• Concrete Roof Purline Making Machine Production Line System 1
  • Concrete Roof Purline Making Machine Production Line System 2
  • Concrete Roof Purline Making Machine Production Line System 3
  • Concrete Roof Purline Making Machine Production Line System 4
Concrete Roof Purline Making Machine Production Line

Concrete Roof Purline Making Machine Production Line

Ref Price:
get latest price
Loading Port:
Qingdao
Payment Terms:
TT OR LC
Min Order Qty:
1 pc
Supply Capability:
5 pc/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Concrete Roof Purline Making Machine Production Line


1.   Structure of Concrete Roof Purline Making Machine Production Line:


Concrete Roof Purline Making Machine Production Line is our special developed products as results of our engineers research, with which 60%steel material will be saved compared with traditional revolving die method. Efficiency can be improved 3 to 5 times compared with conical die method, these machine are easy for operation and convenient for maintenance, products from these machines are in good quality, smooth appearance and accurate in size.

 

 2.   Main Features of Concrete Roof Purline Making Machine Production Line: 


• One machine can make one slab lower cost, high Wear-resistant, long service life.

• Provide consumers with regular visits

• Simple structure, easy operate, less wear parts

 

3.  Concrete Roof Purline Making Machine Production Line Images:

Concrete Roof Purline Making Machine Production Line

Concrete Roof Purline Making Machine Production Line

Concrete Roof Purline Making Machine Production Line

 

4.  Prefabricated Concrete Purline Compression Molding Machine Specification:

 

Product name

Type

Productivity

Hole number

Concrete purline  machine

60*120*140*

1.3-1.5m/min

4

Concrete purline  machine

60*130*150*4

1.3-1.5m/min

4

Concrete purline  machine

60*140*160*4

1.3-1.5m/min

4

Concrete purline  machine

70*150*170*2

1.3-1.5m/min

2

Concrete purline  machine

80*160*180*2

1.3-1.5m/min

2

Concrete purline  machine

60*110*130*4

1.3-1.5m/min

4

 

Model no.

No. of holes

Dia.

No. and dia. of wires

Electric motor power(kw)

Vibrator Motor Power(kw)

Total Power

(kw)

Max. span

Molding Speed(m/min)

Overall dimension

(mm)

Weight

(kg)

60X120X140X4

1

30

5/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

1000

60X130X150X4

1

30

6/5

4

1.5

5.5

4

1.3-1.5

2250×900×850

1000

70X140X160X4

1

30

8/5

4

1.5

5.5

4.5

1.3-1.5

2250×900×850

1050

70X150X170X2

1

30

8/5

3

1.5

4.5

4.7

1.3-1.5

2250×900×850

750

60X110X130X4

1

30

6/5

4

1.5

5.5

3.5

1.3-1.5

2250×900×850

950


Production Line Layout


Concrete Roof Purline Making Machine Production Line

 


Certificates


Concrete Roof Purline Making Machine Production Line


5. Packing & Delivery


•  Wire cables are used for fastening the machine on the trailer or inside the container.

•  Machine covered with plastic film.

•  Machines can be packed in tarpaulin or wooden case according to customer’s needs.


Concrete Roof Purline Making Machine Production Line


6. Customers from All Over The World

Concrete Roof Purline Making Machine Production Line


7. FAQ: 


We have organized several common questions for our clients, may help you sincerely:

•  What information we need to confirm with you before send a formal offer?

What kind of slab you want to make, wall panel, roof panel, lintel or something else?

Do you have exact slab size (slab thickness and width)? If not, please tell us the slab span, we will give you suggestion.

•  Have you use this kind of machine before? 

Our machine is totally different from European machine. Please don’t follow their instructions.

•  How long can we receive the product after purchase?

In the purchase of product, within 20 working days we will arrange the factory delivery as soon as possible. The specific time of receiving is related to the state and position of customers. Commonly 35 working days can be served.

•  What kind of machine do you have?

Our main products: large span GLY concrete hollow core slab machine, light - weight wall panel machine, lintel machine, column machine, hollow core slab cutting machine, concrete feeding dumper, high-strength steel wire tensioning machine, which amount to more than the types and more than four hundred standards. We can provide the whole plan and technology supporting for concrete precast component. 

 

8. Why choose us:


•  30 years manufacturing experience.

•  Constitutor of the.

•  More than 10 patents.

•  Passed ISO9001:2000 quality system certificate.

• More than 10 types of machine and over 100 models for choose.

Supply complete set of technology and equipment solution.

• We can design and manufacture all kinds of concrete forming equipment according to customers' demands. Meanwhile we can even more provide our customers a complete set of technology and solution for all producing flow.


9. Our Service:


•  We supply the technical supporting all the time.

•  We supply one year warranty for whole machine.

•  We supply free quick wear parts. 

•  We supply low charge continue maintenance when warranty is expired.

•  We supply free training to end-users

 

 


Q:How to be the agent of zhengzhou Kefid machinery?
kefid okorder
Q:where can i get the plant layput & list of machinery along with market value?
For what kind of company?
Q:this is according to marx, i think its to do with how machinery changed society from primitive to industrial, im not sure tho, any help would be gratefully appreciatedthanks
social relationships are transformed into apparently objective relationships between commodities or money. workers are alienated from their work due to increase machinery
Q:what rate of depreciation on new machineries purchase?
The maximum section 179 deduction you can elect for property you placed in service in 2006 is increased to $108,000 for quali?fied section 179 property. This limit is reduced by the amount by which the cost of section 179 property placed in service during the tax year exceeds $430,000. Assuming you bought this equipment and it was placed into service in 2006, you dont have to capitalize it and depreciate it. You can elect to expense the equipment up to $108,000. This limitation gets reduced dollar for dollar for the amount of equipment placed into service in 2006 that exceeds $430,000.
Q:Can you just tell me what you did as a machinery repairman? Where was your first station that you went to? Or where you assigned directly to a ship? Did you ever get stationed at the Norfolk Naval Shipyard? Did you ever go overseas? Were you on the ship more or on shore more? And finally but not least when you were deployed how long were you usually deployed for?i know i have alot of questions but its something im interested in and no one has given me a straight answer. But anything will be greatly appreciated.Thank you for your time and God Bless :-)
First okorder /
Q:I just wanna know how much sea duty will they get and how much shore duty will they get? Is there a possibilty that they can get more shore duty? And yes i know i know when you are in the navy you're going to be on the sea thank you i heard that so many times lol!!!! But any answers will be great!!Thank you all and god bless
It is likely that you will spend more time on a ship as that is where the most machinery and equipment is....unless you are posted in a motor pool (government cars etc.) but those jobs are few and far between.
Q:what are the machinery in which threads are used for power transmission?
Ball screws and ACME screws are often used as the means to provide thrust in a linear actuator. Linear actuators are present in many, many applications.
Q:i am setting up a condom factory in gujarat? where can i get the required machinery?
I agree with helpaneed
Q:Have you ever driven heavy machinery like a fork lift?
Nope.
Q:Jan. 1 Retired a piece of machinery that was purchased on January 1, 2001.The machine cost$62,000 on that date. It had a useful life of 10 years with no salvage value.June 30 Sold a computer that was purchased on January 1, 2008.The computer cost $40,000. Ithad a useful life of 5 years with no salvage value.The computer was sold for $14,000.Dec. 31 Discarded a delivery truck that was purchased on January 1, 2007. The truck cost$39,000. It was depreciated based on a 6-year useful life with a $3,000 salvage value.InstructionsJournalize all entries required on the above dates, including entries to update depreciation,where applicable, on assets disposed of. Ingles Company uses straight-line depreciation. (Assumedepreciation is up to date as of December 31, 2010.)
Interesting arguments, but I am not 100%

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords