DAHA Tower Crane QTZ4808

Ref Price:
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
-
Supply Capability:
60 /month

OKorder Service Pledge

Quality Product

Order On-line Tracking

Timely Delivery

OKorder Service Pledge

Credit Rating

Credit Services

Credit Purchasing

Share to:

Product Description:

Dahan group, established in 2000, is specialized in Tower Crane Hoist and Building Hoist. And registered capital reaches 100 million RMB. Dahan group has their own research and development department as well as production, marketing, service and financial department. The production capacity can be over 10000 sets and have earned the reputation as a leading manufacturer of tower crane and construction hoist.

Located in Jinan high and new technology industrial zone, office area is 3000square meters. Production base is in Jinan, Guangdong, Hunan. Total area  reaches 300000 square meters.

High-quality technological management team and first-rate production and detection equipment lay good foundation for the steady development of the company. Its technology and management personnel, including many senior engineers, have college degree or above, and skilled workers mostly have vocational school degree or above. The company also has over 200 general and special production equipment and over 300 measuring instruments for detection. The company passed the certification of ISO9001 Quality Management System in 2002, providing reliable guarantee for the management system and product quality.  

Our Dahan concern requirements of modern city construction and strive to provide products with advanced technology and rational price, furnish good technical support and pre and after-sales service for customers. We hope to create beautiful future with customers.

Corporate Vision

Vision:Become an ever-green construction machinery enterprise and maximally meet customers’ requirements
Core Values  
Quality: High quality, innovation, safety and reliability.
              High quality is the basis of the enterprise.
              Innovation is the soul of the enterprise.
              Safety is reverence to life.
              Reliability wins the trust.
Service: Customer focused, customers are existence value of Dahan people, do what we have promised.
Responsibility: Attentive and responsible, brave to undertake and fully perform individual, company and social responsibility.
Spirit
Hard Work:Industry, simplicity, perseverance and hardships are the source power of Dahan to achieve transnormal and leapfrog development.
Struggle:Concentrated reflection of brave advance, assiduous seeking, brave challenge and enthusiasm and progress of Dahan people.
Pioneering & Progress::Promote traditions, keep pace with the times, have the courage to innovate and pursue excellence in work

Send a message to us:

Remaining: 4000 characters

- Self introduction

- Required specifications

- Inquire about price/MOQ

Q:Calculate how much power the crane has?
the crane ?? The crane is not defined.
Q:What is the most effective way to kill a Crane Fly (Daddy Long Legs)?
Katheen is right about crane flies not being daddy long legs, and that if you have a cat, you should bring it in your room. You could also use a handy dandy, everyday, all around, fly swatter! Or if you don't have that you could use your flatmate's shoe! or pillow!
Q:WHat is the DiFfErEnCe BewtweeN A SAdhILl CranE and an Egret?
They are not of the same familia.The Sandhill Crane is of the genus-us Grus canadensis,the Egret comes into two gen-uses Casmerodius Egretta or Ardea. Sandhills are much larger than even the largest Egret.which is the Great White, the smallest is the Little or Cattle Egret. All this information can be found by looking into search both species,
Q:SWL and Capacity for Cranes...?
Swl Crane
Q:when do i start bernie cranes missions gta 4?
you don't unlock the Bernie Crane Missions until you complete Weekend at Florian's for Ray Boccino. The first Bernie Crane mission is called Hating the Haters where you have to run with Bernie in the park and kill the guy that's been harassing him.
Q:Sadako and the thousand paper cranes.?
I think she died.
Q:Do US Navy Boatswains Mates Operate Cranes?
In the latest update to the NEOCS Manual Vol II (NECs) I no longer see an NEC for BM for Crane Operator. Volume II Navy Enlisted Classifications (NECs) NAVPERS 18068F April 2011 NEC Chapter 4 RATING SERIES AND SPECIAL SERIES NECS www.public.navy.mil/bupers-npc/re...
Q:crane signals?
they are out there somewhere, and everywhere I have been they are the same
Q:Two cranes can unload a ship together in 8 hours. The faster crane takes 12 hours less than the slower crane,?
I'm surprised by how difficult and convoluted the other answers are. They're also wrong. If two cranes are working together and one crane can, in fact, do the job in two hours, then it cannot possibly take longer than two hours with the help of another crane. That makes no sense just by simple reasoning. So the answer of 2 and 14 hours is not correct. Not even close, really. Here's the simple, neat, and correct approach using basic algebra with no assumptions necessary or made: If crane 1 can unload at a rate1/x per hour, then crane 2 can unload at 1/(x+12) per hour since it takes 12 hours longer. The two cranes combined, unload at 1/8 per hour, which must be faster than either one alone. Example: If I can eat a pie in 3 hours and you can eat a pie in 6 hours: 1/3 + 1/6 = 3/6 = 1/2, so together we can eat a pie in just 2 hours... less time than either one alone. Makes sense. Back to the cranes, then: 1/x + 1/(x+12) = 1/8 (2x+12) / (x^2 + 12x) = 1/8 16x + 96 = x^2 + 12x x^2 - 4x - 96 = 0 (x - 12) (x + 8) = 0 - x = 12 or -8 Since the rate cannot be -8, the answer is x = 12 Crane A can unload all by itself in 12 hours. Crane B can do it in 24 hours, and together they can do it in just 8 hours. Check: 1/12 + 1/24 = 3/24 = 1/8 Their combined rate is, indeed, 1/8 per hour!
Q:why should we save the crested cranes?
Why shouldn't we? Where do we draw the line when we're responsible for species after species going extinct. Granted, you shouldn't be expected to physically rebuild their habitat yourself if your not up to it; but a small change here or there isn't to much to ask to help save the world, is it?

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range