Delivery Pipe With SK Flange 7.1mm ST52 DN125

Ref Price:
Loading Port:
Tianjin
Payment Terms:
TT OR LC
Min Order Qty:
110 pc
Supply Capability:
5020 pc/month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Product Description:

The Delivery Pipe With SK Flange will have longer life compare to normal pipes, it made by steel material No.ST52, 37MN5, according to customer’s requests, and also package in bundles or nude packing directly put into container.

Scope of Application of the pipes

The Delivery Pipe With Sk Flange is a concrete delivery for combined use with other concrete pipelines in concrete placement operations. It can be widely used in the construction of various types of concrete structures like industrial and civil buildings, bridges, roads, and other types of infrastructure.

This pipes can only be used in concrete construction operations, but not in any other operations, like dragging, moving, or hoisting heavy articles or personnel. The pipe is also not allowed to be used in any location where any combustible or explosive material exists or a cave-in may occur.

 

Product Advantages:

OKorder's Delivery Pipe With Sk Flange Channels are durable, strong, and safety.

 

Main Product Features:

·    Premium quality

·    Prompt delivery & seaworthy packing (5-10 days)

Reliable performance

Easy to weld

High safety.

·    Professional Service

·    Competitive pricing

   Measuring of wall thickness from the outside

   Low purchase cost

Product Specifications:

Delivery Pipe With SK Flange DN125(5.5")

Thickness:7.1mm

Color: Red Oxide  

Material: ST52

Flange Size:148mm

Hardness:65HRC

Delivery time: 10 days

FAQ:

 

Q1: How long about delivery time?

A1: Normally we keep the raw materials for old customers and sometime we also keep stock products to make sure delivery time in any emergency cases.

Q2: How do we guarantee the quality of our pipes?

A2: We have established an advanced quality management system which conducts strict quality tests at every step, from raw materials to the final product. At the same time, we provide extensive follow-up service assurances as required.

Q3: How soon can we receive the product after purchase?

A3: Within three days of placing an order, we will book the vessel for goods. The specific shipping date is dependent upon international and government factors, but is typically 7 to 30 workdays.

Q4: If we can produce some pipes according to customers request?

A4: Yes, we can produce Concrete Placing Boom according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q5: How to make a quick resolution for after service?

A5: OKorder and our manufacture both have overseas branches all-around of world, IF needed,


 

Images: 

Delivery Pipe With SK Flange 7.1mm ST52 DN125

Delivery Pipe With SK Flange 7.1mm ST52 DN125


Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:What are the sectors of machine building and parts processing?
3., machinery manufacturing is also a kind of industry, many industries have parts manufacturing, processing links. Therefore, the processing of parts does not belong to a particular industry.
Q:What is the use of spare parts prices in Chinese market by foreign companies?
But there is always somebody to ask, just like a college paper, where everyone can read or keep secrets, but collecting them and sending them to foreigners is a sign of treason
Q:Where does Heilongjiang do the most construction machinery?
It is mainly used for national defense construction project, the construction of transportation, energy industry construction and production, mining and other industrial raw materials, construction and production, forestry and water conservancy construction, industrial and civil construction, city construction and environmental protection.
Q:How are buildings, installations and materials divided?
Provisions on the division of equipment and materials for engineering construction? [answer] the division of equipment and materials in engineering construction is directly related to the reasonable division of investment structure, budget preparation and calculation of construction output value. In order to reasonably determine the project cost, strengthen the investment in the process of construction and management, the equipment and materials in the engineering construction is unclear, especially the universal controversial common problems and put forward the principle of division of fifteen copies of "national unified installation project budget quota" of the equipment and materials are divided, the provinces, autonomous regions and municipalities directly under the central government and the relevant departments of the State Council, the Department should be combined with the local situation, formulate rules for its implementation, and report to the Ministry of construction for the record.
Q:What functions should be achieved in mechanical structure design?
The design of mechanical structure is based on the overall design, according to the principle of the program to determine and draw a specific structure, in order to reflect the required functions. Is the working principle of the abstract concrete into some parts, the specific content in determining the structure of the material, shape, size, tolerance, heat treatment and surface conditions at the same time, we must consider the process, strength, stiffness, accuracy, and other parts of the relationship between each other and other issues. So, the direct product structure design is the technical drawings, but the design work is not a simple mechanical drawing, drawing only express design language, specific integrated technology is the basic content of structural design.
Q:Construction machinery production need to deal with what documents?
The person in charge of the enterprise, the person in charge of the project, full-time safety management personnel in "safety assessment qualified" column content according to the "three persons" Safety Assessment Certificate (fill in the contents of enterprise work safety management staff should meet the enterprise production safety management, the safety management department staff with the qualification to the total contract for not less than 5, not less than 3 professional contracting labor subcontracting, not less than 1; the construction site should be equipped with full-time safety management personnel according to the project size can be determined, according to the construction area of less than 10 thousand M2 project has at least a part-time staff of more than 10 thousand M2; project 1 - 2 full-time staff; more than 50 thousand M2 large sites, according to different professional safety management group);
Q:Where are the hanging baskets for the building?
It is forbidden to take a stool or put a ladder on a hanging basket to work higher; it is not allowed to work alone in a basket, and no electric machinery or equipment can be placed in the basket;
Q:Where was the construction machinery conference held in 2015?
Support unit: Automobile and engineering machinery parts testing institute, Qihe Economic Development Zone, Shandong Province, Shandong Jiaotong University, Mechanical Engineering Institute, Qingzhou Engineering Machinery Industry Association, three, China Railway ten Bureau, in a company, China water conservancy and hydropower Sixth Engineering Bureau Co., Shandong high speed group limited company, the China Metallurgical Construction Group Limited, China Railway Construction Group, Shandong road fourteen, Shandong the Yellow River Engineering Bureau Group Co. Ltd., Ji'nan City Highway Bureau, Dezhou City Highway Bureau, Tai'an City Highway Bureau, Jining City Highway Bureau, Laiwu City Highway Bureau, Shandong WorldCom Highway Construction Co. Ltd.
Q:What measures can effectively reduce the construction accident rate?
Hefei construction workers training _ fail safe design: in the part of the system, equipment malfunction or damage, can also ensure the safety of safety and technical measures known as fault - Safety Design in a certain period of time (fail-safe). Generally speaking, through careful technical design, the system and equipment are in a low energy state when the fault occurs, thus preventing the unexpected release of energy. For example, a fuse in an electrical system is a typical fault - Safety Design; when the system is overloaded, the fuse is fused and the circuit is disconnected to ensure safety. Although the fail safe design is an effective measure of safe technology, but considering the fail safe design itself may not work due to failure, so the choice of safety technical measures should not give priority to the use of.
Q:The building electrical iron pipe and the pipe line fixing member connected to what is called, what is called the iron pipe and the 86 fixed part of tin
The distribution of the construction site, construction machinery and electric hand-held electric tools, lighting, construction site construction site: risk factors and lightning protection, the construction site of common electrical tools and instruments, the construction site of the electricity management, common electrical fault, accidents and accident cases.

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range