jon and Paul are folding origami cranes. If Paul works alone he can fold 100 cranes in 5hours. together they can do the same job in 3 hours. how much time would it take for Jon to fold 100 cranes alone? Please show your work. :)
1/5 + 1/x = 1/3 == x = 15/2 = 7.5 h answer : 7.5 hours ++++++++++++++++++++
Q:I saw this documentary on ancient buildings like the pyramids and it said that we don't have a construction crane that can life the stones used to build some of these ancient structures.So I gotta wonder how much the strongest crane CAN lift....or is that just fantastical nonsense about cranes not being able to lift those blocks?
First, okorder /. This means that at 5 m the capacity is 600 tonnes. Double the radius, half the capacity. A crane located at the foot of the pyramid, will be at 115.2 m from the center. At that radius, the crane could only lift 26 tonnes, so this crane could not lift the greatest stones weighing 80 tonnes. Being the boom only 100m it could'nt even reach the center.
Q:It's better if the explanation is not complicated.TQ
Hello, 1. Modularity: You can build ships (larger ships) in modular sections and have the crane lift these modular sections and put them into place for final assembly. This is one major advantage that was not available back in the day
Q:crane operator?
Ya dude--truck driver---your turn
Q:What does a track type tower crane look like? In that case, use?
With a trolley, it can move in a straight lineSuitable for short range movement
Q:the question is :Two cranes can unload a ship together in 15 hours. The faster crane takes 16 hours less than the slower crane, if each were to unload the same ship alone. How long doesi t take for each crane to unload this ship? I done most of the math but i am stuck with this last part .15+- radical 1185/2
No. of hours for the slower to unload alone—x: 1/x + 1/(x - 16) = 1/15 (x - 16 + x)/(x? - 16x) = 1/15 15(2x - 16) = x? - 16x 30x - 240 = x? - 16x x? - 46x = - 240 x? - 23x = - 240 + (- 23)? x? - 23x = - 240 + 529 (x - 23)? = 289 x - 23 = 17 x = 40 No. of hours for the faster to unload alone: = 40 - 16 = 24 Answer: slower crane, 40 hrs; faster crane, 24 hrs Check: = 15(1/40 + 1/24) = 15([3 + 5]/120) = 15(8/120) = 15(1/15) = 15/15 or 1
Q:Has anyone actually folded 1000 paper cranes? i want some proof
no and no proof

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords