• Copper PVC Sheathed XLPE Power Cable System 1
Copper PVC Sheathed XLPE Power Cable

Copper PVC Sheathed XLPE Power Cable

Ref Price:
get latest price
Loading Port:
China Main Port
Payment Terms:
TT or LC
Min Order Qty:
500 Meters m
Supply Capability:
100000 Meters per Week m/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

 

Feature

Conductor

Copper

Applicable Standard

IEC 60502-1, GB/T 12706-2008,  DIN VDE 0276-620, HD 620 S1: 1995

Operating temperature

Max. Rated conductor operating temperature is 90°C

Insulation Material

XLPE  ( crosslinked polyethylene)

Sheath Material

PVC   (polyvinyl chloride)

Sheath color

black  

 

Construction

1.Copper Conductor

2.XLPE Insulation

3.PVC Sheath

Q:Is the RVV power cable also called a cable?
Depending on the actual situation and design there is no future addition or function increase. If not increased or the second phase design should not be reserved, because the general integrated wiring warranty period is 20 years. If it is damaged during the warranty period, the construction unit is responsible for solving! Fiber is generally called spare. Not reserved! Prepare a 4-core and so on.
Q:The difference between the instrument cable and the low voltage power cable
If the words are used, the difference is not true if the front is the control cable, followed by the power cable
Q:We are now the construction site will all BV line to AF? What is the purpose, AF line in the end where the better
AF high temperature installation line, temperature level is much higher, ordinary residential do not need so well. This line is usually used in military industry. The Materials are usually made of silver-plated wire, tinned wire and the like, and the use of fluorine plastic. BV is the most common, the most commonly used cloth wire, suitable for general purpose. Material is only copper and PVC.
Q:In the laying of the time when there is no specific requirements if not and some cable to go the same bridge more
Shower room installation Note 1: handling, the shower room level easy to make the glass broken, must be vertical and more than two people at the same time handling, and pay attention to avoid collision with the hard objects. Shower room installation Note 2: shower room after the opening of the glass should be placed directly against the wall, placed horizontally or uneven placement may lead to glass damage, resulting in property damage or personal injury. Shower room installation precautions 3: cleaning is strictly prohibited the use of acid, alkali, organic solvents such as chemicals and acid cleaning agents, otherwise it will damage the surface of the product; use of water or neutral detergent on the product surface clean, can not remove the pollution Trace, can be soaked with a small amount of alcohol cleaning cloth to remove stains; shower room installation Note 4: acrylic plate is easy to attach static dust, clean acrylic basin only with cotton cloth dipped in a little soapy water can easily remove the dust Cleaning effect. Shower room installation precautions 5: the use of sealed silicone, silicone rubber should not be coated on the surface of acrylic. If you accidentally painted a little remember not to rush to wipe, so more difficult to remove, should wait until after curing gently peeled out, is strictly prohibited with a hard object scratches, otherwise it will lead to surface damage. After the bottom basin is installed, it should be used after the silica gel is fully cured (silica gel curing time is 24 hours). The above is the relevant shower room installation precautions, hoping to give you in the decoration when the bathroom can play a certain role in helping.
Q:Instrument cable linked to the card EJB, sjb on behalf of what it means
Can not, air compressor trachea will be heat, will damage the cable, too many pipelines buried together, after the maintenance will be a lot of trouble.
Q:What is the difference between a KVVR cable and an RVV cable?
The small circle on the wire is marked with a number or letter on the line number. It is set according to the line number on the drawing. A complete wire should be the same for both lines. It is for easy installation and maintenance. And used.
Q:Who provided the more to the sub-gave to whom, thank you for helping
Short-term work optional 4 square, long-term work, the proposed selection of 6 square and above.
Q:What is the meaning of kxv in wire and cable?
According to the drawings when the wiring should be reasonable to find the shortest distance to reduce the cost of water and electricity materials, the strength of electricity in the distribution of wiring.
Q:For example: WDZB-YJY-3 * 2.5RVSPWEL, etc. Thank you, I am a novice, just enter more
Hello: - ★ . "the scene can not be fixed, with a very tight tie in the cable through the transformer line up" ... ... emergency use is entirely possible. - . need to pay attention to the problem: through the heart of the current transformer (temporary cable tie is firmly tied to the wire through the transformer) to install, to prevent the secondary wiring screws touch the other wire, To prevent measurement is not accurate. - ★ . pay attention to the second line of the line to be strong, to avoid open circuit. The secondary conductor shall be of 2.5 square copper wire (not less than 2.5 square meters).
Q:Can KVV control cables be used for home heating?
Can, in the water pipe on the top 0.3 meters wear protective tube on the line, if the optocoupler should do a good anti-corrosion on the line.
Along with the development of the market, now our trade range becomes wider and wider. We really hope you can work together with us, and we will give you the best service and the best product quality.

1. Manufacturer Overview

Location Yunnan,China
Year Established 2005
Annual Output Value Above US$100 Million
Main Markets Southeast Asia 0.3%
Africa 0.5 %
Domestic Market 99.2%
Company Certifications ISO 9001:2000;ISO 9001:2008

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port Shenzhen,Guangzhou,Shanghai
Export Percentage 21% - 30%
No.of Employees in Trade Department 6-10 People
Language Spoken: English, Chinese
b)Factory Information  
Factory Size: 5,000-10,000 square meters
No. of Production Lines Above 10
Contract Manufacturing OEM Service Offered Design Service Offered Buyer Label Offered
Product Price Range High and/or Average

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products