• JS Elastomeric Compound Waterproofing Coating System 1
  • JS Elastomeric Compound Waterproofing Coating System 2
JS Elastomeric Compound Waterproofing Coating

JS Elastomeric Compound Waterproofing Coating

Ref Price:
get latest price
Loading Port:
China main port
Payment Terms:
TT OR LC
Min Order Qty:
10000 m²
Supply Capability:
50000 m²/month

Add to My Favorites

Follow us:


OKorder Service Pledge

Quality Product, Order Online Tracking, Timely Delivery

OKorder Financial Service

Credit Rating, Credit Services, Credit Purchasing

1.Structure of Compound Waterproof Coating Description:

Compound waterproof coating is a new green waterproof coating recommended by the ministry of construction of China. composite of two-component waterproof coating,organic liquid and inorganic powder. It has the advantage of   high elasticity of organic material  and advantages of good durability of inorganic materials . After coated ,it can cover can form high elastic high-strength waterproof coating, and can be according to need to make color coating.All kinds of old and new buildings (example: the roof of the building, underground, external wall, toilet bath and tunnels, Bridges, pool, etc.) for waterproof engineering all can be used.

2.Main Features of Compound Waterproof Coating:

•High strength, water resistance, weather resistance, excellent durability

•Can be added pigment, in order to form colour coating

Non-toxic, tasteless, no pollution in cold constructionsafe and simple, short time for construction

High temperature  up to 140 ℃

3.Compound Waterproof Coating Specification:

 NameTest ItemIndex

Compound Waterproof CoatingSolid content92%


Tensile strength

Mpa

1.9


Elongation at break550%


Flexibity at low temperature 
 
≤-40


4.Compound Waterproof  Coating Image:

JS Elastomeric Compound Waterproofing Coating

Q:How do you make waterproofing in the kitchen and bathroom?
Fatty acid cement mortar waterproofing agent; integrated current domestic and foreign new waterproof material of the latest technology, in the original polymer cement mortar waterproofing agent developed on the basis of raw materials imported from Germany, the higher fatty acid materials, by more than 20 kinds of raw materials by the special complex Chemical reaction of water-based emulsion, a new type of fatty acid cement mortar waterproofing agent.
Q:How does the finished ventilator manufacturer waterproof?
Rooftop natural ventilator waterproofing measures are mainly two kinds, one is the traditional silicone, adhesive tape waterproof, the other is the structure of water, the national standard Atlas 11CJ33 "ventilation and light skylight" recommended the use of structural waterproof technology.
Q:What material is used for waterproofing of tarpaulin
Regardless of the construction or finished products are toxic, due to organic materials, it will form a separation layer, partition structure of poor wear resistance, must be a protective layer of solid, not hollowing, but requires the base surface moisture content of less than 8% overlap requirements No interface to form a seamless body thickness control easy to control the local thickness difficult to control
Q:Self-built concrete house finished three years after the use of large-scale housing wall leakage how to do?
Second, the chisel in addition to the wall structure to the wall structure for waterproof construction, you can use the material coating, membrane and infiltration of crystallization, the quality is different.
Q:Find the construction steps for waterproof coatings
3, note (1) rain weather and five wind above the weather shall not be construction. (2) coating waterproof layer shall not have bottom leakage, cracking, holes and other defects and peeling, bubbling, carcassing and wrinkle phenomenon. Coating waterproof layer and the base should be bonded between the solid, no hollowing, trachoma, delamination and so on. (3) the coating site should be continuous, solid, shall not appear Alice, hollowing parts. (4) rigid protective layer before the completion of any personnel shall not enter the construction site, so as not to damage the waterproof layer; coating of the overlapping parts should be care by the staff. (5) roof should be used lime soil, clay or sub-clay for backfill, thickness 50 cm, backfill shall not contain stones, gravel, ash and organic matter. Artificial compaction of each layer 25 cm, mechanical compaction of each layer 30 cm, rammed to prevent damage to the waterproof layer. In the backfill thickness of more than 50 cm, it is allowed to use mechanical backfill rolling.
Q:Roof for the insulation, Master roof, using two waterproof construction program
Fourth, the finished product protection 1, has been laid the membrane waterproof layer, should be taken to protect the facilities, is strictly prohibited in the waterproof layer on the construction operations and transportation, and should be timely to do the protective layer of the waterproof layer. 2, through the roof, wall waterproof layer at the pipeline, construction and after the completion of damage shall not damage. 3, deformation joints, water, etc., before the construction of waterproof layer, should be temporary closure, waterproof layer is completed, should be cleared to ensure that the tube, sewn smooth, to meet the use of function. 4, roof construction shall not pollute the walls, cornices and other finished products.
Q:What are the materials used in the ceiling?
Kitchen bathroom ceiling material 3: waterproof gypsum board ????Waterproof gypsum board is in the gypsum core by adding a certain amount of waterproof plastic made of products, so waterproof gypsum board has a certain waterproof function, while gypsum board paper is also a waterproof measures, is a more widely used materials. Waterproof gypsum board with the effect of thermal insulation, but also has the advantages of fire, noise, but also an easy decoration materials. There is also a feature of the characteristics of environmental protection, due to the use of natural gypsum as a raw material, in the home environmental protection is guaranteed.
Q:What decoration materials, light and water, and the wall, the perfect combination of glass
Five, scraping gum The excess residue of the material to be scratched, scraping plastic tool angle consistent, at one go, scraping gum immediately after the completion of tearing tape or grain pattern paper. Remove the excess glass compound, if stains, can be removed with a damp cloth. Six, finished product protection Do not touch within 24 hours, do not press within 48 hours.
Q:How does the waterproofing membrane work?
3, the ignition: first open the liquefied gas cylinder switch, and then hand gun slowly open the gun switch, to be heard when the gas hissing sound, ignite the flame, and then adjust the switch, the flame was blue. Ignite people should stand behind the nozzle side, so as not to be burned by fire;
Q:Can acrylic materials be perforated? How to do waterproof after punching?
Or in the back with glass adhesive paste anti-corrosion nine PCT board (if the hole is flat, Anti-corrosion nine PCT is to remove the other side of the paste surface with asphalt anti-corrosion paint brush)

1. Manufacturer Overview

Location
Year Established
Annual Output Value
Main Markets
Company Certifications

2. Manufacturer Certificates

a) Certification Name  
Range  
Reference  
Validity Period  

3. Manufacturer Capability

a)Trade Capacity  
Nearest Port
Export Percentage
No.of Employees in Trade Department
Language Spoken:
b)Factory Information  
Factory Size:
No. of Production Lines
Contract Manufacturing
Product Price Range

Send your message to us

This is not what you are looking for? Post Buying Request

Similar products

New products

Hot products


Related keywords