• Motor Grader 722-6 New Model Hot Sale Pre-order System 1
  • Motor Grader 722-6 New Model Hot Sale Pre-order System 2
  • Motor Grader 722-6 New Model Hot Sale Pre-order System 3
Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
1 PCS
Supply Capability:
11 PCS/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

Product Description:

Details

 

Feature: Motor Grader

Condition: New

Model Number: 722-6

Place of Origin: China (Mainland)

Brand Name: CMAX

Certification: ISO, CE

Warranty: 1 Year

Application: Building, Construction, Industrial

 

Main Features

 

1.Equipped with original Cummins engine
2. Single-handle electro-hydraulic controlled power-shift T/M, 6 forward &3reverse shifts makes operation easy and convenient
3. Hydraulic lock, auto lock/unlock NO-SPIN differential guarantees stability and powerful traction
4. Ideal axel load allocation provides excellent stability while cutting hard surface
5. Serviceable, efficient hydraulic system enables every part to be fully used
6. Box-typed frame and advanced T/M enable it to complete heavy-duty work
7. A wide working range is accomplished through flexible blade suspension system and articulated frame

 

Specifications

 

Motor Grader 722-6 New Model Hot Sale Pre-order

 

Images of Product

 

Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

Motor Grader 722-6 New Model Hot Sale Pre-order

 

FAQ

 

 

Q1: If we can produce some Motor Grader 722-6 according to customers request?

A1: Yes, we can produce Motor Grader 722-6 according to the difference country situations to make it suitable to the market and customers. We have very professional technical team to make the design.

Q2: How to make a quick resolution for after service?

A2: OKorder and our manufacture both have overseas branches all-around of world, If needed, the seller shall dispatch 2 engineers to the buyer's site for supervision of training. The buyer shall make available of necessary facilities & skilled personnel at site for training.

 

 

Q:How does the heating and air conditioner work?
V will not regret the crazy ending will feel rash and too much in haste and music
Q:Has anyone used the grader of China National Heavy Industry?
GoodAskHow do you sayChasing the answerThe work efficiency is very high and fuel saving, and compared with other domestic machine is still relatively durable.
Q:What are the modes of operation of Grader? How are they operated?
(four) oblique homework;With the features of frame articulated or all wheel steering, the grader can work diagonally. In many job situations, diagonal operation is necessary to keep the wheels away from the pile and keep the machine more stable.
Q:Ask the above three models of the driver's job responsibilities, to be specific, not general. I will add additional points
The working surface static roller and 1 roller should be properly smooth, to fill the soft subgrade should first use ramming machine roller by kneading or rolled or compacted layer behind the available road. 2, when the soil moisture content of more than 30% may not be rolled, water content less than 5%, appropriate watering. 3, the longitudinal slope of the work area should not exceed the maximum climbing capacity of the roller, the transverse slope should not be greater than 200. 4, the machine weight should be selected according to the rolling requirements. When a roller machine may need to increase the weight inside the roller sand or water. When the temperature drops to 0 degrees centigrade, the weight shall not be increased by water 5, and the tyre roller shall not be operated on the big stone foundation. 6, before the operation of pipeline and fittings of each system should be free of cracks and loose leakage phenomenon, the scraper roller should be smooth, not loose fasteners, tire roller should also check the tire pressure, to confirm the normal before start. 7. The internal combustion engine shall not be forced to be pulled by traction, nor shall any mechanical or object be hauled by the rollers. 8. After starting, test operation should be carried out. It is confirmed that the operation is normal, the braking and steering functions are sensitive and reliable, and the operation can be done. No obstructions or personnel around the roller should be operated. 9, rolling should be low speed, variable speed must stop. The speed should be controlled at 3 ~ 4 /h within the scope of our knowledge, no change in a rolling schedule. The rolling process should be kept in the right direction. When rolling second rows, the rollers must be overlapped with half of the rollers. 10. The direction and direction of the reversing roller shall be carried out after the roller is stopped. The reverse clutch shall not be used for making system.
Q:What is the reason that the ZF gearbox of Tiangong grader does not go?
There are many reasons for this. Are there any stalls or are there no individual stalls? To their own investigation, such as the valve pressure is too low, friction slip, oil enough, and so on
Q:Domestic and international brands of Graders
Followed by Xu Jian, Chang Linzhu, 31 and other brands, the four domestic brands of grader market share of more than 90%. Caterpillar, Volvo and other foreign brands also have a certain market share, but the market share is small.
Q:How should the grader do the top of the lime soil and how to operate after the dust spot? Thank you!
Like you, before you need to be sure how much is your own time lifting shovel blade, so no matter or write the number of dot is very simple
Q:How much money a grader
It depends on the model.I wonder if you need that model Generally used about 50 to 600 thousand of imported two million. If you want to make money to buy second-hand recommend general two can buy a good point.
Q:What role does the balancing box of the grader play?
Balance is the most obvious including the overall frame is the most important is that it can ensure the smooth and inclined blade and work efficiency in order to avoid grader travel and work in Complex Pavement
Q:What is the difference between grader and paver? Can you specify the construction process?,
Likewise, the grader is efficient and saves money, but the evenness is not as good as the paver

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Hot Searches

Related keywords