Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
2000 pc
Supply Capability:
200000 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Item specifice:

Standard: EN74,BS1139 Place of Origin: Shandong, China (Mainland) Finish: Electroplate,Zinc Plate
Technic: Forged Item: Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings Size: 48.3*48.3mm
Material: Q235 Model Number: SD-3001 Brand Name: SD
Weight: 1.10kg

Product Description:

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings 

 

Product Description

 

1.Item:   Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings 

2.size:48.3mm;

3.material :Q235;

4.standard : EN74,BS1139

5.ISO 9001:2000 is approved;

6.OEM service is available.

7.type:British Type Double Coupler

 

ItemDrop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings
Item NO.SD-3001

Material

Q235

Surface

Electroplate,Zinc Plate

Size

48.3*48.3mm
weight

1.10kg

Port

Qingdao

Payment

L/C,T/T  We can contact in detail

 ShipmentFOB,CIF,EXW
 Package  knited bags + steel pallets or as required
 DeliveryDetail 20-45days
  Standard  EN74,BS1139

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Drop Forged Scaffolding Swivel Coupler/Swivel Fastners/Swivel Fittings

Our Main Manufacturing

 

(1)   Scaffolding System: 

 

Including Ringlock Scaffolding System and accessories; Cuplock Scaffolding System and accessories; Kwikstage Scaffolding System and accessories; Haki Scaffolding System and accessories;

 

(2)   Scaffolding Frame & Accessories:

 

Including Walk Through Frame Scaffolding; Ladder Frame Scaffolding; Accessories; we also can make scaffolding according to your samples or drawings.

 

(3)   Scaffolding Couplers/Clamps:

 

We can produce all kinds of forged and pressed couplers, including British type couplers, American type couplers, German type couplers, Italian type couplers ,fence couplers, BRC coplers and so on. We also can produce according to your drawings or samples.

 

(4)   Formwork System Scaffolding & Accessories:

Light Duty Shoring prop and Heavy Duty Shoring Prop; Wing nuts and Tie rods; RASTO clamp and so on.

Our Company View

 

Company Information

 Factory

 

1

 

Workshop

2

 

 

 

Packaging & Shipping

 3

 

 

Certifications

 

 

 

We are always focusing on to supply our value produce and best service to all our customers.

 


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:scarlet letter need help with identifying symbols(scaffold,forest,bush,and letter) PLEASE!!!!?
I for irritable Good thing we're not traveling around together. We'd get in a heap of trouble, lol
Q:Cantilever scaffold technical disclosure Find satisfaction free speed!!!
Fastener:(1) new fasteners shall have production licenses, product quality certificates and inspection reports. Old fasteners should be used before the quality inspection, there are cracks, deformation is strictly prohibited, the use of bolts must be replaced sliding silk. New and old fasteners should be anti rust treatment. Corrosion of fasteners and damaged fasteners timely repair replacement bolts. Bolt oil support easy to use.(2) the fastener and the joint surface of the steel pipe should be in good contact with the steel pipe, and the minimum distance of the opening should be less than 5mm. The fastener in the bolt was 65N.m, shall not be damaged.
Q:people who have an industrial/scaffolding piercing?!?
Actually getting it pierced isn't all that painful, it's the couple of weeks after that might hurt...but as long as it's looking after properly (cleaned every day) all should be good. Sleeping on it can be painful, so i would suggest you get the side pierced that you don't usually sleep on. As for taking your mind off it, maybe take someone in with you while you get it done? then you can either talk to them to distract you or just squeeze their hand...also try not to look at the needle as this could just scare you, don't worry too much though, it'll all be over and done with in a few seconds and the pain really isn't that bad. As well as making sure you clean it every day, it's also important to make sure you're not playing with/touching it all the time as this could lead to an infection, always make sure your hands are clean before touching it. That industrial bar looks really nice, i would aim on waiting a couple of months before putting it in though maybe even about 4-5 months. Overall i think you should defiantly get it pierced the look really nice, good luck!! :)
Q:Piercing question: How do I know what size industrial/scaffold bar to get?
Please ignore the the bigger the better idea. A longer bar can be as bad in an industrial piercing as a shorter bar can be. It really depends on what size you were pierced with...16g o 14g. Industrial piercings are typically done at 14g, 16g would be too small. The length depends on your anatomy...you really should go to a professional piercer to get the bar put in since your piercings aren't completely healed. That way everything can be 100% sterile and they will be able to fit the proper length of jewelry into your ear.
Q:How to do an industrial(Scaffold) piercing without a bend in the ear?
This is why you need a pro. I can see where you should probably put a helix-to-helix industrial in that ear, but if yall can't see it, then I don't think you should be trying this, as neither of you have the experience a professional piercer does.
Q:What are the full house scaffolding specification
5 "technical code for safety of steel tubular scaffold for building construction" (JGJ128-2000)6 "construction formwork safety technical specifications" (JGJ162-2008)
Q:Painters on a scaffold physics help!!?
Total weight = 222 + 158 + 84 = 464 lb So, each support must carry 232 lbs Working in inches: Take moment about Right hand end Board is assumed to be uniform - CG is at the center (232 x 32) + (232 x 133) = (158 x 106) + ( 84 x 82.5 ) +(222 x d)7424 + 30856 = 16748 + 6930 + 222d 222d = 14602 d = 65.77 inches Distance of 222 lb painter should be 5ft 5.77inches from Right end
Q:in the scarlet letter, what events happen at the scaffold during the night??
On the Scaffold Dimmesdale is really starting to go crazy. the guilt in his heart about loving hester is eating him up. he goes onto the scaffold thinking no one will see him. he is punishing himself. he yells out and thinks that it will be the end of his secrect but no one hears him. they just think he is the cry in the night. then reverend wilson comes along. but he doesnt see dimmesdale. then hester and pearl walk by they notice them. they come up on the scaffold. Pearl asked dimmesdale if he would stand with hester and her at noon the next day but of he says no that he will only stand with them on Judgement Day. then they see the scarlet letter in the sky and the town people thought that it was just an a for angel because the gov passed away. they next day wilson finds dimmesdale's glove on the scarrold but he thought that the devil put it there. i cant remember what chapter it is in but it is toward the middle good luck with the book i loved it
Q:Fastener type steel pipe scaffold accessories
Wall pieceEven the wall piece the upright rod is connected with the main structure together, available steel tube, fastener or embedded part. Rigid wall, also can be used as a flexible reinforced wall connecting piece of the tie bar.
Q:can anyone tell me if it is true that the scaffolding on york minster has to stay there for political reasons?
York Minster Scaffolding

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range